Who reviews a building in Scioto County depends on where it stands. Inside Portsmouth, the city’s Engineering Department is the building department (728 Second Street, 740-354-7557). Outside the city, the county offices that issue permits are the Scioto County Health Department for septic systems and wells (740-355-8358), the County Engineer for driveways, right-of-way work and addresses, and the county’s Floodplain Administrator, whose rules set the flood protection elevation 2 feet above the base flood elevation. For the building department at a rural address, use the Ohio Board of Building Standards look-up map.
What requires a building permit in Scioto County?
A building permit comes from the certified department that holds authority over the address, so the answer differs between Portsmouth, the four villages and the sixteen townships. Portsmouth’s department enforces both state codes inside the city, and its own permit checklist and fee packets set out what needs a permit there and what it costs. Scioto County’s lists of departments and elected offices, like the engineer’s and health department’s pages, name no county building department, so for the townships check the Board of Building Standards look-up map before planning a rural project.
County permits that apply outside cities
- New, replacement or altered septic systems: Health Department permit first
- New or altered wells, ponds, cisterns and hauled-water tanks: Health Department permit
- Driveway culverts and any work in a county road right-of-way: County Engineer
- New 911 addresses (a driveway must already exist): County Engineer
- Development in a special flood hazard area: county Floodplain Administrator
- Lot splits and subdivisions: Scioto County Planning Commission
Where the state code reaches
- Commercial and other nonresidential buildings: a certified department, or the state where none has jurisdiction
- Houses: a certified residential department where one has jurisdiction
- Where no department certified for residential work has jurisdiction, house plans do not have to be submitted
Ohio law says no owner may proceed with constructing, altering or equipping a building until the plans are approved as the law requires; where no certified department has jurisdiction, nonresidential plans go to the state Superintendent of Industrial Compliance. Septic, well, road and flood permits apply whatever the building code answer turns out to be.
What the county decides and what the state holds
The state adopts the building codes and certifies departments. Scioto County’s subdivision regulations date from October 2, 1969 and were revised on October 15, 1999, with new floodplain regulations adopted on May 17, 2011; the county commissioners appoint the Floodplain Administrator. The board of health runs the sewage and private water programs under state rules, and townships decide their own zoning.
Scioto County building department: who handles permitting
Portsmouth’s own pages describe a full building department: its Engineering Department handles zoning, permits, plan review through a consultant building official, inspections and certificates of occupancy (see the Portsmouth building permit guide). The county government’s own department list has no building office. For the rest of the county, the table below shows what the official sources say for each place, with Census Bureau 2025 population estimates.
Short on time to read all of this?
Get a free quote →| Place | Building permits | Addresses and notes |
|---|---|---|
| Portsmouth (city, 17,282) | City Engineering Department (building department), 728 Second Street, Room 25; 740-354-7557 | City assigns its own addresses |
| New Boston (village, 2,206) | The published sources do not say; ask the village office, 3980 Rhodes Avenue, 740-456-4103 | Village assigns its own addresses |
| South Webster (village, 635) | The published sources do not say; ask the village | County 911 addressing program |
| Rarden (village, 138) | The published sources do not say; ask the village | County 911 addressing program |
| Otway (village, 88) | The published sources do not say; ask the village | County 911 addressing program |
| Sixteen townships (Bloom, Brush Creek, Clay, Green, Harrison, Jefferson, Madison, Morgan, Nile, Porter, Rarden, Rush, Union, Valley, Vernon, Washington) | Check the BBS look-up map | Wheelersburg, Rosemount and West Portsmouth use block-system addresses; the Engineer posts zoning resolutions for Clay and Valley townships |
To find the township and parcel, use the county GIS viewer run by the County Engineer; then confirm on the BBS look-up map whether a certified department, and for what kind of building, covers it.
| Detail | Information |
|---|---|
| Health Department | 612 Sixth Street, Suite D, Portsmouth; 740-355-8358; Monday to Friday, 8:30 a.m. to 4:30 p.m. |
| County Engineer (garage) | 56 State Route 728, Lucasville; 740-259-5541; winter Monday to Friday 8:00 to 4:00, summer Monday to Thursday 7:00 to 5:00 |
| County Engineer (courthouse) | 602 Seventh Street, Room 401, Portsmouth; 740-355-8265; Monday to Friday 8:00 to 4:30 |
| County Commissioners | 602 Seventh Street, Room 310, Portsmouth; 740-355-8202 |
| County Auditor (parcel records) | 602 Seventh Street, Room 103; 740-355-8232 |
| Soil and Water Conservation District | 12167A State Route 104, Lucasville; 740-259-9231 ext. 4 |
| Sanitary Engineer | Monday to Friday, 8:00 a.m. to 4:30 p.m.; after-hours emergencies 740-355-8249 |
Scioto County permit types
Outside Portsmouth, the county site permits below apply whichever building department, if any, covers the address.
