Skip to main content
Municipal GuideOhioFranklin County · New Albany

New Albany, Ohio Building Permit Guide

To get a building permit in New Albany, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

New Albany’s Community Development Department at 7815 Walton Parkway reviews, permits and inspects building work in both the Franklin and Licking county parts of the city, now through its Accela online portal.

Authority: New Albany Community Development DepartmentFiling: Accela Citizen AccessPhone: 614-939-2254
Authority
Community Development7815 Walton Parkway
New house
$75 + $0.10/sq ftPlus review, occupancy, 1%
Contractors
$50 a yearPer registration type
Inspection line
614-939-2222Voicemail by 4 p.m.

Building permits in New Albany come from the city’s Community Development Department, 7815 Walton Parkway (614-939-2254, development@newalbanyohio.org), where planning and zoning, engineering and building code staff review each plan together. The city’s permitting page announces a move from paper documents to the Accela Citizen Access portal beginning November 2, for planning, engineering and building applications, fees and inspection requests. A new house is charged a $75 structure base fee plus $0.10 per square foot, with plan review, occupancy, zoning and park charges on top; plumbing plans go to Franklin County Public Health first.

What requires a building permit in New Albany?

New Albany’s permit FAQ answers the common question directly: a roof, a deck, a fence or a patio each needs both a plan review and a permit. The department’s residential fee schedule shows how wide the net is, with separate charges for new houses, additions and accessory structures, alterations and restorations, and a list of small projects and individual permits.

Building permit

  • New houses, additions and accessory structures
  • Alterations and restorations, including exterior window, door and siding work
  • Decks, fireplaces, arbors and gazebos
  • Walls over 4 feet, measured from the bottom of the footing
  • Replacement shingles, siding and windows

Zoning or trade permit

  • Patios, landscaping, fences, sidewalks and driveways (zoning, $30)
  • Swimming pools (zoning, $30)
  • Electrical, heating, cooling, duct work and gas piping
  • Plumbing, water heaters and lawn sprinkler backflow preventers
  • Generators (electrical permit plus generator zoning)

Demolition carries a state step as well: the city’s permitting page reminds applicants that Ohio EPA’s Notification of Demolition and Renovation form is required for every demolition of a facility, whether or not asbestos is present, and for renovations above set amounts of regulated asbestos material.

What New Albany decides and what the state holds

The city reviews and inspects residential and commercial construction itself, using the state’s residential, commercial, plumbing, mechanical and electrical codes, which its FAQ lists by edition. New Albany sets its own fees, registers contractors, runs zoning through its codified ordinances, Design Guidelines and Requirements and the form-based Urban Center Code, and charges park and leisure trail fees on new houses. The state receives 1% of residential and 3% of commercial building fees through the city’s schedules and licenses commercial trade contractors, and Franklin County Public Health reviews and inspects plumbing.

Short on time to read all of this?

Get a free quote →

New Albany building department: who handles permitting

New Albany lies mostly in Franklin County, with a small part in Licking County: the Census Bureau’s 2025 estimates put about 11,400 residents on the Franklin side and about 400 on the Licking side. The Community Development Department permits both parts, so the Licking County Building Code Department does not handle New Albany addresses. Franklin County Public Health schedules plumbing inspections for every New Albany address, in either county.

New Albany permit contacts
DetailInformation
OfficeCommunity Development Department, 7815 Walton Parkway, New Albany, OH 43054
Mailing address99 West Main Street, P.O. Box 188, New Albany, OH 43054
Phone / email614-939-2254; development@newalbanyohio.org
Inspection line614-939-2222 (voicemail)
Online portalAccela Citizen Access, with ePermitHub for plans
PlumbingPlan review and inspections by Franklin County Public Health, 614-525-3160; permit issued by the city

New Albany permit types

Accela Citizen Access is the one portal for planning, engineering and building applications. Plans and supporting documents are uploaded through ePermitHub inside Accela, where applicants see reviewers’ markups in real time and respond to comments. The city publishes how-to guides for creating an account and for planning, engineering and commercial applications. Projects already submitted on paper can be moved to the electronic system by calling 614-939-2254.

Residential permits

  • New houses use the residential application, which asks for a project valuation, the fire department and county, and square footage measured from outside wall to outside wall for the basement, each floor, the garage and the deck. Each trade item needs a subcontractor form.
  • Additions and accessory structures pay the same structure rates as a new house, with a $30 zoning fee and a $50 certificate of appropriateness.
  • Alterations and restorations carry a lower $25 plan review fee, with the certificate of appropriateness added when exterior windows, doors or siding change.
  • Small projects such as decks, fireplaces, gazebos and tall walls have their own flat fees.

