Inside the City of Lima, the Lima/Allen County Building Department (Public Works, 50 Town Square, (419) 221-5243) handles plan review, permits and inspections for one-, two- and three-family homes and for commercial buildings. Zoning clearance from the city’s Planning Division comes first, applications and inspection requests run through the SmartGov portal, and plumbing is permitted separately by Allen County Public Health. The department’s pool policy prices an above-ground pool permit at $50.50.
What requires a building permit in Lima?
The department’s Residential Permit and Inspection Guidelines spell out which home projects need a building, electrical or mechanical permit. The lists cover new work, replacements, additions and alterations.
Building permit
- New houses, including modular and pre-manufactured homes, and all additions
- Attached and detached garages, pole barns and carports
- Storage buildings, gazebos and picnic shelters over 200 square feet; patio covers and enclosures
- New roof structures, new roof coverings, and roof repairs covering more than 25% of the roof
- New siding, structural repairs and interior drywall replacement
- Replacement foundations and basement wall reinforcement
- Attached decks or porches over 200 square feet or more than 30 inches above grade that serve as an exit
- Stairs with four or more risers, fences over 6 feet, fuel-burning stoves, fireplaces and chimneys
Electrical or mechanical permit
- New, temporary or reconnected electric services
- New circuits, circuit extensions and wire replacement
- Spas, hot tubs, saunas and permanently installed pools
- Generators
- Furnaces, boilers and central air conditioning
- New or altered ductwork
Not on the list: one-story detached sheds, playhouses and similar buildings under 200 square feet, and a same-for-same furnace or air conditioner swap when no ducts are added or changed. Reinstalling a pool of the same kind in the same spot needs no permit under the pool policy.
Alliance handles electrical permits for contractors here. More on this: who pulls the electrical permit.
What Lima decides and what the state holds
The state adopts the residential and nonresidential codes and certifies the department, which enforces both inside the city limits. Lima sets its own zoning code, fence and pool rules, contractor registration, design review for the downtown district, flood hazard permits and rental registration. Under the fence ordinance (Section 1262.02), front-yard fences may not exceed 3 feet 6 inches, side and rear fences may not exceed 6 feet, electrified fences are banned, and barbed wire is not allowed next to streets or in residential districts.
Short on time to read all of this?
Get a free quote →Lima building department: who handles permitting
The building department sits in the Public Works area of city government; its Building Administrator is Douglas Ditto, P.E. Inside Lima it is the only office for residential and commercial building permits. The same staff also issue commercial permits in the townships and several villages of Allen County, but enforce the residential code inside the city limits only. Zoning is a separate city function in the Department of Housing and Neighborhoods.
| Need | Office and contact |
|---|---|
| Building, electrical, mechanical, fire protection permits | Lima/Allen County Building Department, 50 Town Square, Lima, OH 45801; (419) 221-5243; window hours Monday–Friday 11:00 a.m.–3:00 p.m. |
| Appointments outside window hours, inspections | 419-998-5541 |
| Zoning clearance, variances, rezoning | Planning Division, Department of Housing and Neighborhoods, 50 Town Square; (419) 221-5146 |
| Plumbing permits and inspections | Allen County Public Health, 219 E. Market St., Lima; 419-228-4457 |
| Water, sewer and refuse accounts | Utilities Department customer service, 424 N. Central Ave.; (419) 221-5252 |
| Online filing | SmartGov portal (applications, contractor registration, inspection requests) |
Lima sits in Allen County, but the county has no building office of its own and its website links to this department. For land outside the city, see the Allen County guide; parcels near the city line can be checked on the state’s building-department look-up map.
Lima permit types
Applications are made on SmartGov, which also shows plan review comments, permit status, address information and inspection results. The department also takes questions in person, by phone or by email and will set up meetings with the other agencies involved in a permit.
Residential permits
The residential checklist from the department asks for written zoning approval and engineering site and storm approval before plans are submitted, each with one set of site plans. Three sets of plans go to the building department, plus one more set for new construction or additions and one more if fire alarms or sprinklers are included. Permits can be taken out by an owner doing the work or by a registered contractor for the general, electrical, HVAC, fire alarm and sprinkler work. The department publishes policies for detached garages (with a sample garage drawing), swimming pools and tents.
- Pools, spas and hot tubs: any of them over 24 inches deep needs a barrier at least 48 inches high, 5-foot side and rear setbacks, and an electrical permit; none may sit in a front yard.
- Decks: priced by area under the pool policy.
- Electrical service release: filed as its own application on SmartGov, alongside the electrical permit.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Not sure this scope needs a permit?