Not sure this scope needs a permit?
Get a free quote →Residential permits
- Septic permit. Installing a new septic system, replacing an old one or altering an existing one needs a Health Department permit before the work. The system type depends on the lot’s soils, and the department warns that not every lot can take an on-lot system: floodplain or floodway, saturated soils, steep slopes and swales can make a design very difficult or impossible. Systems installed after 2015 are enrolled in the operation and maintenance program automatically, and the department inspects household systems each year. The Board of Health enforces the state sewage rules for one-, two- and three-family homes.
- Well and private water permit. Installing or altering a well, pond, cistern or hauled-water tank used for drinking water needs a Health Department permit, obtained by the owner or installer, and a water test is part of the permit process.
- Address. A new 911 address comes from the County Engineer once a driveway exists, except in New Boston and Portsmouth.
- House plans. Where a certified residential department covers the address, it reviews and permits the house; where none does, state law does not require house plans to be submitted.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
Commercial and other nonresidential buildings need plan approval from the certified department with jurisdiction, or from the state’s Superintendent of Industrial Compliance where no certified department has it. The county site permits (septic or sewer, water, road access and floodplain) apply to commercial sites as well, and a utility working in a county road needs a utility right-of-way permit with a set of plans.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Lot creation. New lots and subdivisions go through the Scioto County Planning Commission under the county subdivision regulations, and the Health Department reviews subdivisions and new lots for sewage suitability.
- Soil evaluation. The Health Department takes soil evaluation and site review applications for a new septic system.
- Floodplain. Development in a special flood hazard area needs a permit from the Floodplain Administrator, a staff member of the county Economic Development Office appointed by the commissioners. The flood protection elevation is the base flood elevation plus 2 feet of freeboard.
- Road access. A driveway culvert on a county road needs the Engineer’s culvert application, and any other work in the right-of-way needs a private right-of-way permit with a sketch; the height and depth requirements on the permit must be met. On a state route the county directs road questions to the ODOT garage in Lucasville (740-774-8995).
- Zoning. The Engineer posts zoning resolutions for Clay and Valley townships; ask the trustees of other townships whether township zoning applies.
Scioto County permit costs and fees
No county building permit fee schedule appears on the county offices’ pages; building fees are set by whichever certified department reviews the work, such as Portsmouth’s Engineering Department inside the city. The county charges that are published belong to other programs.
Rather talk it over?
Call 1-855-478-4290 →| Item | Where the fee is set |
|---|---|
| Septic permits, soil evaluations, site reviews | Health Department 2026 sewage program fees |
| Well and private water permits | Health Department 2026 environmental program fees |
| Subdivision filing and inspection | The subdivision regulations list no fees |
| Building permits | The certified department’s own schedule, plus the state assessment |
| Board of Building Standards assessment | 3% of nonresidential fees; 1% of residential fees |
The Health Department posts its 2026 sewage and environmental fee schedules on its site; ask the department at 740-355-8358 for the current amount on a permit. In Portsmouth, a new house or addition costs $180 plus $0.09 a square foot for the building permit under its 2022 residential fee sheet.
Help with a failing septic system
Through Ohio EPA funding, the Health Department’s repair and replacement program can pay up to 100% of the cost of fixing or replacing a failed system, abandoning an old tank or connecting to an available sanitary sewer. Household income must be below 300% of the federal poverty guidelines, and the program’s table sets the owner’s share at nothing at the poverty level, 15% at 200% of it and 50% at 300%. The owner must own and live in the home (or be buying it on a land installment contract), the department must have documented the system as failed, and rentals, new builds, foreclosures and homes for sale are excluded. The department warns that the program has several steps and may take months.
Trade permits and who may pull them
Trade permits follow the building department that covers the address: inside Portsmouth, the city issues the residential, commercial, electrical, plumbing and HVAC permits and requires every contractor to register with its Engineering Department. Outside the city, the county pages describe no county trade permit or county contractor registration.
- Septic installers and service providers: state law requires installers, service providers and septage haulers to register with each health district where they work, with a separate registration for each kind of work, before starting; the Health Department posts its 2025 lists of registered contractors. A homeowner who services his own system to meet a service-contract requirement counts as a service provider.
- Well contractors: private water system work is done under a Health Department permit obtained by the owner or the installer.
- Commercial trades: electrical, HVAC, hydronics, plumbing and refrigeration contractors on commercial projects need the state OCILB license.
- General contractors: Ohio has no state license for them, and the county pages show no local registration outside Portsmouth.
Rather not deal with the Scioto County building department?
Get a free quote →How to apply for permits in Scioto County
Find its township, village or city on the county GIS viewer.