Commercial permits

Commercial buildings are reviewed by planning, engineering and building staff together, checked against approved site plans and conditions of approval. For new construction the department offers phased plan review, so building can start on part of a project while the rest is designed; the phases must be agreed in writing with the chief building official and the commercial plan reviewer before submittal. Engineering submittals are electronic; email development@newalbanyohio.org for the link and requirements.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Zoning permit. Residential and commercial zoning permit packets are on the zoning page; every parcel, including parkland, has a zoning district on the official map.
  • Design standards. The Design Guidelines and Requirements apply citywide, organized by area and use, and the Village Center follows the form-based Urban Center Code. Exterior work pays a certificate of appropriateness fee: $50 for a house and $250 for a new commercial building.
  • Small project meetings. The zoning officer and a building inspector review residential small projects and exterior changes on Tuesday mornings and commercial projects on Thursday mornings; call to see if a project qualifies.
  • Plumbing plan review. Residential plumbing permits now require Franklin County Public Health’s plan review approval notice before the city issues the permit.
  • Water and sewer. Tap and capacity charges for New Albany water, New Albany sewer and Columbus sewer appear on the department’s new-house fee schedule, by tap size.

New Albany permit costs and fees

The Community Development Residential and Commercial Fees Schedules are linked from the city’s Accela page; neither prints an ordinance number or date. Each part of the schedule adds the state fee as a percentage of the fees above it: 1% on residential and 3% on commercial. All fees must be paid in full before final approval and permit issuance, online, by phone or by check; the department takes Visa, MasterCard and Discover.

New Albany building fees (Community Development fee schedules)
WorkFee
New house: structure$75 base + $0.10 per sq ft; plan review $50; occupancy $50; + 1%
New house: zoning / certificate of appropriateness / park / leisure trail$30 / $50 / $150 / $350
Residential electrical$50 base + $0.03 per sq ft + $50 per panel, + 1%
Residential heating / cooling / duct work only$50 per unit / $50 per unit / $40
Gas piping$50 + $15 per valve stop
Plumbing$60 including the first fixture + $15 per fixture; water heater replacement $60
Addition or accessory structure$75 + $0.10 per sq ft; plan review $50; zoning $30; certificate of appropriateness $50
Alteration or restoration$75 + $0.10 per sq ft; plan review $25
Deck / fireplace / arbor or gazebo / wall over 4 ft$50 + $0.10 per sq ft / $75 / $50 / $50; zoning $80
Replacement shingles, siding, windows$50
Fence, patio, driveway, sidewalk, landscaping or pool zoning$30
Water tap and New Albany capacity, 3/4 inch$175 + $1,049.40
Sewer, 3/4 inch: tap / New Albany capacity / Columbus capacity$130 / $1,522 / $3,044 (+ $85 base)
New commercial building$250 base + $0.05 per sq ft; occupancy $75; + 3%; certificate of appropriateness $250
Commercial electrical / mechanical$100 + $0.03 per sq ft each, maximum $4,000
Commercial plumbing$200 including the first fixture + $20 per fixture

Rather talk it over?

Call 1-855-478-4290 →

A worked example from the residential schedule: a 3,000-square-foot new house pays $75 + $300 + $50 plan review + $50 occupancy = $475, plus 1% ($4.75), for $479.75. The $30 zoning fee, $50 certificate of appropriateness, $150 park fee and $350 leisure trail fee follow the state line on the schedule, bringing the building and zoning charges to $1,059.75 before electrical, mechanical, gas, plumbing, water and sewer fees. A 1-inch connection costs more: $350 plus $1,748.40 for water, and $260, $2,537 and $5,074 for the sewer tap, New Albany capacity and Columbus capacity, with sewer inspection at $2.80 per foot beyond the first 100 feet.

Trade permits and who may pull them

New Albany requires registration before any work in the city from general contractors, remodelers, framers, concrete and masonry contractors, water and sewer contractors, electricians, HVAC contractors, plumbers, fire suppression and fire alarm contractors, and every other state-licensed trade. Registration costs $50 for each registration type, runs for the calendar year from January through December, and needs a copy of the contractor’s liability insurance and its current state license or qualification certificate where one applies.

