Municipal Guide Tennessee Sumner County

Sumner County Building Permit — Filed & Tracked For You

Everything contractors, builders, and developers need to pull a Sumner County building permit — the Building and Codes Department in Gallatin, the Adequate Facilities Tax that is a prerequisite to a permit and reaches even the incorporated cities, the 2021 codes the county adopted in 2023, the certified address and septic approvals that come first, and the state electrical permit that runs alongside the county building record.

Authority: Sumner County Building and CodesCodes: 2021 International CodesDistinctive: Adequate Facilities Tax on new development
Authority
Building and CodesSumner County Building and Codes, Gallatin
Codes
2021 ICCAdopted by the county in 2023
Growth tax
Adequate Facilities TaxPer-square-foot on new development
Electrical
State permitThrough the state CORE system

Sumner County Building and Codes, at 355 N. Belvedere Drive in Gallatin, is the building authority for unincorporated Sumner County. The county enforces the 2021 International Codes it adopted in 2023, and collects the Adequate Facilities Tax that gates new development — including, through a certificate requirement, permits issued by the cities.

The Adequate Facilities Tax is the feature to plan around. It is a per-square-foot privilege tax on new residential, commercial and industrial development under the 1999 Private Act, payable at permit issuance, and even Gallatin, Hendersonville and Goodlettsville require a county certificate that it is paid before they issue. Electrical is generally a state permit, so budget for two authorities on a typical build.

Scope: unincorporated Sumner County through Building and Codes. Gallatin, Hendersonville, Goodlettsville, Portland, White House and others permit their own work — but the county AFT reaches them.

📍

The Adequate Facilities Tax follows the project into the cities. Even a permit issued entirely inside Gallatin or Hendersonville requires a certificate from the county building inspector that the county AFT has been paid, and a city that issues without it becomes liable to the county for the tax. So account for the AFT wherever in Sumner County you build, and confirm the current per-square-foot rate with the AFT coordinator before you bid.

What requires a permit in Sumner County?

Sumner County Building and Codes, at 355 N. Belvedere Drive, Room 208 in Gallatin, is the building authority for unincorporated Sumner County. The cities inside it — Gallatin, Hendersonville, Goodlettsville, Portland, White House, Millersville and Westmoreland — run their own permitting, so a parcel inside a municipality goes to the city rather than the county. The department administers plan review, permitting and inspections and also handles health, safety and property maintenance.

The distinctive feature here is the Adequate Facilities Tax (AFT). Under Chapter 57 of the Private Acts of 1999, Sumner County imposes a per-square-foot privilege tax on new residential, commercial and industrial development, payable at the time the building permit is issued, to help pay for the public facilities that growth requires. It is collected at the county Building and Codes office, and there is a dedicated AFT coordinator. Tennessee does not have one permitting model, it has three, and which one applies decides who your building official actually is. A jurisdiction that has adopted codes meeting the state minimum and enforces them is an exempt jurisdiction: it runs its own plan review, permits and inspections, and the state stays out except for state buildings, schools and a handful of licensed occupancies. A jurisdiction that has not is non-exempt, and the State Fire Marshal's Office is the building official there, working through contracted deputy building inspectors who cover several counties each. And a jurisdiction that has passed a two-thirds resolution under T.C.A. § 68-120-101(b)(1)(B) is an opt-out or non-code jurisdiction, where one- and two-family dwellings sit outside the statewide standards altogether.

What surprises people is that the AFT reaches into the cities. When a building permit is issued by one of Sumner County's incorporated cities, the city must first require a valid certificate from the county building inspector that the full county AFT has been paid — and a city that issues without that certificate becomes liable to the county for the tax. So even a permit pulled entirely inside Gallatin or Hendersonville carries a county step. The county enforces the 2021 editions of the International Codes, adopted by resolution in 2023.

No political subdivision of Tennessee may adopt or enforce standards of fire prevention, fire protection or building construction that are less stringent than the state minimum. Local amendments can add to the code; they cannot subtract from it.