Get a free quote →Commercial permits
Commercial, industrial, institutional and four-plus-unit residential buildings follow the Ohio Building Code. Inside the city the checklist asks for six sets of sealed plans and two sets of specifications, the zoning permit, engineering site approval where it applies, and Downtown Design Review Board approval for commercial projects in the Downtown Lima District. The department passes a set of plans to the fire department, and fire alarm and suppression systems are inspected under procedures written with the area fire chiefs. The posted list notes that expedited (formerly walk-in) plan review is temporarily unavailable.
For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning clearance. The Planning Division reviews zoning clearances, lot splits, rezonings and variances under the City of Lima Zoning Code; the department will not approve a building permit without the zoning certificate.
- Board of Adjustment. It hears appeals of zoning decisions, variances and special use permits at 3:30 p.m. on the second and fourth Wednesday when needed.
- City Planning Commission. It recommends rezonings to City Council and approves subdivision plats; its page lists a 4:00 p.m. start on those same Wednesdays, if required.
- Engineering. Engineering construction permits, which some projects inside the city need, are filed with the building and zoning office; the engineering division also handles flood hazard area development permits, street cut bonds and oversize load permits.
- Plumbing. Plans and the plumbing permit go to Allen County Public Health.
Lima permit costs and fees
Commercial building permits are priced from the department’s posted Commercial Building Cost Table, which is undated and headed “Building Permit Costs – OBBC”; confirm with the office that it is current. Residential figures are posted in the pool policy. The Board of Building Standards adds 1% to residential fees and 3% to nonresidential fees.
Rather talk it over?
Call 1-855-478-4290 →| Permit | Fee |
|---|---|
| Commercial building, value up to $1,000 | $18.00 |
| Commercial building, $1,001–$15,000 | $18.00 plus $1.20 per added $100; $186.00 at $15,000 |
| Commercial building, $15,001–$985,000 | $186.00 plus $9.60 for each added $1,000 |
| Commercial building, $985,001–$2,000,000 | $3.60 for each added $1,000 |
| Commercial building, $2,000,001–$5,000,000 / over $5,000,000 | $1.80 / $1.20 per $1,000 |
| Above-ground swimming pool | $50.50 including the 1% tax |
| In-ground swimming pool | $50.00 plus $0.05 per square foot, plus 1% |
| Deck | $50.00 plus $0.05 per square foot, plus 1% |
| Electrical permit (pool policy) | $10.00 plus $0.24 per amp of service, $4.80 per circuit under 30 amps and $7.20 per circuit over 30 amps, plus 1% |
| Contractor registration | $50 per trade, non-refundable |
| Residential plumbing (Allen County Public Health) | $50 permit plus $25 per unit; $75 reinspection |
| Garage sale permit | Free online; $5 at the office |
Two examples worked from the posted figures: a 300-square-foot deck is $50.00 plus $15.00, or $65.00, plus 1% for $65.65; a commercial build-out valued at $50,000 is listed at $522.00 in the cost table, plus 3% for $537.66. Homeowners who do their own plumbing also pay the health district’s plan review fee of $40 for up to 20 fixtures. The developer’s guide warns that work begun before applying is charged double, and unpermitted electrical work triple.
Trade permits and who may pull them
Lima writes its own electrical, HVAC, fire alarm and sprinkler permits; plumbing is the health district’s.
- Registering with the city. Contractors register online in SmartGov with a valid State of Ohio trade license (building contractors are exempt from that item), a liability insurance certificate of $300,000 listing the City of Lima as certificate holder, a workers’ compensation certificate and registration with the City of Lima Tax Department, and pay $50 per trade.
- Owners. On a house, the owner doing the work may take out the permit; otherwise a registered contractor must. On commercial jobs every permit except a general permit obtained by the owner needs a registered contractor.
- State license. Commercial electrical, HVAC, hydronics, plumbing and refrigeration contractors must hold an Ohio Construction Industry Licensing Board license.
- Plumbing. Plumbing contractors register and post a bond with Allen County Public Health. A homeowner may plumb a home only if living in it, after signing the health district’s notarized affidavit.
Rather not deal with the building department?
Get a free quote →How to apply for a Lima building permit
Call (419) 221-5243 or visit the counter between 11:00 a.m. and 3:00 p.m. to confirm which permits the project needs.
Apply to the Planning Division with a site plan, and to the Board of Adjustment if a variance is needed.
Get engineering site and storm approval, and set up water and sewer with the Utilities Department.
Every contractor on the job must be registered in SmartGov before permits can be issued to them.
File the residential or commercial application in SmartGov with the plan sets the checklist requires, and the plumbing application with the health district.
