Municipal Guide Tennessee Davidson County · Nashville Metro

Davidson County Building Permit Guide

Everything contractors, builders, and developers need to get a building permit in Davidson County — the Metro Codes & Building Safety department, ePermits and ePlans portals, fees, trade permits, and inspections.

Authority: Metro Codes & Building SafetyCode: 2024 I-Codes (IBC/IRC)Portal: ePermits & ePlans
Authority
Metro Codes & Building SafetyConsolidated w/ Nashville
Apply Online
ePermits + ePlansGeoCivix electronic review
Covers
All Davidson CountyConsolidated w/ Nashville since 1963
Code cycle
2024 I-CodesAdopted July 2025

Building permits in Davidson County are issued by the Metro Department of Codes and Building Safety — the same department that handles Nashville city permits. Nashville and Davidson County have operated as a consolidated Metro government since 1963, so there is no separate county permitting office.

This Davidson County building permit guide covers what requires a permit, how the consolidated Metro Codes process works, the ePermits and ePlans portals, fees, trade permits, and inspections.

📍

Davidson County = Nashville Metro. There is no separate "county" permitting office — the Metro Department of Codes and Building Safety handles all building permits for the entire consolidated Nashville–Davidson County area. This has been the case since 1963.

What requires a building permit in Davidson County?

Under the International Codes as adopted by Davidson County, a permit is required before constructing, enlarging, altering, repairing, moving, demolishing, or changing the occupancy of most structures. Common triggers include:

Permit required

  • New residential and commercial construction, additions
  • Structural and load-bearing alterations
  • Reroofing, windows, doors, and exterior changes
  • Electrical, plumbing, mechanical, and gas work
  • HVAC installations and changeouts
  • Decks, pools, fences, accessory structures
  • Change of occupancy or use
  • Pre-manufactured home placement

Typically exempt

  • Painting, flooring, cabinetry, and cosmetic work
  • One-story detached accessory structure ≤ 200 sq ft
  • Replacement of existing fixtures (like-for-like swaps)
  • Minor repairs not affecting structural or safety systems

Exemptions are narrow and scope-specific. When unsure, confirm with the building department before starting — see the penalty note below.

⚠️

Get the permit issued before starting work. Building without one exposes the owner to penalties and stop-work orders. Note that exemption from a building permit does not exempt a project from zoning requirements — confirm edge cases with the building department.

Who handles permitting in Davidson County?

Permitting, plan review, and inspections run through the Davidson County Metro Codes & Building Safety.

Davidson County permitting — contact
DetailInformation
OfficeMetro Codes & Building Safety — Howard Office Building, 700 2nd Ave S, Nashville, TN 37210
Phone(615) 862-6590
ApplyePermits & ePlans
CoversAll Davidson County
Code cycle2024 I-Codes (IBC/IRC)
HoursMonday–Friday, 8:00 AM – 4:30 PM (call to confirm)
📋

Contact the Metro Codes & Building Safety to apply. Submit your building permit application with construction plans and required documentation. Call (615) 862-6590 for current forms and requirements.

Davidson County building permit cost

Davidson County building permit fees are set by the county fee schedule and based on project type and valuation. Separate trade permit fees apply. Confirm current amounts with the Metro Codes & Building Safety.

How Davidson County fees are structured
Fee componentHow it works
Building permit feePer county fee schedule (type & valuation)
Plan review feeIncluded in or separate from permit fee
Trade permits (E / P / M / Gas)Separate fee per trade
Certificate of OccupancyRequired before legal occupancy
Work-without-permitPenalties + enforcement action
🧮

Want a precise number for a specific Davidson County project? Send us the scope and valuation and we'll return a fee estimate alongside a filing timeline.

Davidson County trade permits

Electrical, plumbing, mechanical, and gas permits are filed separately. Each requires a Tennessee-licensed trade contractor.

Electrical permits

Required for service upgrades, panel work, solar PV, and most wiring — performed by a TN-licensed electrical contractor.

Plumbing permits

Required for new plumbing, repipes, water heaters, and gas piping — performed by a TN-licensed plumber.

Mechanical (HVAC) permits

Required for HVAC installations, changeouts, ductwork, and refrigeration — performed by a TN-licensed mechanical contractor.

Miscellaneous & specialty

Reroofs, decks, pools, fences, accessory structures, and demolition are permitted separately.

🪪

Verify your contractor's license. Tennessee requires a state contractor license issued by the Tennessee Board for Licensing Contractors (under the Department of Commerce & Insurance / TDCI) for projects valued at $25,000 or more. Separate trade licenses are required for electrical (CE), plumbing, and HVAC/mechanical work. Homeowners may pull their own permit for personal-use construction once every 24 months under TCA § 62-6-103 — but the project must still meet all code and inspection requirements. Verify licensure at tn.gov/commerce/regboards/contractors.

How to get a building permit in Davidson County

Confirm jurisdiction & zoning

Verify the parcel is in unincorporated Davidson County (not within a municipality). Confirm zoning compliance.

Prepare application & plans

Complete the building permit application with construction plans, site plan, and required documentation.

Submit to Metro Codes & Building Safety

Deliver the application as directed — in person or through the county portal.

Plan review & corrections

Metro Codes & Building Safety reviews against adopted codes. Address comments and resubmit as needed.

Pay fees & pull the permit

Pay calculated fees. Post the permit card on site.

Schedule inspections through CO

Request inspections through the department. Clear all checkpoints for your Certificate of Occupancy.

Inspections in Davidson County

Schedule inspections through the Metro Codes & Building Safety. Typical checkpoints include footing/foundation, framing, rough-in MEP, insulation, and final. Post the permit and approved plans on site. A final inspection and CO are required before occupancy.

Address correction notices before requesting a re-inspection; a final inspection and Certificate of Occupancy are required before legal occupancy or use.

Official Davidson County permitting resources

Simplify Davidson County permitting with Alliance Permitting

Davidson County's permitting process rewards applicants who confirm jurisdiction, assemble complete packages, and submit correctly from the start. Alliance Permitting is a permit expediter for Davidson County — our permit expediting services pair AI-driven document review with experts who know the Metro Codes & Building Safety process, so your Davidson County submissions move faster.

250K+Permits approved
All 50States covered
AI + HumanExpert filing
Done-for-youWe file, you build

Trusted by leading builders and brands — including Dream Finders Homes, Tesla, Verizon, Hyatt, and Sunnova.

Contractors and builders choose Alliance for Davidson County because we deliver:

  • Local expertise — we know Davidson County Metro Codes & Building Safety and the unincorporated-area permitting requirements.
  • Complete oversight — track every permit and inspection across all your jobs in one place.
  • Error-free submissions — AI pre-checks plus expert review catch issues before they become correction cycles.

Alliance Permitting is a permit documentation and submission company: we prepare your paperwork, file it correctly, and coordinate with the building department through issuance — including preparing private-provider documentation where that option is available. We are not a contractor and do not perform licensed plan review or inspections; that work stays with your team and the jurisdiction.

Ready to break ground in Davidson County sooner?

Let Alliance prepare, file, and track your Davidson County permits while you stay focused on building. Get a free, no-obligation quote today.

This guide is provided by Alliance Permitting for general informational purposes and reflects publicly available information believed accurate as of June 2026. Permit requirements, fees, and processes change; always confirm current details with the Davidson County Metro Codes & Building Safety before filing. This is not legal advice.

Expedite Your Permits Today!

Free Quote1-855-478-4290