Paulding County’s official site lists no county building department, and the largest village, Paulding, says it has a zoning ordinance but no building code, so a house there needs a village building permit approved by the zoning inspector rather than a code review. Nine of the county’s twelve townships have zoning inspectors; Auglaize, Brown and Jackson are not zoned, and the county sends questions about them to the Auditor’s office. For business buildings, the Village of Antwerp’s zoning permit states that state building permits are required, which in Ohio means plan approval from the Division of Industrial Compliance where no certified department has authority.
What requires a permit in Paulding County?
The answer depends on where the land is and what you are building. Paulding County’s offices, as its website lists them, cover the auditor, engineer, health department, emergency management and soil and water conservation, but no building department, so a county building permit is not one of the steps here.
Permits that do apply
- A township zoning permit in the nine zoned townships: Benton, Blue Creek, Carryall, Crane, Emerald, Harrison, Latty, Paulding and Washington
- Village permits: in the Village of Paulding every structure, fences included, needs a building permit approved by the zoning inspector
- In Antwerp, a zoning permit for a new home, addition, business, sign, fence, pool, accessory building, change of use or added dwelling units
- State building plan approval for business and other nonresidential buildings
- A health department permit to install, repair or abandon a household, small-flow or gray water sewage system
- A floodplain development permit from the County Engineer for building, filling, grading or remodeling in a mapped flood area
- A County Engineer permit for a new driveway, ditch tile or any private work in a county road right-of-way
Where there is no local permit
- Zoning in Auglaize, Brown and Jackson townships, which are not currently zoned
- Building-code review of houses by the Village of Paulding, which has no building code
- A county-issued building permit, since the county lists no building department
Under Ohio law, where no department certified for residential buildings has jurisdiction, the owner is not required to submit plans for a house; nonresidential plans then go to the state. The Board of Building Standards’ building-department look-up shows on a map whether any certified department holds authority at a given address.
What Paulding County decides and what the state holds
The building codes are Ohio’s and only certified departments enforce them. Locally, each township decides whether to zone, the villages of Paulding and Antwerp keep their own zoning ordinances (Paulding posts a 2016 ordinance; Antwerp’s zoning book is dated November 21, 2022), and the Village of Paulding has adopted the International Property Maintenance Code for existing buildings. The Board of Commissioners adopted the county’s Special Purpose Flood Damage Reduction Resolution under Ohio Revised Code 307.37 and 307.85, using flood maps effective October 13, 2022, and named the County Engineer or a designee as Floodplain Administrator; the board of health runs the sewage and private water rules.
Short on time to read all of this?
Get a free quote →Paulding County building department: who handles permitting
Paulding County has eleven villages (Antwerp, Broughton, Cecil, Grover Hill, Haviland, Latty, Melrose, Oakwood, Paulding, Payne and part of Scott) and no cities. Paulding and Antwerp run their own zoning and permits; for the smaller villages, ask the village office. The county’s township page lists the trustees, fiscal officer and zoning inspector for every township.
| Office | What to ask it | Contact |
|---|---|---|
| Township zoning inspector (nine zoned townships) | Zoning permits, setbacks, uses | Listed by township on the county’s FAQ page |
| Paulding County Auditor | Questions for the unzoned Auglaize, Brown and Jackson townships; property records | 115 North Williams Street, Suite 101, Paulding; 419-399-8205; Monday to Friday 8:00 a.m. to 4:30 p.m. |
| Village of Paulding | Village building permit approved by the zoning inspector | 116 South Main Street; 419-399-4011 |
| Village of Antwerp | Zoning permits; Planning & Zoning Commission | Village Administrator, 118 North Main Street; 419-258-2371 |
| Paulding County Health Department | Permits to install, repair or abandon septic systems; private water systems and water sampling | 101 West Perry Street, Paulding; 419-399-3921 |
| Paulding County Engineer (also Floodplain Administrator) | Driveway, ditch-tile and county road permits; floodplain development permits | Operations facility, 801 West Wayne Street, Paulding; 419-399-2433; Monday to Friday 7:00 a.m. to 3:30 p.m. (Monday to Thursday 6:00 a.m. to 4:00 p.m. from Memorial Day to Labor Day) |
| Board of County Commissioners | County resolutions | 451 McDonald Pike, Suite E, Paulding; 419-399-8215 |
| State of Ohio, Division of Industrial Compliance | Plan approval for business buildings | 614-644-2223 |
Paulding County Emergency Management can be reached at 419-399-3500, and the Paulding Soil and Water Conservation District runs conservation programs for landowners.