Check the BBS look-up map; inside Portsmouth, go to the city’s Engineering Department.
In a special flood hazard area, apply to the Floodplain Administrator before any development.
Get a soil evaluation and septic permit, and a well permit if there is no public water.
File the Engineer’s driveway culvert or right-of-way permit, then request the address.
Submit to the certified department or the state for commercial work, and to a certified residential department where one covers the house.
Review, corrections and what causes delay
Soil conditions are the usual limit on rural lots: the Health Department says some lots cannot be served by an on-lot system at all, so settle the septic question before buying or designing. Where a system cannot meet the sewage rules, the owner may ask the Board of Health for a variance on its application form with the variance fee; the board meets on the second Friday of each month, the request must arrive at least two weeks before, and an approved variance lasts two years. Engineer forms can be mailed to the Lucasville garage or faxed, and special hauling permits need 24 hours’ notice and a certificate of insurance. Where a certified department approves plans, the state codes void the approval if work has not started within 12 months.
Inspections and certificates in Scioto County
Each permitting office inspects its own work: the Health Department inspects septic installations and private water systems, work in a county road right-of-way must meet the height and depth requirements on the County Engineer’s permit, and the certified building department inspects the building. In Portsmouth, inspections are booked with the Engineering Department the business day before.
Where a certified department has jurisdiction, no building may be occupied until it issues a certificate of occupancy or completion.
Ohio building code in Scioto County
The state codes apply through whichever certified department has jurisdiction; Portsmouth’s department enforces both. FEMA’s Community Status Book lists unincorporated Scioto County (community 390496) as participating in the National Flood Insurance Program, with its current flood map dated June 19, 2020; Portsmouth participates separately.
Ohio has statewide building codes: the Ohio Building Code for commercial and other nonresidential buildings and the Residential Code of Ohio for detached one-, two- and three-family dwellings. Only departments certified by the Ohio Board of Building Standards may approve plans and inspect, and residential rules are uniform statewide. How Ohio’s statewide code works
Want this handled start to finish?
Get a free quote →Scioto County permit search and official resources
Ask each office for its own records: the Health Department for septic and well permits and inspections, the County Engineer for road permits, addresses and survey records, and Portsmouth’s Engineering Department for building permits in the city. When a home is bought, sold or refinanced, the Health Department can evaluate its existing private water system on request and certify its septic system through a sewage loan inspection application.
- Scioto County departments list
- Scioto County elected offices
- County Engineer permits and forms
- County Engineer services and addressing
- County Engineer contacts and hours
- Township zoning resolutions (Clay, Valley)
- Subdivision and floodplain regulations
- Township trustees and contacts
- Health Department sewage program and fees
- Health Department guidance for homeowners (septic)
- Sewage variance procedures
- Failing septic system repair and replacement program
- Sewage contractor registration
- Health Department private water systems
- Scioto Soil and Water Conservation District
- Scioto County Sanitary Engineer
- Portsmouth Building Department
- BBS building-department look-up map
- Ohio Construction Industry Licensing Board
Inspections are where schedules slip.
Get a free quote →Scioto County building permit FAQs
Who issues building permits in Portsmouth?
The city’s Engineering Department, 728 Second Street, Room 25 (740-354-7557), which acts as Portsmouth’s building department.
Who issues building permits in the townships?
The county’s own department and elected-office lists name no county building department; check the BBS look-up map for the address to see which certified department, if any, covers it.
Do I need a permit for a septic system?
Yes. A new, replacement or altered system needs a Scioto County Health Department permit before work starts.
Is there help paying for a failing septic system?
Yes, for owner-occupied homes whose household income is below 300% of the federal poverty guidelines: the Health Department’s Ohio EPA-funded program pays between 50% and 100% of an approved repair or replacement.
Do I need a permit for a new well?
Yes, from the Health Department, obtained by the owner or the installer before the well is drilled or altered.
What flood protection elevation does the county use?
The county’s floodplain rules set the flood protection elevation at the base flood elevation plus 2 feet; the Floodplain Administrator issues the permit.
How do I get an address for a new house?
Request it from the County Engineer once the driveway is in; New Boston and Portsmouth assign their own addresses.
Do I need a permit for a driveway on a county road?
Yes. The County Engineer issues driveway culvert applications and right-of-way permits for work along county roads.
Simplify Scioto County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Ohio. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Scioto County sooner?
Let Alliance prepare, file, and track your Scioto County permits while your crew stays on the job.
More Ohio permitting guides
Portsmouth
Read guide →Pike County
Read guide →Lawrence County
Read guide →Seneca County Building Permit Guide
Read guide →Seven Hills Building Permit Guide
Read guide →Shaker Heights Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Scioto County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.