Building permits in Upper Arlington come from the Building Division of the city’s Community Development Department at 3600 Tremont Road (614-583-5070), where Roger Eastep is Chief Building Official and Chad Gibson is Community Development Director. Applications go through the OpenGov portal and are reviewed in the order received, in 7 to 10 business days for residential permits and 10 to 15 for commercial. Fees combine flat application and review charges with a percentage of construction value: a residential addition pays 1.25% of its value plus $225 in fixed fees and the state 1%.
What requires a building permit in Upper Arlington?
The city’s fee table doubles as its list of building permits: additions, interior remodels and basements, new buildings, solar panels, detached garages, covered patios, decks, accessory structures of 200 square feet or more, swimming pools, and a “multiple or other” category. Separate trade permits cover electrical, gas, HVAC, plumbing and sewer work, and demolition and signs have their own permits.
Building permit
- Additions and new houses or commercial buildings
- Interior remodels and basement finishes
- Detached garages, covered patios and decks
- Accessory structures of 200 square feet or more
- Swimming pools and solar panels
Zoning or trade permit
- Fences: $50 fence permit
- Certificate of zoning compliance: $50
- Plumbing: boilers, water heaters, water meters and any added, altered or removed supply or waste lines
- Electrical, gas, HVAC and sewer work
- Demolition, which in the Historic District can face a six-month delay
The path through review depends on whether the footprint changes. A new building or an addition goes through zoning review before building review, while an interior remodel skips zoning and goes straight to the trade permit step after its building application.
What Upper Arlington decides and what the state holds
Upper Arlington reviews and inspects residential and commercial work with its own staff and contracted plans examiners and inspectors, under Chapter 13 of its codified ordinances and the state codes. The city sets its fees, registers contractors under Chapter 747, applies its Unified Development Ordinance, and has its own Board of Building Standards that advises City Council on amendments to the residential building code and hears appeals. The state writes the codes, receives 1% of residential and 3% of commercial permit fees, and licenses commercial electrical, HVAC, plumbing, hydronics and refrigeration contractors.
Short on time to read all of this?
Get a free quote →Upper Arlington building department: who handles permitting
All of Upper Arlington is in Franklin County, and the Community Development Department’s Building Division issues every building and trade permit inside the city. Its offices are in the Municipal Services Center at 3600 Tremont Road, where printed city street maps are also available. The department has three divisions, Planning, Building and Code Compliance, and uses a mix of city employees and contracted plans examiners, electrical inspectors and building inspectors. Residential plans are reviewed by the Chief Building Official and commercial plans by the Commercial Plans Examiner. After construction, the Code Compliance division, called the Property Maintenance Division on the department page, works with owners to keep building exteriors maintained, aiming for voluntary compliance.
| Detail | Information |
|---|---|
| Office | Community Development Department, 3600 Tremont Road, Upper Arlington, OH 43221 |
| Phone | 614-583-5070 (city main line 614-583-5000) |
| Inspection lines | Building 614-583-5080; electrical 614-583-5081 |
| Hours | Monday to Friday, 8 a.m. to 5 p.m. |
| Chief Building Official | Roger Eastep |
| Department head | Chad Gibson, Community Development Director |
| Plumbing inspections | Franklin County Public Health, 614-525-3160 |
Upper Arlington permit types
Building and trade applications are filed in the city’s OpenGov portal, which is also used for inspections. Every application is date-stamped when it arrives and reviewed in order, and the city lays the process out in five steps: application and plans, zoning review, building review, trade permits and inspections.
Residential permits
- Additions pay a $75 application fee, $75 planning review, $75 building review and 1.25% of construction value.
- Interior remodels and basements pay the same three $75 charges and 1% of value, and skip zoning review unless the footprint changes.
- Garages, covered patios, decks, larger accessory structures and pools pay $225 in fixed fees and 1% of value.
- Solar panels pay only the $75 application and $75 building review; planning review and the permit fee are free.
- New houses pay a $225 application fee, $75 planning review, $75 building review and 0.5% of value, and the city’s documents include a new home notification form and an engineering residential plan review checklist.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
Commercial applications pay a $225 application fee and $75 planning review, with building review billed at an hourly rate. The permit fee is 0.5% of construction value for additions and new buildings and 0.75% for interior remodels and other work. Commercial building permits are reviewed in 10 to 15 business days, commercial trade permits in the same time, and commercial inspections are made every business day.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning review. The Planning Officer checks every footprint change against the Unified Development Ordinance; on new buildings the Engineering Division and the Parks and Recreation Department review the plans too. A certificate of zoning compliance is $50, and the zoning worksheet is free.