Pay the fees, keep the approved plans on site and book the first inspection.
Review, corrections and what causes delay
Plans are checked against the department’s plan examination checklists for residential and commercial work. Commercial drawings need an Ohio architect’s or engineer’s seal, design loads and, where Chapter 17 of the Ohio Building Code calls for it, a statement of special inspections. Downtown commercial projects add a design review step, and an unregistered contractor, a missing zoning certificate or an unapproved plumbing plan holds up issuance. Revised drawings go back through review before the changed work is built.
Inspections in Lima
Inspections are requested in SmartGov or at 419-998-5541 at least one business day before the visit; repeated inspections can be booked at once. Have the address, permit number and inspection type ready. The department’s inspection guide describes a call on the morning of the visit, between 7:30 and 8:30 a.m., to get a one-hour time window, and asks that inspections be cancelled when not needed or in bad weather.
A new house typically sees footing, foundation and backfill (both skipped for slab or crawlspace construction), crawlspace or slab, rough gas, rough electric, rough HVAC, framing after all rough-ins pass, insulation, fireplace, and the final electrical, HVAC and building inspections. Read the plan review notes on the approved drawings before work starts. A certificate of occupancy or a temporary certificate is required before a new house, unit or tenant space is used, and the health district’s plumbing final must also be approved.
Lima also has a five-member Board of Building Appeals, appointed by the Mayor from residents experienced in building construction, which meets at 2:00 p.m. on the third Wednesday of the month in the second-floor conference room at 50 Town Square, with no meetings in November or December.
Ohio building code in Lima
Lima enforces the Residential Code of Ohio for one-, two- and three-family homes and the Ohio Building Code for everything else; its own codified ordinances add zoning, fence and housing rules on top. FEMA’s Community Status Book lists the City of Lima (community 390006) as participating in the National Flood Insurance Program, with a current effective map date of June 20, 2024, and the city’s engineering division takes flood hazard area development permit applications.
Want this handled start to finish?
Get a free quote →Ohio has statewide building codes: the Ohio Building Code for commercial and other nonresidential buildings and the Residential Code of Ohio for detached one-, two- and three-family dwellings. Only departments certified by the Ohio Board of Building Standards may approve plans and inspect, and residential rules are uniform statewide. How Ohio’s statewide code works
Lima permit search and official resources
Permit, plan review and inspection information can be viewed in SmartGov by address. Rental property owners must also hold a free Rental Housing Unit Registration Certificate for every unit under legislation Council passed on January 2, 2024; the last deadline, for owners of one to four units, was June 30, 2025, and a buyer must update the registration within 30 days of closing.
- Lima/Allen County Building Department
- SmartGov permits and inspections
- Residential permit information and forms
- Commercial permit information and forms
- Residential permit and inspection guidelines
- Residential checklist
- Commercial checklist
- Commercial building permit cost table
- Swimming pool, spa and hot tub policy and fees
- Fence ordinance, Section 1262.02
- Planning and Zoning
- Board of Adjustment
- Board of Building Appeals
- Engineering permits and flood hazard application
- Rental housing unit registration
- Allen County Public Health plumbing permits
- FEMA Community Status Book, Ohio
Inspections are where schedules slip.
Get a free quote →Lima building permit FAQs
Who issues building permits in Lima?
The Lima/Allen County Building Department at 50 Town Square, which handles both houses and commercial buildings inside the city.
Do I need a permit for a new roof in Lima?
Yes for a new roof covering or a repair covering more than 25% of the roof surface, and for any new roof structure or structural roof repair.
How much is a pool permit?
$50.50 for an above-ground pool, or $50 plus 5 cents per square foot plus 1% for an in-ground pool, with a separate electrical permit in both cases.
How tall can my fence be?
Up to 3 feet 6 inches in a front yard and 6 feet on side and rear lines; a fence over 6 feet also needs a building permit.
Does a shed need a permit?
Not if it is a one-story detached shed under 200 square feet, though zoning setbacks still apply.
Can a homeowner pull permits?
Yes. The residential checklist lets an owner doing the work obtain the permits; plumbing done by an owner also needs the health district’s notarized affidavit.
How do I schedule an inspection?
Request it in SmartGov or call 419-998-5541 at least one business day ahead, with the approved plans on site.
Simplify Lima permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Ohio. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Lima sooner?
Let Alliance prepare, file, and track your Lima permits while your crew stays on the job.
More Ohio permitting guides
Allen County
Read guide →Auglaize County
Read guide →Putnam County
Read guide →Logan County Building Permit Guide
Read guide →Lorain Building Permit Guide
Read guide →Lorain County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Lima permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.