Clark County, Ohio Building Permit Guide

Everything contractors, builders and developers need to pull a Clark County building permit — the Community and Economic Development office on East Main Street and its hours, Springfield’s separate department, the statewide farm-building exemption, zoning and inspections.

Authority: Community and Economic DevelopmentOffices: 3130 E Main St, SpringfieldWatch: Closed 12:00 to 1:00
Midday closure
12:00 to 1:00Plan the visit
Opens at 7:30
Counter closes 4:00Office closes 4:30
Springfield separate
The city permits its ownConfirm the parcel
Zoning
County in 7 townshipsOthers zone their own

Building permits across much of Clark County come from Clark County Community and Economic Development at 3130 East Main Street, Springfield. Clark lies between Dayton and Columbus, and the county describes itself as predominantly rural; Springfield, the county seat, is its largest community.

This guide covers the department and how to reach it, the local conditions that shape a filing here, what permits cost and who may pull them, and how inspections are booked. Rules that apply everywhere in Ohio are summarized in each section, with a link to the full statewide explanation.

This guide covers the areas the county department serves for building and electrical inspections: the unincorporated county, the city of New Carlisle and the villages of Catawba, Donnelsville, Enon, North Hampton, South Charleston and South Vienna. Springfield is the only municipality in the county with its own certified department. Tremont City is on neither list: the Board of Building Standards data shows no certified department there, so commercial plans go to the state and houses need no state or county building permit (ORC 3791.04).

⚠️

The office closes for lunch from noon to 1:00, and the front counter closes at 4:00. Community and Economic Development opens at 7:30am, Monday to Friday, and the office closes at 4:30pm. Plan counter business outside the lunch hour, and note that the City of Springfield permits its own limits through its own department.

What requires a building permit in Clark County?

Under the Ohio Building Code and the Residential Code of Ohio, a permit is required for most construction activity.

Permit required

  • New residential and commercial construction, additions, alterations and conversions
  • Structural and load-bearing work, foundations, decks, porches, ramps and stairs
  • Finishing basements and attics, and any change of occupancy or use
  • Electrical service changes, panel work, new circuits, solar and EV charging equipment
  • Plumbing alterations, repipes, water heaters, backflow and sewer or gas connections
  • HVAC installation and change-out, ductwork and venting; reroofing, siding, windows, pools and signs

Typically exempt

  • Painting, wallpapering, tiling, carpeting and cabinet installation
  • Minor repairs that do not cut away walls, touch structural supports or change the means of egress
  • Fences up to 6 feet at houses (7 feet under the Ohio Building Code) and retaining walls up to 4 feet that support no surcharge
  • One-story detached sheds and playhouses up to 200 square feet at houses (120 square feet under the Ohio Building Code)

The exempt list is set statewide in Section 102.10 of the Ohio Building Code and the Residential Code of Ohio, and an exemption from a building permit is not an exemption from zoning, setbacks, floodplain rules, utility approval or a fire authority review. Confirm scope with the department before work starts rather than after.

Short on time to read all of this?

Get a free quote →

Which code edition applies

The county's certified departments enforce the statewide Ohio codes, so the technical standard is constant across the county. Fees, submittal processes, zoning frameworks, inspection scheduling and any additional local regulations are what differ between county and municipal departments.

⚠️ Farm buildings are exempt by state law, not by a local threshold. A building incident to the agricultural use of the land it stands on is exempt from the Ohio building codes unless it is used in retail trade (ORC 3781.06(B)(1)), and so is a building that a county or township zoning inspector certifies for agricultural use (ORC 3781.061). Size and utilities are not tests in either section. Ask the department what it needs on file for the exemption before ordering or siting a building.

Permits in Clark County are governed by Ohio’s statewide codes: the Ohio Building Code for commercial and other nonresidential buildings, and the Residential Code of Ohio for detached one-, two- and three-family dwellings. The Ohio Building, Mechanical and Plumbing Codes in force since 1 March 2024 are based on the 2021 International Codes; the Residential Code of Ohio is the 2019 edition, based on the 2018 International Residential Code; both use the 2023 National Electrical Code. Only departments certified by the Ohio Board of Building Standards may approve plans, and residential rules are uniform statewide. How Ohio’s statewide code works

Who handles permitting in Clark County?