- Variances and BZAP. If plans do not meet the ordinance, the owner redesigns or asks the Board of Zoning and Planning for a variance, which requires practical difficulties unique to the property. BZAP also hears conditional uses, signage plans, subdivisions, site plans and development plans, meeting on the first Wednesday for an informal work session and the third Wednesday for formal action. Development plans are due by 5 p.m. on the second Wednesday before the end of the month, and rezonings by 5 p.m. on the third.
- Historic District. In Old Arlington, the area south of Lane Avenue on the National Register since 1985, total or extreme demolition affecting a home’s historic significance faces a six-month delay under Articles 5, 6 and 7 of the UDO, and the city publishes a guide to demolition there. Council adopted the rules in 2009 to discourage, but not prohibit, total demolition, and the department’s demolition documents include an owner statement, a demolition sign affidavit and a certificate of notice form.
- Right-of-way. The Engineering Division approves permits for work in the public right-of-way, and driveway approaches are inspected by the city. Its sidewalk maintenance program inspects about 20% of the city each year and replaces sidewalks that do not meet city code as an assessment project.
- Site design rules. The UDO sets standards for zoning districts, site design, land use and building requirements. The city allows rooftop solar panels on the fronts of homes and businesses, and its code requires DC fast electric vehicle charging for larger parking lots.
Upper Arlington permit costs and fees
The Community Development Department publishes its building, zoning, trade and contractor registration fees on its Fees page. Building permits combine a flat application fee, a planning review fee, a building review fee and a permit fee calculated as a share of construction value. The state Board of Building Standards fee of 1% of permit fees for residential and 3% for commercial still applies to every building permit.
Rather talk it over?
Call 1-855-478-4290 →| Work | Fee |
|---|---|
| Addition | Residential: $75 application, $75 planning, $75 building review, 1.25% of value; commercial: $225 application, $75 planning, hourly building review, 0.5% of value |
| Interior remodel or basement | Residential: $75 + $75 + $75, 1% of value; commercial: $225 + $75 + hourly review, 0.75% of value |
| New building | $225 application, $75 planning; building review $75 residential or hourly commercial; 0.5% of value |
| Detached garage, covered patio, deck, accessory structure 200 sq ft or larger, pool, other | $75 + $75 + $75 residential (hourly review commercial); 1% residential or 0.75% commercial of value |
| Solar panels | $75 application + $75 building review; no planning or permit fee |
| Certificate of zoning compliance / fence permit | $50 / $50 |
| Electrical, gas, HVAC or sewer permit | $100 minimum each |
| Plumbing permit | Per Franklin County Public Health |
| Demolition | $250 residential; $500 commercial |
| Sign permit | $150 |
| Contractor registration | $100 per category (bonds and insurance below) |
As an example from the table, a residential addition with a construction value of $100,000 pays $75 + $75 + $75 + $1,250 (1.25% of value) = $1,475, before the state’s 1% of permit fees and any electrical, HVAC or plumbing permits. A $40,000 basement finish pays $225 in fixed fees plus $400 (1%), or $625, before the state fee.
Trade permits and who may pull them
Under Chapter 747 of the codified ordinances, all general contractors, building trade contractors and subcontractors need an annual contractor’s registration before starting work in the city; packets are mailed to the Community Development Department. Each registration is $100. General contractors post a $5,000 bond and carry liability insurance of $100,000 per person and $300,000 per accident for injuries and $50,000 for property damage, with the city as an additional insured. Bonds run through December 31 of the registration year, and copies of insurance changes or renewals must reach the Building Division at least 20 days before they take effect.
Rather not deal with the building department?
Get a free quote →- Electrical and HVAC: electrical, refrigeration, warm air heating, steam and hot water, and ventilation and air conditioning contractors register with their current state certificate, in the certificate holder’s name. Electrical inspections have their own request line, 614-583-5081.
- Plumbing: master plumbers register with a $5,000 bond and their state certificate; plumbing permit fees follow Franklin County Public Health, which inspects.
- Site trades: driveway and sidewalk contractors and sewer builders post $5,000 bonds; demolition contractors $10,000; house movers $25,000.
- Tents: tent contractors pay the $100 registration fee only.
How to apply for an Upper Arlington building permit
Each contractor files the annual Chapter 747 registration with bond and insurance proof.