  • Electrical: permits are issued by the city and priced by area and panel; temporary service and generators are $50 each.
  • Heating, cooling and gas: $50 per heating or cooling unit, $40 for duct work alone, and $50 plus $15 per valve stop for gas piping.
  • Plumbing: plans go to Franklin County Public Health for approval first; the city then issues the permit and the county health department inspects. Lawn sprinkler systems need a plumbing permit for the backflow preventer.
  • Fire protection: residential fire protection is $50 plus $0.03 per square foot, and inspections that involve the fire department must be booked two business days ahead.

Rather not deal with the building department?

Get a free quote →

How to apply for a New Albany building permit

1. Check zoning and design rules

Look up the parcel on the zoning map and read the Design Guidelines section that applies to the area and use.

2. Register contractors

Every contractor on the job registers for the calendar year, at $50 per type.

3. Clear plumbing review

Get Franklin County Public Health’s plumbing plan approval before applying for the plumbing permit.

4. Apply in Accela

Create an account, choose the planning, engineering or building application and upload plans through ePermitHub.

5. Answer comments

Planning, engineering and building reviewers post markups; respond in the portal.

6. Pay and receive the permit

The development clerks contact you by phone or email when review is done; pay before issuance.

Review, corrections and what causes delay

Because each plan is checked against approved site plans, conditions of approval and the submittal checklists at the same time, a missing zoning or engineering item holds up the building permit. Incomplete applications are not accepted for review. Small residential and exterior projects that meet the criteria can be reviewed in one of the weekly plan review meetings with the zoning officer and a building inspector. The city’s FAQ, written before the Accela change, still describes paper copies and flash drives; follow the portal instructions for new filings.

Inspections in New Albany

Structural, HVAC and electrical inspections are requested by voicemail at 614-939-2222 by 4:00 p.m. on the business day before, and Accela also lets permit holders schedule inspections. Sewer tap inspections use the same line and deadline. A commercial zoning inspection is scheduled within 48 hours of a call to that number. Any inspection that needs both the building inspector and the fire department must be requested two business days ahead through the project’s lead inspector.

Inspections are assigned each morning, with footings and commercial life-safety inspections taking priority and other requests fitted in as time allows. The city asks that work be ready before you call. Plumbing inspections are scheduled with Franklin County Public Health through its Accela portal, with a noon cut-off for next-day visits. Occupancy is charged at $50 for a house and $75 for a commercial building.

Want this handled start to finish?

Get a free quote →

Ohio building code in New Albany

New Albany enforces the state residential, commercial, plumbing, mechanical and electrical codes through its own department, and its zoning code, property maintenance code and other ordinances are on Municode; the zoning officer investigates property maintenance complaints. FEMA’s Community Status Book lists the City of New Albany (community 390895) as participating in the National Flood Insurance Program, with its current flood map dated June 17, 2008.

Ohio has statewide building codes: the Ohio Building Code for commercial and other nonresidential buildings and the Residential Code of Ohio for detached one-, two- and three-family dwellings. Only departments certified by the Ohio Board of Building Standards may approve plans and inspect, and residential rules are uniform statewide. How Ohio’s statewide code works

New Albany permit search and official resources

Applicants track their projects in Accela Citizen Access. For older permit files and plans, New Albany takes public records requests by phone, email or in person, with an optional request form; questions go to the Records Custodian and Council Clerk at clerksofcouncil@newalbanyohio.org or 614-245-7204. Paper copies are $0.05 a page and emailed electronic copies are free.

Inspections are where schedules slip.

Get a free quote →

New Albany building permit FAQs

Do I need a permit for a fence or patio in New Albany?

Yes. The city says a roof, deck, fence or patio each needs a plan review and permit; fence and patio zoning is $30.

How much is a permit for a new house?

The structure fee is $75 plus $0.10 per square foot, with $50 plan review, $50 occupancy and 1% for the state, plus zoning, park, trail and trade fees.

Does the city issue permits in the Licking County part of New Albany?

Yes. The Community Development Department permits both the Franklin and Licking county parts of the city.

Who handles plumbing?

Franklin County Public Health approves plumbing plans and inspects; New Albany issues the plumbing permit.

Which contractors must register?

General contractors, remodelers, framers, concrete, masonry, water and sewer contractors and all state-licensed trades, for $50 a year per type.

How do I book an inspection?

Leave a voicemail at 614-939-2222 by 4:00 p.m. the business day before, or schedule in Accela.

Can I still file on paper?

The city’s permitting page announces Accela in place of paper documents from November 2; call 614-939-2254 to move a project already submitted.

Simplify New Albany permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Ohio. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in New Albany sooner?

Let Alliance prepare, file, and track your New Albany permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about New Albany permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.