Permit required

  • New residential and commercial construction, and additions
  • Structural alterations, repairs, and changes of occupancy
  • Accessory structures above the county threshold
  • Swimming pools and their required barriers
  • Decks, and exterior structural work
  • Plumbing, mechanical, and gas work
  • Electrical work — generally a state permit
  • New development subject to the Adequate Facilities Tax

Typically exempt

  • Painting, flooring, and cosmetic finishes
  • Routine maintenance not altering structure or a regulated system
  • Work inside Gallatin, Hendersonville, Goodlettsville, or another city
  • Minor work below the county's published thresholds
⚠️ The Adequate Facilities Tax is a prerequisite, not an afterthought. The county collects the AFT at building permit issuance, and even the incorporated cities require a county certificate that the AFT has been paid before they will issue their own permit. Budget for it as part of the cost of building anywhere in Sumner County, and get the county building permit issued before work starts.

Sumner County building department: who handles permitting

Building and Codes is a multi-role office: it runs plan review, permitting and inspections for the unincorporated county, administers the Adequate Facilities Tax, and handles property maintenance and health-and-safety violations. Addresses are assigned by Sumner County Emergency Services rather than by the codes office, so a new parcel needs its address established before a permit application is complete.

The AFT is the step most likely to catch someone building for the first time in Sumner County. It is a per-square-foot tax under the 1999 Private Act, and because it is assessed at issuance and reaches the cities through the certificate requirement, there is no way to build new square footage in the county — city or unincorporated — without accounting for it. Confirm the current rate with the AFT coordinator before you price a project.

Two other county desks sit alongside the building permit. A driveway or road access permit comes from the Sumner County Highway Department, and on a septic property the TDEC approval has to be in hand first. Neither is issued by Building and Codes, and both take their own time, so line them up early rather than discovering them at the counter.

Sumner County permitting contact
DetailInformation
AuthoritySumner County Building and Codes Department
CoversUnincorporated Sumner County
Cities running their ownGallatin, Hendersonville, Goodlettsville, Portland, White House, and others
Office355 N. Belvedere Drive, Room 208, Gallatin, TN 37066
Phone(615) 452-1467
Codes enforced2021 International Codes, adopted by resolution in 2023
Adequate Facilities TaxPer-square-foot on new development; certificate required before city permits
AddressesAssigned by Sumner County Emergency Services
ElectricalGenerally a state permit via CORE
💻

Account for the AFT before you price the job. The Adequate Facilities Tax is a per-square-foot county tax on new development, collected at permit issuance, and even the cities require a county certificate that it is paid before issuing. Confirm the current rate with the AFT coordinator, and get your address assigned by Emergency Services before you file.

Confirm from the parcel whether the site is unincorporated Sumner County or inside Gallatin, Hendersonville, Goodlettsville or another city, because the permitting office changes at the city line — though the county Adequate Facilities Tax follows the project into the cities through the certificate requirement, so the county is rarely out of the picture entirely.

Sumner County permits: record types and what each covers

Sumner County runs residential and commercial building records, with the Adequate Facilities Tax attaching to new development. These are the records you are likely to file:

Residential permit types

Residential permit types in Sumner County
Permit typeWhat triggers itReview pathFee basis
New constructionNew dwellings, additions, and accessory structures above the local size thresholdPlan review against the adopted residential code, plus zoning; the state floor is the 2018 IRC with Appendix QValuation-based
AdditionAdded interior space, including additions of thirty square feet or moreStructural and energy review; the thirty square foot interior trigger is smaller than most applicants expectValuation-based
Renovation / alterationStructural changes, layout changes, or added plumbing, mechanical, or electricalPlan review scaled to scope; renovations of existing one- and two-family dwellings sit outside the state minimum standardsValuation-based
ReroofRoof covering replacement, recover, and structural deck repairDeck and dry-in inspection; plan review rarely requiredValuation or squares
Solar photovoltaicRooftop or ground-mount arrays, with or without battery storageStructural review of the attachment locally, with the electrical scope usually permitted and inspected by the stateFlat or system-size based
Battery energy storageWall or floor-mounted storage added to a dwellingElectrical review plus fire separation and location checkFlat or per-permit minimum
ElectricalService changes, panel upgrades, new circuits, EV chargers, and rewiringIn most of Tennessee a state record bought through CORE and inspected by a contracted Deputy Electrical Inspector, not a local onePer-permit or per-device
PlumbingNew piping, repipes, fixtures, gas piping, and water heater replacementTrade review; performed by a licensed plumber or a Limited Licensed Plumber below the contractor thresholdPer-permit minimum or per-fixture
Mechanical / HVACChangeouts, new ductwork, and refrigerationTrade review; the contractor licence attaches once the trade portion reaches the statutory thresholdPer-permit minimum or per-unit
Deck and porchNew decks, screened porches, and structural rebuildsStructural review of footings, ledger attachment, and guardsValuation or flat
Swimming poolIn-ground and above-ground poolsBarrier, bonding, and electrical review; the bonding scope generally follows the state electrical recordValuation or flat
Manufactured home set-upPlacing or re-siting a manufactured homeZoning, floodplain, and anchoring review; manufactured homes sit outside the state minimum building standards but not outside local zoningFlat or per-unit
DemolitionFull or partial demolition of a dwelling or accessory structureUtility disconnect confirmation and site restoration checkFlat
New single-family dwellingBuilding a new home in the unincorporated countyBuilding review against the 2021 codes, with the AFT at issuancePer-square-foot AFT plus permit fee
Addition with new square footageAdding conditioned floor area to a homeBuilding review, with the AFT assessed on the new square footagePer-square-foot AFT plus permit fee

