Galion, Ohio Building Permit Guide

To get a building permit in Galion, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Galion’s Building Department at 115 Harding Way East handles residential building, electrical and plumbing permits and zoning; commercial permits and inspections are handled by the Richland County Building Department in Mansfield.

Authority: Galion Building and Zoning DepartmentCommercial: Richland County Building DepartmentPhone: 419-468-2642
Residential permits
Galion Building Department115 Harding Way East, by appointment
New house permit
$100Plus $75 electrical, 2018 fee schedule
Commercial work
Richland County Building DeptMansfield, 419-774-5517
Review time
At least 1 weekNever same day, the city says

In Galion, residential building, electrical and plumbing permits and zoning permits come from the city’s Building and Zoning Department in the Utility Office at 115 Harding Way East (419-468-2642), where Eric Baldinger is the Building Official and sees applicants by appointment. Galion dropped its own commercial fees in 2014; commercial permits and inspections are handled by the Richland County Building Department, 1495 West Longview Avenue, Mansfield (419-774-5517). Under the city’s consolidated fee schedule, a new house costs $100 for the building permit and $75 for the electrical permit, plus a 1 percent state fee, and the city asks for at least a week to review an application.

What requires a building permit in Galion?

Galion’s rule is that any structure built or structurally altered needs a building permit. For houses, the city gives these examples: a new home or garage, a wood or concrete porch, a deck, a room addition, a change to the roof line, and any outbuilding larger than 8 by 10 feet. Moving a wall, adding or moving a door or window, or widening an opening so that it needs a new header also counts.

Permit needed

  • New homes, garages, porches, decks and additions
  • Roof line changes and outbuildings over 8 by 10 feet
  • New or upgraded electrical service, and rewiring or new receptacles in a remodel
  • New plumbing, including a second bathroom in existing space
  • Fences, pools over 1 foot deep, signs and satellite dishes over 39.37 inches
  • Demolition of any building or outbuilding
  • Driveways, curb cuts, sidewalks and sewer, storm and water taps

No permit needed

  • Replacement windows
  • Moving existing plumbing or replacing existing pipe, such as galvanized with plastic

Separate from the building permit, a zoning permit certifies the use of a property. Under Zoning Ordinance 91-5897 it is needed to build or structurally alter any building, including accessory buildings, to change the use of a building or land, to occupy vacant land, or to change a nonconforming use.

What Galion decides and what the state holds

Galion runs its own residential building department under the state code, sets its own fees and writes its own zoning code. The state’s code itself is uniform for houses, so Galion’s choices are about process: what it lists as needing a permit, its fees, its inspection notice periods and its zoning rules. Commercial buildings follow the state’s nonresidential code, enforced in Galion by Richland County’s department; the Board of Building Standards’ look-up map shows which department holds authority at any address.

Short on time to read all of this?

Get a free quote →

Galion building department: who handles permitting

The city’s Building and Zoning office issues residential building, electrical, plumbing, HVAC, zoning and most site permits, and the Building Official reviews fence site plans with applicants. Richland County’s department reviews, permits and inspects commercial projects: Galion’s fee schedule says all commercial building fees ended on June 12, 2014, and that Richland County conducts all commercial permitting and inspections. Richland County’s jurisdiction list includes Galion for commercial work, although a line in its FAQ describes its Crawford County area as excluding the city; Galion’s own pages send every commercial project to Richland County.

Galion permit contacts
OfficeDetails
Building and Zoning Department (residential)Utility Office, 115 Harding Way East, Galion, OH 44833; 419-468-2642; Building Official Eric Baldinger, by appointment; fax 419-468-7620 (the building permit page gives 419-468-7137)
Richland County Building Department (commercial)1495 West Longview Avenue, Suite 202A, Mansfield, OH 44906; 419-774-5517
City Hall and Board of Zoning Appeals secretary301 Harding Way East; 419-468-1857; Monday to Friday 8:00 a.m. to 4:00 p.m.
Galion Health Department113 Harding Way East; 419-468-1075 (food service plans)
UtilitiesUtility office 419-468-6611; electric line department 419-468-5520; wastewater treatment 419-468-5010

Galion permit types

Galion uses a separate paper application for each permit, posted on its Permits page; most can be emailed, faxed, mailed or dropped off at 115 Harding Way East. The building permit application asks for the lot size, the size and height of the structure, the first-floor elevation and the estimated construction cost, with drawings showing a cross-section from foundation to roof, engineered truss drawings and electrical plans.