Permits are issued by the certified department with authority over the address. Community and Economic Development is also the zoning office for Bethel, Green, Harmony, Mad River, Madison, Moorefield and Pleasant townships; German, Pike and Springfield townships, the cities and the villages handle their own zoning.

Clark County permitting contact
DetailInformation
AuthorityClark County Community and Economic Development (Community Development division)
Offices3130 East Main Street, Springfield, Ohio 45505
Phone937-521-2160
Counter hoursMonday to Friday: office 7:30am to 4:30pm, closed noon to 1:00pm; front counter closes at 4:00pm
City departmentThe City of Springfield permits work inside its own limits
ServesThe unincorporated county; New Carlisle; Catawba, Donnelsville, Enon, North Hampton, South Charleston and South Vienna
Confirm the departmentUse the BBS building-department lookup before filing
CodeOhio Building Code on the 2021 International Codes (since 1 March 2024); Residential Code of Ohio, 2019 edition on the 2018 IRC; 2023 NEC
Contractor credentialsOCILB licence for commercial electrical, HVAC, hydronics, plumbing and refrigeration work; the county has a contractor registration form, and contractors need an access code for its online permit portal

The county’s Online Permit Portal takes building and zoning applications and fees and shows permit status and inspection results. Property owners need no access code; contractors do, and can get it from the department on 937-521-2160. Plan revisions go by email rather than through the portal, and permits are not issued until every required submittal is in and the fees are paid.

Not sure this scope needs a permit?

Get a free quote →

One point applies across every Ohio jurisdiction and is worth confirming here rather than assuming. Residential rules are uniform statewide: a local code may differ from the Residential Code of Ohio only on subject matter the state code does not address, or after review by the Board of Building Standards (ORC 3781.10, 3781.01). Municipalities may add nonresidential regulations that do not conflict with the state rules. Ask the issuing department whether any local regulation affects your project type.

In 2025, building permits issued in unincorporated Clark County authorized 176 new privately owned housing units, 138 of them single-family homes, according to the U.S. Census Bureau Building Permits Survey.

Zoning is a separate approval, and often a separate office

Zoning is a separate approval. The county’s permit guide marks which projects need zoning as well as a building permit: a detached accessory structure, for example, needs zoning at 120 square feet or more and a building permit over 200 square feet. In the seven townships it zones, the county takes the zoning certificate application; elsewhere the township, city or village does.

The Ohio Board of Building Standards certifies which departments may enforce the code, and for which buildings; the certified department’s political subdivision sets fees, and zoning is a separate approval. Where no certified department has jurisdiction, nonresidential plans go to the state, while houses need no plan submission. The Board’s building-department look-up shows which department has authority over an address. Who has authority in Ohio

Permit types

Residential permits

One-, two- and three-family dwellings follow the Residential Code of Ohio. The county publishes its residential plan approval process, residential design criteria and a typical inspection list with its application forms.

Commercial permits

Commercial buildings, and multifamily buildings of four or more units, follow the Ohio Building Code and are filed with the county on its non-residential plan approval application.

Two statewide topics shape most Ohio submittals: energy compliance (the 2021 IECC or ASHRAE 90.1-2019 for commercial buildings, Chapter 11 of the Residential Code of Ohio for houses) and work on existing buildings, where alteration, repair, addition and change of occupancy each carry their own requirements. Energy and existing buildings in Ohio

Clark County permit costs and fees

Fees are set by whichever certified department issues the permit, and a Board of Building Standards assessment of 3 percent of nonresidential and 1 percent of residential fees is added (ORC 3781.102).

Rather talk it over?

Call 1-855-478-4290 →
How Clark County permit fees are structured
Fee componentHow it works
Plan reviewCharged under the issuing department’s adopted schedule
Building permitSet by the issuing certified department's adopted fee schedule
Trade permitsElectrical, plumbing and mechanical work is charged under the issuing department’s schedule
State BBS assessmentCollected on top of local fees for the Board of Building Standards: 3% of nonresidential and 1% of residential fees (ORC 3781.102)
Certificate of OccupancyA separate fee where applicable
Work without a permitOrders, including stop-work orders, and prosecution (OBC and RCO Section 109)
🧮

Need a real number for a specific Clark County project? Send us the scope, address and valuation and we will identify the filing path, the reviews it will trigger and the fee categories that will apply.