Commercial permit types

Commercial permit types in Sumner County
Permit typeWhat triggers itReview pathFee basis
New commercial constructionGround-up commercial, industrial, and institutional buildingsConcurrent review against the adopted building code, fire, and zoning; the state floor is the 2021 IBC with Tennessee amendmentsValuation-based
Tenant improvement / upfitInterior fit-out of an existing tenant spaceBuilding, trade, and life-safety review; accessibility attaches on change of useValuation-based
Change of occupancyConverting a building or space to a different use groupOccupancy classification, egress, and accessibility reviewValuation or flat
Commercial electricalService, distribution, and branch circuit workState record in most jurisdictions unless the municipality is one of the roughly thirty-five authorised to inspect its own electricalPer-permit or valuation
Commercial plumbingProcess piping, fixtures, backflow, and grease wasteTrade review; backflow and grease interceptor sign-off where applicablePer-fixture or valuation
Commercial mechanicalRooftop units, kitchen exhaust and hood systems, and refrigerationTrade review; hood and suppression systems draw fire review alongside mechanicalPer-unit or valuation
Commercial reroofRoof covering replacement on a commercial structureDeck, dry-in, and attachment inspectionValuation or squares
SignageWall, ground, and illuminated signsZoning review for size and placement, plus electrical where illuminatedFlat or per-sign
Land disturbanceClearing, grading, and stormwater-triggering site workErosion and sediment control review, separate from the building permitAcreage-based
Commercial demolitionFull or partial demolition of a commercial structureUtility disconnect, asbestos notification, and site restorationFlat or valuation
State Fire Marshal plans reviewOccupancies requiring State Fire Marshal approval, including schools and certain licensed facilitiesFiled with the state through the plans submittal portal, in addition to and not instead of the local recordState fee schedule
Commercial new constructionA new commercial building in the countyFull building review, with the AFT on the new square footagePer-square-foot AFT plus permit fee
Industrial developmentA new industrial building or expansionBuilding review, with the AFT at its industrial per-square-foot ratePer-square-foot AFT plus permit fee

Residential

  • Single-discipline review in most cases
  • The electrical record is usually a separate state permit, not a line on the building permit
  • Contractor licence attaches at the statutory threshold; a Home Improvement licence may apply below it in nine counties only
  • Septic properties need TDEC approval before ground is broken

Commercial — multi-discipline

  • Concurrent review across building, trades, fire, and zoning
  • Signed and sealed plans across every affected discipline
  • The licensee's monetary limit caps the job value, separately from the permit
  • Accessibility and life-safety review attach to any change of occupancy

Records you will actually see in Sumner County

Sumner County record catalog
RecordWhat it covers
Residential building permitNew homes, additions, alterations, and repairs
Commercial building permitCommercial construction and tenant work
Accessory structureAbove the county threshold
Swimming poolWith barrier and bonding review
Plumbing permitNew piping, repipes, fixtures, and gas piping
Mechanical / gas permitHVAC changeouts, ductwork, and gas work
State electrical permitThrough core.tn.gov, not the county
Demolition permitFull or partial demolition

Solar permits in Sumner County

Solar is reviewed on two tracks at once in Tennessee, and in most of the state those two tracks belong to two different governments. The structural side — attachment detail, rail spacing, and whether the existing framing carries the added dead load — is a local building review. The electrical side — conductors, overcurrent protection, rapid shutdown, labelling, and the service or supply-side connection — usually runs on a state electrical record instead, against the National Electrical Code edition the state programme enforces.