File in the OpenGov portal; applications are date-stamped and reviewed in order.
Footprint changes go to the Planning Officer; if the plans do not comply, redesign or apply to BZAP for a variance.
The Chief Building Official (residential) or Commercial Plans Examiner (commercial) checks the plans against Chapter 13 and the state codes.
Apply for electrical, HVAC, gas, plumbing or sewer permits; residential trade permits take 5 to 10 business days.
Request inspections by 3 p.m. for the next business day.
Review, corrections and what causes delay
If plans fail to meet code, the city sends a correction letter citing the code sections. The applicant must resubmit two new sets of plans with every revision highlighted and a letter answering each correction, and resubmittals go back into the first-come, first-served queue. A zoning problem adds more time, because a variance needs BZAP action at a formal third-Wednesday meeting.
Inspections in Upper Arlington
Inspection requests must be in by 3 p.m. for service on the next business day, either online through your permit in the portal or by phone, giving the address, permit number, requested date and a contact. The Steps page lists 614-583-5070 for phone requests, while the Building page and FAQ give the Inspection Line as 614-583-5080; electrical inspections use 614-583-5081. Building, HVAC and driveway approach inspections run Monday through Friday except city holidays, and commercial inspections every business day.
Plumbing inspections are scheduled with Franklin County Public Health at 614-525-3160 or through its Accela portal, with a noon cut-off for next-day visits. Appeals of residential code decisions, and of property maintenance code orders, go to the city’s Board of Building Standards, which meets on call.
Want this handled start to finish?
Get a free quote →Ohio building code in Upper Arlington
Upper Arlington enforces the state commercial, mechanical, plumbing and residential codes through its Building Division, with local building rules in Chapter 13 and zoning in the Unified Development Ordinance, both on Municode. FEMA’s Community Status Book lists the City of Upper Arlington (community 390178) as participating in the National Flood Insurance Program, with its current flood map dated June 17, 2008.
Ohio has statewide building codes: the Ohio Building Code for commercial and other nonresidential buildings and the Residential Code of Ohio for detached one-, two- and three-family dwellings. Only departments certified by the Ohio Board of Building Standards may approve plans and inspect, and residential rules are uniform statewide. How Ohio’s statewide code works
Upper Arlington permit search and official resources
Current permits and inspection results are tracked through the OpenGov portal. For older permits, plans and other records, the City Clerk’s Office handles public records requests through the city’s JustFOIA forms, under the city’s public records policy and retention schedules. BZAP and Board of Building Standards minutes are kept in the city’s online minutes archive, and the GIS map shows zoning, parcels and Historic District properties. Agendas for both boards are posted on the city’s CivicClerk public meeting portal, and meeting audio is kept in its archives portal.
- Upper Arlington Community Development
- Building Division and Board of Building Standards
- Steps for building and plans submission
- Permit and registration fees
- OpenGov applications and permits portal
- Contractor registration requirements
- Planning and zoning, BZAP
- Guide to demolition in the Historic District
- Engineering and right-of-way
- Public records requests
- Franklin County Public Health plumbing
Inspections are where schedules slip.
Get a free quote →Upper Arlington building permit FAQs
How much is a permit for a home addition in Upper Arlington?
$75 each for application, planning review and building review, plus 1.25% of construction value and the state 1% of permit fees.
How long does review take?
Residential building permits take 7 to 10 business days and commercial ones 10 to 15; residential trade permits take 5 to 10.
Do I need a permit for solar panels?
Yes, but only the $75 application fee and $75 building review are charged; there is no planning or permit fee.
Does a fence need a permit?
Yes, a $50 fence permit.
Can I tear down a house in the Historic District?
Total or extreme demolition affecting a home’s historic significance in Old Arlington is subject to a six-month delay so alternatives can be considered.
Who inspects plumbing?
Franklin County Public Health, at 614-525-3160; the city’s plumbing permit fee follows the county’s.
Do contractors register with the city?
Yes, every general and trade contractor and subcontractor, annually, for $100 per registration with the required bond and insurance.
Simplify Upper Arlington permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Ohio. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Upper Arlington sooner?
Let Alliance prepare, file, and track your Upper Arlington permits while your crew stays on the job.
More Ohio permitting guides
Franklin County
Read guide →Worthington
Read guide →Bexley
Read guide →Van Wert Building Permit Guide
Read guide →Van Wert County Building Permit Guide
Read guide →Vandalia Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Upper Arlington permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.