Residential permits

  • Building. New homes, additions, alterations and outbuildings, with a construction plan, site plan and material list. A signed, stamped truss drawing from the supplier is needed for engineered trusses.
  • Electrical. New service or an upgrade such as 60 to 100 amps, and possibly a meter move; rewiring or adding receptacles in a remodel needs both an alteration permit and an electrical permit. Only the city’s electric division may loosen or remove a meter base.
  • Plumbing and HVAC. A residential plumbing permit for new plumbing; HVAC work on an addition, alteration or renovation has its own fee.
  • Driveways and demolition. A new driveway, a widened apron or a switch to concrete needs a driveway permit, with an inspection after the forms are set and 48 hours’ notice before the pour; resurfacing in asphalt needs none. A demolition permit needs a copy of the deed, and a capped sewer must be inspected by the wastewater department.
  • Fences and pools. Chain link fences in residential zones may be up to 5 feet and privacy fences up to 8 feet, set either up to (never on) the line or 3 feet back depending on the type. In-ground pools need fencing at least 5 feet high; above-ground pools usually need a railing to 5 feet with a locking ladder.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Commercial building plans go to Richland County, which needs sealed drawings from an Ohio-registered architect or engineer and takes about 7 to 10 business days. The city still issues the zoning side: a commercial zoning permit, a commercial site plan review, and a zoning compliance certificate with an inspection whenever a commercial building changes use, changes tenants or changes the name on the utilities. The city’s plumbing page sends commercial plumbing permits to the State of Ohio under an old division name, while Richland County tells plumbing contractors to check with the local health department, so ask the Building and Zoning office which office issues a commercial plumbing permit; food service plans go to the Galion Health Department with one set of plans.

What comes before the building permit

  • Zoning. Allow 10 days for the zoning certificate. Check the district on the city zoning map; the districts are set out in Chapter 11 of the codified ordinances.
  • Variances. A project that does not meet the zoning code goes to the Board of Zoning Appeals through its secretary at 301 Harding Way East.
  • Site plan. Draw the lot to scale with the setbacks; the Crawford County Auditor’s website gives parcel maps.
  • Flood plain. Development in a special flood hazard area needs the city’s floodplain development permit.
  • Design review. Demolishing a building in the Design Review District needs a separate application to the Design Review Board, with photographs and a hand-drawn site plan; the board’s decision follows within 7 days of its meeting unless the item is tabled.
  • Mobile homes. They may be placed only in areas zoned for a mobile home subdivision or in the parks on Clay Street and Murray Street. The permit needs a zoning compliance certificate and a site plan, and the Galion Health Department handles the other inspections.

Galion permit costs and fees

Galion’s Consolidated Fee Schedule is dated January 1, 2018, with fees effective from May 11, 2017; the city’s FAQ points applicants to its pages 4 and 5. Residential building, electrical and plumbing permits carry a 1 percent state fee on top, collected for the Board of Building Standards and shown as the “Ohio Assessment Fee” on the application.

Rather talk it over?

Call 1-855-478-4290 →
Galion residential and zoning fees (Consolidated Fee Schedule, 2018)
ItemFee
Building permit, new house$100
Building permit, addition, alteration or renovation$40 plus $0.05 per sq ft
Electrical permit, new house$75
Electrical permit, addition, alteration or renovation$30 plus $0.05 per sq ft
Electrical service inspection$25
Plumbing permit / HVAC addition, alteration or renovation$60 / $25
Residential zoning permit / commercial zoning permit$25 / $50
Fence, pool or sign permit$25 each
Demolition permit$50
Re-inspection / certificate of occupancy / permit renewal$50 / $50 / $10
Driveway / curb cut$25 / $20
Floodplain development permit application$20
Commercial site plan review$300

A worked example from the schedule: a 400-square-foot room addition with wiring costs $60 for the building permit ($40 plus 400 × $0.05), $50 for the electrical permit ($30 plus $20) and $25 for the zoning permit, plus 1 percent of the building and electrical fees ($1.10), or $136.10. Starting work before a permit is issued doubles that permit fee, and the schedule’s separate fee-modification rule charges 100, 200 or 300 percent of the fees for a first, second or third offense; appeals go to the Board of Zoning Appeals within 20 days. The city’s Zoning Fees page lists a $150 variance fee, while the 2018 schedule lists $50 for a residential and $75 for a commercial variance, so confirm the figure before filing. Commercial building fees are set by Richland County.