A residential solar installation in unincorporated Sumner County is a county building permit for the structural attachment plus a state electrical permit for the wiring and interconnection, since electrical here is generally a state record through CORE rather than a county one. The local power company sets the meter release and usually waits on an approved electrical inspection, so line up the state electrical permit alongside the county building permit and confirm the interconnection requirements with the power company early. A ground-mounted array on a separate structure can draw its own structural review.

That split is the most common cause of a stalled Tennessee solar job. An installer who files the building record locally and assumes the electrical inspection comes with it will sit waiting for an inspector who was never booked. Confirm at the outset whether your jurisdiction is one of the roughly thirty-five municipalities authorised to run its own electrical inspections, or whether the electrical permit has to be bought from the state.

Interconnection runs on a third clock. Tennessee is served by the Tennessee Valley Authority through local power companies — municipal electric systems and rural electric cooperatives — and each sets its own application, meter and witness-test sequence. Permission to operate is not something the building department controls, so plan for the tracks to finish at different times.

Roofing permits in Sumner County

A roof covering replacement needs a permit in most Tennessee jurisdictions that enforce their own codes. The permit is usually quick, but it is not optional, and the inspection that matters happens before the covering goes on rather than after.

Tennessee has no statewide product-approval database, so there is no approval number to search for or cite on the application. The assembly has to comply with the adopted code and the manufacturer's listed installation instructions, and that pairing is what the inspector checks — which makes the manufacturer's instructions a document worth having on site.

A re-roof in unincorporated Sumner County is a county building permit reviewed against the 2021 codes, covering the structural and weatherproofing requirements for the new covering. A like-for-like replacement is straightforward, while adding load — heavier tile over asphalt, for example — or altering the roof structure draws closer review. Keep the permit and approved scope on site, and provide a ladder for the roof inspection, since the county requires access for a roof-mounted check.

Sequencing is where reroofs go wrong. The deck and dry-in condition has to be visible when the inspector arrives, so covering it first means opening it back up. Where a previous layer has been torn off, expect attention to deck fastening and to any sheathing replaced along the eaves. Note also that a roofing subcontractor is licensed on the value of the roofing portion alone once that portion reaches the statutory threshold.

Record types, document sets, and fee structures are set by local ordinance and change without notice. Confirm the current catalog against the official portal before you file.

Sumner County permit cost

Two separate charges drive the cost of building in Sumner County. The building permit fee is set by Building and Codes against the submitted scope, and the Adequate Facilities Tax is a per-square-foot privilege tax under the 1999 Private Act, assessed at issuance. The AFT is the one most likely to be underestimated, because it scales with square footage rather than being a flat fee, and it applies to commercial and industrial as well as residential development.

Because electrical is generally a state permit here, the electrical cost is a state fee through CORE rather than a county line item. Confirm the current building permit fee and AFT rate with the department before budgeting, and remember the AFT reaches a project even when the building permit itself is issued by one of the cities.

How Sumner County fees are structured
Fee componentHow it works
Building permitSet by Building and Codes against the submitted scope
Adequate Facilities TaxPer-square-foot on new residential, commercial and industrial development
AFT and the citiesCity permits require a county certificate that the AFT is paid
ElectricalState permit fee via CORE, not a county line item
DrivewayAccess permit from the Sumner County Highway Department
Septic propertiesTDEC approval required before ground is broken
ConfirmCurrent fee and AFT rate with Building and Codes before budgeting
🧮

Want a precise number for a specific Sumner County project? Send us the scope and we will price the permit path before you file.

Sumner County trade permits

Electrical is generally a state permit; plumbing, mechanical and gas follow the normal contractor rules. Four Sumner specifics decide whether your application moves:

The AFT attaches to new square footage

The Adequate Facilities Tax is assessed per square foot on new development at permit issuance, and it reaches city permits through the county certificate requirement. Price it into any new build in Sumner County, city or unincorporated, before you bid.

