Skip to main content

Haskell County, Oklahoma Building Permit Guide

Haskell County and most of its towns issue no building permits; flood zones follow FEMA maps effective July 5, 2023, and septic goes through DEQ.

Authority: Haskell County (no county building permits)Flood maps: FEMA, effective July 5, 2023Phone: 918-967-4352
2025 population
11,787
County building permits
None
County seat
Stigler, City Hall 918-967-2164
Septic
Oklahoma DEQ

Haskell County issues no building permits: the state’s building code commission lists the county, and its towns of Keota, Kinta, McCurtain, Tamaha and Whitefield, as not issuing them. The county seat, Stigler, is not marked that way, but the City publishes no building permit process, so ask Stigler City Hall (918-967-2164) before building there. New FEMA flood maps for the county, Stigler, Keota, Kinta and McCurtain took effect on July 5, 2023.

Who handles permits in Haskell County?

For land outside the towns there is no county building permit or inspection. The commission’s list gives the county’s contact as 202 E. Main St., Stigler, phone 918-967-4352. Septic systems are permitted by the Oklahoma Department of Environmental Quality, and electrical, plumbing and mechanical work is done by contractors licensed by the Construction Industries Board.

Short on time to read all of this?

Get a free quote →
Towns in Haskell County
TownBuilding permitsFloodplain contact
StiglerNot marked as non-issuing; the City publishes no building permit process. City Hall, 115 S. Broadway, 918-967-2164City floodplain administrator, (918) 448-0151
KeotaNone issued (state list)Town, (918) 966-3655
KintaNone issued (state list)Town, (918) 768-3474
McCurtainNone issued (state list)Town, (918) 945-7209
Tamaha, WhitefieldNone issued (state list)Not on the state floodplain administrator list

The floodplain contacts come from the Oklahoma Water Resources Board’s list of local floodplain administrators, which does not list Haskell County itself.

Floodplain maps and approvals

FEMA’s final flood hazard determinations for “Haskell County, Oklahoma and Incorporated Areas” were published in the Federal Register on February 10, 2023, with the new Flood Insurance Rate Maps effective July 5, 2023. The communities named in that notice, and where their paper maps can be seen, are:

Not sure this scope needs a permit?

Get a free quote →
  • Unincorporated Haskell County: Haskell County Clerk’s Office, 105 Southeast 3rd Street, Unit C, Stigler
  • Stigler: City Hall, 115 South Broadway Street
  • Kinta: City Hall, 303 West Broadway
  • Keota: City Hall, 106 Main Street
  • McCurtain: Town Hall, 308 West Main Street
  • Choctaw Nation of Oklahoma: Office of Emergency Management, 3653 Big Lots Parkway, Durant

The same maps are online at the FEMA Map Service Center. For a lot in a mapped flood zone inside Stigler, Keota, Kinta or McCurtain, the contact is that town’s floodplain administrator.

Fees

Because neither the county nor most of its towns issue building permits, there is no county building permit fee schedule. Stigler has not published one either; City Hall can say whether a fee applies to a particular job.

Rather talk it over?

Call 1-855-478-4290 →

Building in Haskell County, step by step

1. Place the lot

Check whether it is inside Stigler, Keota, Kinta, McCurtain, Tamaha or Whitefield, or in the unincorporated county.

2. Check the 2023 flood maps

Look the address up on the FEMA Map Service Center, then call the town’s floodplain administrator if it is in a mapped zone.

3. Ask Stigler first if you are in the city

Call City Hall at 918-967-2164 about any city permit, water, sewer or street work.

4. Arrange septic with DEQ

Lots without city sewer need a DEQ permit for the on-site system.

5. Hire licensed trades

Use Construction Industries Board licensees for electrical, plumbing and mechanical work.

Inspections

No county building inspections are carried out. Septic installations fall under DEQ’s on-site sewage program, and any Stigler inspection requirement comes from City Hall.

Local details

Stigler council: the City Council meets on the second Monday of each month at 7 p.m. in the Council Chambers at 115 S. Broadway; City Hall’s fax is 918-967-2082.

Name twins: the town of Haskell is in Muskogee County, not Haskell County, and has its own town government.

Rather not deal with the Haskell County building department?

Get a free quote →

Oklahoma building code

Oklahoma sets statewide minimum codes (the 2024 editions since September 14, 2026) that cities enforce and may strengthen; most counties issue no building permits for unincorporated land, though a few do. Oklahoma rules

Official Haskell County permit resources

These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.

Want this handled start to finish?

Get a free quote →

Haskell County permit FAQs

Do I need a county building permit in Haskell County?

No. The state building code commission lists Haskell County as not issuing building permits, and there is no county inspection program.

Does Stigler issue building permits?

The state list does not mark Stigler as non-issuing, but the City publishes no permit process. Call City Hall at 918-967-2164 before you build.

When did the Haskell County flood maps change?

FEMA’s new Flood Insurance Rate Maps for the county and its incorporated areas took effect on July 5, 2023.

Inspections are where schedules slip.

Get a free quote →

Who permits a septic system in Haskell County?

DEQ, the Oklahoma Department of Environmental Quality; the county has no septic or building permit of its own.

Simplify Haskell County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Oklahoma. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Haskell County sooner?

Let Alliance prepare, file, and track your Haskell County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Haskell County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.