Trade permits and who may pull them

Galion issues residential electrical, plumbing and HVAC permits through the same Building and Zoning office, each inspected at rough-in and final. Sewer taps are different: the city says a licensed contractor is not required for a sanitary sewer hookup, although it strongly urges using an experienced one.

Rather not deal with the building department?

Get a free quote →
  • Electrical. Sketches and specifications to help with a residential electrical job are available at 115 Harding Way East. Tampering with a meter carries a $100 fine or loss of service.
  • Plumbing. Rough-in and final inspections for residential work; the city does not issue commercial plumbing permits (see above for whom to ask).
  • Commercial trades. Richland County’s permit covers building, electrical and mechanical inspections, and commercial electrical, HVAC, plumbing and fire-protection work must be done by contractors licensed by the Ohio Construction Industry Licensing Board.
  • Sewer connections. Downspouts, sump pumps and foundation drains may not be connected to the sanitary sewer.

How to apply for a Galion building permit

1. Call the Building and Zoning office

Describe the work at 419-468-2642; staff will say which permits apply and book an appointment.

2. Check zoning

Find the zoning district on the city map and apply for the zoning permit, allowing 10 days.

3. Prepare plans

Draw a site plan to scale and a construction plan from foundation to roof, with truss drawings and a material list.

4. File each application

Submit the building, electrical and plumbing forms by email, fax, mail or at 115 Harding Way East.

5. Pay and post the permit

Pay the fees and keep the permit posted in a window visible from the street.

6. Send commercial jobs to Richland County

Business projects file sealed plans with Richland County and get the zoning approval from Galion.

Review, corrections and what causes delay

The city asks applicants to allow at least a week for review and warns never to expect a permit on the day of application; most are issued sooner when the information is complete. Missing truss drawings, a site plan without setback distances or a zoning conflict that needs a variance cause most delays. Building official hours are by appointment, so call before coming in.

Inspections and certificates in Galion

Residential inspections are booked with the Building and Zoning office at 419-468-2642. Call at least 48 hours before a footer or rough-in inspection and at least 7 days before a final inspection. A building permit needs a footer inspection before the footer is poured or poles or trailer pads are set, a rough-in before insulation or wall covering, and a final before use or occupancy. Electrical and plumbing work have rough-in and final inspections on the same notice periods, pools are inspected when finished, and fences need no inspection. The certificate of occupancy costs $50 and a re-inspection $50.

Commercial inspections are booked with Richland County at 419-774-5517 with 24 hours’ notice; it inspects Crawford County commercial jobs on Tuesdays and Thursdays. A sewer tap must be inspected by the wastewater department (419-468-5010) before the hole is covered.

Want this handled start to finish?

Get a free quote →

Ohio building code in Galion

Galion enforces the state’s residential code through its own department, and Richland County enforces the nonresidential code there. FEMA’s Community Status Book lists the City of Galion (community 390092) as participating in the National Flood Insurance Program, with a current flood map dated October 19, 2023.

Ohio has statewide building codes: the Ohio Building Code for commercial and other nonresidential buildings and the Residential Code of Ohio for detached one-, two- and three-family dwellings. Only departments certified by the Ohio Board of Building Standards may approve plans and inspect, and residential rules are uniform statewide. How Ohio’s statewide code works

Galion permit search and official resources

Residential permit records are kept by the Building and Zoning office at 115 Harding Way East; ask the Building Official for a parcel’s permit history. Commercial permits and certificates of occupancy issued by Richland County are held by that department in Mansfield, and parcel lines and maps are on the Crawford County Auditor’s website.

Inspections are where schedules slip.

Get a free quote →

Galion building permit FAQs

Who issues building permits in Galion?

The city’s Building and Zoning Department for residential work; the Richland County Building Department for commercial projects.

How much is a permit for a new house?

$100 for the building permit and $75 for the electrical permit, plus the $60 plumbing permit, the $25 zoning permit and a 1 percent state fee.

Do I need a permit for a shed?

Yes, if it is larger than 8 by 10 feet; it also needs a construction plan and site plan.

How tall can my fence be?

Chain link fences in residential zones may be up to 5 feet and privacy fences up to 8 feet, and every new or replaced fence needs a $25 permit.

Do I need a permit to replace windows?

No, replacement windows do not need one; adding a window or widening an opening does.

How long does a permit take?

Allow at least a week; the zoning certificate alone takes 10 days.

How do I book an inspection?

Call 419-468-2642 at least 48 hours before footer and rough-in inspections and 7 days before the final.

Simplify Galion permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Ohio. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Galion sooner?

Let Alliance prepare, file, and track your Galion permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Galion permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.