Electrical is generally the state's

Sumner County is not among the roughly thirty-five Tennessee municipalities authorised to run their own electrical inspections, so the electrical record is usually a state permit through CORE, inspected by a state-contracted Deputy Electrical Inspector. Confirm rather than assuming it comes with the building permit.

The address has to exist first

Addresses are assigned by Sumner County Emergency Services, not the codes office. A new parcel needs its address established before the permit application is complete, so start that step early.

City or county, decided from the parcel

The county permits the unincorporated area; Gallatin, Hendersonville, Goodlettsville and the other cities permit their own work. Confirm the parcel before you file — though the county AFT follows the project either way.

🧢 Tennessee licenses contractors through the Board for Licensing Contractors at the Department of Commerce and Insurance. A licence is required to bid, negotiate or perform construction work where the total contract value including labour and materials is twenty-five thousand dollars or more, under T.C.A. § 62-6-102. The threshold reaches subcontractors on their own portion: electrical, mechanical, plumbing, HVAC and roofing subcontractors need the licence once their share hits the same figure, while masonry subcontractors are licensed at one hundred thousand dollars and above under T.C.A. § 62-6-111(d). One licensing rule that does not apply here is worth stating plainly, because contractors moving across the state assume it does. Tennessee's Home Improvement licence, which covers residential improvement work from three thousand dollars to just under twenty-five thousand, exists only in the nine counties that opted in: Bradley, Davidson, Hamilton, Haywood, Knox, Marion, Robertson, Rutherford and Shelby. This jurisdiction is not among them, so below the twenty-five thousand dollar contractor threshold there is no separate state home improvement credential — though local registration and the trade licences still apply. The trade credentials sit apart from the contractor licence. Electrical work at or above the threshold runs under the contractor licence carrying the CE classification, which covers all electrical categories for residential, commercial and industrial work and is accepted statewide. Below it, Tennessee issues the Limited Licensed Electrician and Limited Licensed Plumber credentials, and local governments may run their own journeyman or master licences for work under twenty-five thousand dollars. Check the local requirement as well as the state one before you bid.

Sumner County permit application: how to apply step by step

Here is how to get a building permit in Sumner County, from confirming the requirement through to close-out. Each step below corresponds to a real decision point where projects commonly stall.

1. Confirm the parcel is unincorporated Sumner County

Gallatin, Hendersonville, Goodlettsville and the other cities permit their own work. Settle jurisdiction from the parcel before you start — but note the county Adequate Facilities Tax applies either way.

2. Get the address assigned and the septic approval

Addresses are assigned by Sumner County Emergency Services. On a septic property, obtain the TDEC approval before the county can issue. Both are prerequisites, not closing items.

3. Design to the 2021 codes and prepare documents

Design to the 2021 International Codes the county adopted in 2023. Prepare plans, a plot plan showing distances from property lines, and any driveway access permit from the Highway Department.

4. Budget for the Adequate Facilities Tax

Confirm the current per-square-foot AFT rate with the AFT coordinator and include it in the project cost. It is assessed at permit issuance and scales with square footage.

5. Apply, clear review, and pay

File with Building and Codes, clear plan review against the 2021 codes, and pay the building permit fee and the AFT. Electrical is a separate state permit through CORE.

6. Schedule inspections and close out

Book county building inspections, run the state electrical inspection on its own track, and carry the project through to the certificate of occupancy before legal use.

Inspections in Sumner County

County building inspections are scheduled against the issued permit, with typical checkpoints running footing and foundation, trade rough-ins, framing, insulation and final, reviewed against the 2021 International Codes. During construction the approved construction documents, permit card and inspector signature cards should be available on site, and a ladder must be provided for any roof-mounted inspection.

Electrical inspections run on the state's track through CORE, arranged and regulated by the state rather than the county. On a project that also draws a driveway access permit or a septic authorisation, keep those sequences straight — each has its own authority, and a hold on one is not a hold on another.

The Adequate Facilities Tax is settled at issuance rather than at inspection, so by the time a project reaches its inspections the AFT is behind it — but on a change of occupancy or an addition, confirm what was previously permitted against what is standing, because unpermitted square footage surfaces there and can carry its own AFT question.

Keep the approved documents, permit card and inspector signature cards on site, and provide a ladder for roof-mounted inspections. On an existing building, confirm the permit history against what is standing before a change of occupancy or an addition.