Paulding County permit types
Not sure this scope needs a permit?
Get a free quote →Residential permits
In the Village of Paulding, the building permit is a zoning permit: the applicant supplies a drawing showing where the structure or fence will sit against the property lines and any easements or rights-of-way, and the zoning inspector approves it. The village warns that if locations or measurements are misrepresented and the structure breaks the zoning code, it will issue an order of removal. Its accessory building rules in residential districts: none in the front yard or in front of a house, at least 5 feet from rear and side lot lines, at least 10 feet from a house on the next lot, and on a corner lot no closer to the street than the neighbor’s front setback, all measured from the actual lot lines rather than streets or sidewalks.
In Antwerp, a home, addition, pool, fence or accessory building needs a village zoning permit, with two copies of scaled plans showing the lot’s dimensions and shape, existing buildings and the proposed work; without a drawing the application is rejected. The form also asks for the zoning district (A-1 agricultural, R-1 and R-1-A single family, R-2 multiple family, B-1 downtown business, B-2 gateway business, I-1 industrial or I-2 industrial grain), building height, parking spaces, dwelling units, lot width, depth and area, the square footage or fence length, the estimated value and the expected completion date. In a zoned township, the township’s zoning inspector issues the permit.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
Antwerp’s zoning permit reminds applicants that state building permits are required for business projects, and a business project that creates more than four off-street parking spaces also needs site plan review by the village Planning & Zoning Commission. Business properties in Antwerp’s B-1 downtown and B-2 gateway districts must have sidewalks in good condition, or install them before the project is finished. Signs need the commission’s approval.
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning. Township or village zoning first; in the three unzoned townships, start with the Auditor’s office.
- Flood zone. Antwerp’s application asks for the FEMA flood zone (Zone C, Zone A or other); FEMA lists unincorporated Paulding County (community 390777) as participating, with maps dated October 13, 2022.
- Septic and well. Most properties in the county have no sanitary sewer, the health department notes, so most homes rely on septic systems; it issues the permits to install, repair or abandon them, and a new private well needs a board of health permit under state rules.
- Floodplain. Any filling, grading, construction, alteration, remodeling or expansion wholly or partly in a mapped flood area needs a floodplain development permit from the County Engineer before work starts, applied for by the owner or an agent.
- Driveways. A new driveway, ditch enclosure or replacement drive pipe on a county road needs the Engineer’s Application to Tile Open Ditch/Driveway Permit, filed at least two weeks ahead; township roads go to the township trustees, and state or federal highways need a state permit.
- Trees in the Village of Paulding. Removing a tree needs the village’s tree permit, with a diagram of the tree’s position against the street, sidewalk and property, a note on whether it will be replaced, and approval by the Street Superintendent and Village Administrator.
Rather talk it over?
Call 1-855-478-4290 →Paulding County permit costs and fees
With no county building department, there is no county building permit fee and no local Board of Building Standards assessment on house permits. The fees people pay are village and township zoning fees, health department fees and, for business buildings, the state’s plan approval fees, which carry the Board’s 3% assessment on nonresidential work.
| Permit | Fee |
|---|---|
| Antwerp zoning permit (homes, additions, businesses, accessory buildings, pools) | $50 or 10 cents per square foot, whichever is greater |
| Antwerp fence permit | $40 or 10 cents per linear foot, whichever is greater |
| Village of Paulding building permit | Not printed on the posted application; ask the village office |
| Township zoning permits | Set by each township; ask its zoning inspector |
| County Engineer right-of-way and driveway permits | Free of charge; work across a county road also carries sign rental and set-up fees |
Worked example from Antwerp’s application: an 800 square foot detached garage at 10 cents per square foot is $80, which is more than the $50 minimum, so the fee is $80; a 300-foot fence at 10 cents per foot is $30, below the $40 minimum, so it costs $40. Antwerp takes applications and fees in person at the Town Hall, through the Village Administrator’s mailbox, or by mail.
Trade permits and who may pull them
None of the county’s or villages’ pages describe local electrical, HVAC or plumbing permits for houses, and the Village of Paulding states that it has no building code. On business projects, the trades are reviewed with the state plan approval, and contractors for commercial electrical, HVAC, hydronics, plumbing and refrigeration work need OCILB licenses. Ohio has no state license for general contractors, and the county’s pages show no county contractor registration.
Rather not deal with the Paulding County building department?
Get a free quote →- Septic and wells: the Paulding County Health Department issues sewage system permits and regulates private water systems (wells, ponds, springs, cisterns and hauled-water tanks) under state rules, and samples well water for a fee.
- Road work: utilities, ditch work, shoulder work and tree planting along a county road need the Engineer’s permit to work along county roads, and cuts across a road need a separate permit to work across county roads.
How to get permits in Paulding County
Find the township or village; the Auditor’s office in the courthouse handles questions on the unzoned townships.
Antwerp and Paulding post their zoning ordinances and maps; township rules come from the zoning inspector.
Show lot lines, existing buildings and the new work with measurements from the actual lot lines.
Village office, Village Administrator or township inspector, with the fee.
Health department approvals on lots without public sewer or water.
Nonresidential projects file for state plan approval before construction.
Review, corrections and what causes delay
The common problems are a missing or unscaled drawing, which gets an Antwerp application rejected, and wrong measurements, which in the Village of Paulding can lead to an order of removal. In Antwerp, signs need the Planning & Zoning Commission’s approval and projects adding more than four parking spaces need its site plan review. An Antwerp zoning permit is void if work has not started within a year or finished within two and a half years, and it must be posted before construction or site work starts.
Inspections and certificates in Paulding County
The county pages describe no building inspections for houses, and the Village of Paulding’s approval is a zoning approval of location. The County Engineer’s staff oversee and inspect every right-of-way permit project before, during and after the work, and give a written or verbal release when it is done. Business buildings approved by the state are inspected by the state, and in Ohio no building may be used or occupied until a certificate of occupancy or completion is issued. In the Village of Paulding, the adopted property maintenance code governs the upkeep of existing buildings.
Ohio building code in Paulding County
For business and other nonresidential buildings, Ohio’s building code is applied through state plan approval, as Antwerp’s application notes. Villages and townships regulate location and use through zoning.
Want this handled start to finish?
Get a free quote →Ohio has statewide building codes: the Ohio Building Code for commercial and other nonresidential buildings and the Residential Code of Ohio for detached one-, two- and three-family dwellings. Only departments certified by the Ohio Board of Building Standards may approve plans and inspect, and residential rules are uniform statewide. How Ohio’s statewide code works
Paulding County permit search and official resources
There is no county permit search. Ask the village office or township zoning inspector for zoning permit records, the Auditor for property records, and the state for plan approvals on business buildings. The Floodplain Administrator keeps floodplain permits, elevation certificates and variance records open to public inspection, with the flood maps on file at the Engineer’s operations facility and courthouse office.
- Township trustees and zoning inspectors (Paulding County)
- Paulding County officials and offices
- Paulding County services (health department, EMA, soil and water)
- Paulding County villages
- Village of Paulding zoning
- Village of Paulding building permit application
- Village of Antwerp building and zoning
- Antwerp application for zoning permit
- Paulding County Engineer applications and permits
- Special Purpose Flood Damage Reduction Resolution
- Health Department sewage treatment systems
- Health Department private water systems
- Ohio Board of Building Standards building-department look-up
Inspections are where schedules slip.
Get a free quote →Paulding County permit FAQs
Does Paulding County have a building department?
None is listed among the county’s offices; permits here come from townships, villages, the health department and, for business buildings, the state.
Do I need a permit for a fence in the Village of Paulding?
Yes. The village requires a building permit, approved by its zoning inspector, for all structures including fences.
Which townships are not zoned?
Auglaize, Brown and Jackson; the county sends questions about them to the Auditor’s office.
How much is a zoning permit in Antwerp?
$50 or 10 cents per square foot, whichever is greater; fences are $40 or 10 cents per linear foot.
Who approves a new business building?
The state: Antwerp’s application states that state building permits are required for business projects, and village or township zoning still applies.
Who issues floodplain permits?
The Paulding County Engineer, who serves as Floodplain Administrator under the county’s flood damage reduction resolution, for development in mapped flood areas of the county’s jurisdiction.
How close can a shed be to my lot line in the Village of Paulding?
At least 5 feet from rear and side lot lines, never in the front yard, and at least 10 feet from a neighbor’s house.
Simplify Paulding County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Ohio. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Paulding County sooner?
Let Alliance prepare, file, and track your Paulding County permits while your crew stays on the job.
More Ohio permitting guides
Defiance County
Read guide →Van Wert County
Read guide →Putnam County
Read guide →Perry County Building Permit Guide
Read guide →Pickaway County Building Permit Guide
Read guide →Pickerington Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Paulding County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.