Sumner County permit search and official resources

Sumner County publishes its Building and Codes information, adopted codes and Adequate Facilities Tax details online, with the state licensing and electrical resources that sit alongside them.

Frequently asked questions

Who issues building permits in Sumner County, TN?

Sumner County Building and Codes, at 355 N. Belvedere Drive, Room 208 in Gallatin, for unincorporated Sumner County. Gallatin, Hendersonville, Goodlettsville, Portland, White House and the other cities run their own permitting. The department line is (615) 452-1467.

What is the Adequate Facilities Tax in Sumner County?

A per-square-foot privilege tax on new residential, commercial and industrial development, imposed under Chapter 57 of the Private Acts of 1999 and payable when the building permit is issued. It helps pay for the public facilities that growth requires, and it is collected at the county Building and Codes office.

Does the Adequate Facilities Tax apply inside the cities?

Yes. When one of Sumner County's incorporated cities issues a building permit, it must first require a valid certificate from the county building inspector that the full county AFT has been paid. A city that issues without that certificate becomes liable to the county for the tax, so even a city permit carries a county AFT step.

Which building code does Sumner County enforce?

The 2021 editions of the International Codes, adopted by county resolution in 2023. As a local building authority under the statewide minimum standards, the county's adopted set governs, so confirm the current editions with the department before you design.

Does Sumner County issue electrical permits?

Generally no. Sumner County is not among the roughly thirty-five Tennessee municipalities authorised to run their own electrical inspections, so the electrical record is usually a state permit through CORE, inspected by a state-contracted Deputy Electrical Inspector.

How do I get an address for a new parcel in Sumner County?

Addresses are assigned by Sumner County Emergency Services, not the codes office. A new parcel needs its address established before the building permit application is complete, so start that step early in the process.

Do I need a contractor licence in Sumner County?

A Tennessee contractor licence is required to bid or perform work valued at twenty-five thousand dollars or more, including labour and materials, and the same threshold reaches trade subcontractors on their own portion.

Do I need a Home Improvement licence in Sumner County?

No. Sumner is not one of the nine Tennessee counties that require the Home Improvement licence. Below the twenty-five thousand dollar contractor threshold there is no separate state home improvement credential here, though local registration and trade licences still apply.

Do I need a septic approval before a building permit in Sumner County?

On a parcel without public sewer, yes. The state's TDEC subsurface sewage disposal program issues the septic permit, and it must be in hand before the county can issue the building permit. The system is sized to bedroom count, so adding bedrooms needs its own approval.

Where does a driveway permit come from in Sumner County?

From the Sumner County Highway Department, separately from the building permit. A driveway or road access permit is its own approval, so account for it when planning site access.

Does Sumner County check my HOA covenants?

No. Deed restrictions, covenants and subdivision regulations are private matters between the owner and the subdivision. A permit that clears the county can still breach a covenant, and the county will not have checked.

What do I need on site during a Sumner County inspection?

The approved construction documents, the permit card and the inspector signature cards should be available on site during construction. For any roof-mounted inspection, you must provide a ladder at the time of inspection.

Simplify Sumner County permitting with Alliance Permitting

Sumner County's Adequate Facilities Tax, its city-reaching certificate rule and its state electrical route reward applicants who price the AFT into the job, get the address and septic approvals first, and keep the county and state tracks straight.

250K+Permits approved
All 50States covered
21 YearsJurisdictional depth
Done-for-youWe file, you build

Trusted by leading builders, developers, and national contractors — 21 years of filing in the jurisdictions we write about.

Contractors and builders choose Alliance for Sumner County because the work is done by people who have stood at the counter:

  • Right authority — unincorporated county or one of the Sumner cities, resolved from the parcel.
  • AFT priced in — the per-square-foot Adequate Facilities Tax confirmed with the coordinator before the bid, including on city permits.
  • Prerequisites cleared — address assigned by Emergency Services and TDEC septic approval secured before filing.
  • Complete oversight — every Sumner building record, state permit and inspection tracked across your jobs in one place.

Alliance Permitting is a permit documentation and expediting service in Tennessee. We are not a law firm and do not provide legal advice, and we are not the permitting authority.

Ready to break ground in Sumner County sooner?

Let Alliance prepare, file, and track your Sumner County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Sumner County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.