Fee schedules are revised on each jurisdiction’s own cycle, so ask the issuing department for the schedule in force on your filing date, and ask separately about plan review, trade, re-inspection and revision charges. A Board of Building Standards assessment of 3 percent (nonresidential) or 1 percent (residential) is added to local fees. How Ohio permit fees work

Trade permits and who may pull them

Permit required

  • Service installations, panel upgrades, new circuits, solar PV and EV chargers
  • New plumbing, repipes, water heater change-outs, fixtures, backflow and gas piping
  • HVAC installation and change-out, ductwork, venting and commercial kitchen exhaust
  • Sprinkler, standpipe and fire alarm work under the OBC fire-protection provisions

Typically exempt

  • Replacing lamps, reinstalling plug receptacles and replacing circuit breakers of the same capacity and type in the same location
  • Clearing stoppages and repairing leaks, where no more than one fixture is replaced and no pipes are rearranged
  • Replacing a mechanical-equipment part that does not alter the equipment’s approval or make it unsafe
  • Replacing a minor gas-appliance part that does not alter the equipment’s approval or make it unsafe

Rather not deal with the Clark County building department?

Get a free quote →

Ohio licenses five commercial trades statewide through the Ohio Construction Industry Licensing Board: electrical, HVAC, hydronics, plumbing and refrigeration. The state does not license general or residential contractors, so those are licensed or registered locally, if at all. Home construction contracts of $25,000 or more must be in writing under ORC 4722. Contractor licensing in Ohio

How to apply for a Clark County building permit

1. Plan counter visits around the midday closure

The counter is open 7:30 to 12:00 and 1:00 to 4:00.

2. Check whether a farm building is exempt

The test is agricultural use and no retail trade (ORC 3781.06(B)(1)), not size.

3. Get a contractor access code

Contractors need one to use the online permit portal.

4. Find the zoning office

The county zones seven townships; the other townships, the cities and the villages zone their own.

5. Confirm which certified department has authority

Use the BBS lookup; certification does not follow from the type of local government.

6. Check OCILB commercial trade licences and local registration

The state half and the local half are separate, and neither substitutes for the other.

Approved plans become invalid if work has not started within twelve months, with one twelve-month extension available. Before filing, confirm the department has authority over the address for the work, whether the Ohio Building Code or the Residential Code of Ohio governs, and which approvals must be in hand first. Review and corrections in Ohio

Inspections in Clark County

Schedule inspections with the certified department that issued the permit. The building official lists the required inspections when the plans are approved (OBC and RCO 108.2); they include foundation, framing, rough-in trades, insulation and energy, and final, with a Certificate of Occupancy required before legal occupancy of new or changed-use space. Unsewered parcels add on-site sewage verification.

The county uploads the approved documents to the online portal. Print them and have them on site for every inspection; the portal also shows inspection results.

No building may be occupied until a certificate of occupancy or completion is issued, and a change of occupancy needs approved construction documents even without other work. Address correction notices before requesting a re-inspection, and do not cover work before it has been inspected and approved. Inspections and occupancy in Ohio

Want this handled start to finish?

Get a free quote →

Clark County permit search and official resources

Permit records sit with the department that issued them, which in Ohio makes record research a certification question first. A property may have records with a municipal department, a county department, a township department or the state, depending on who held authority at the time the work was done — and that can have changed if a department gained or gave up certification, or if the property was annexed. If you are buying, refinancing or renovating, ask Community and Economic Development, which also publishes lists of permits issued, what it holds for the parcel and whether earlier records may sit elsewhere.

The Board's building-department lookup helps here too: it establishes who has authority today, which is the right starting point even when the history is more complicated.

🔑

Confirm two things before you file: the code, and the department. The Ohio Building Code has been based on the 2021 International Codes since 1 March 2024, the Residential Code of Ohio is the 2019 edition based on the 2018 International Residential Code, and both use the 2023 National Electrical Code — but the department with authority over your address, and the scope of its certification, is the answer that changes from parcel to parcel. Use the Board's building-department lookup, then confirm fees, submittal requirements and review turnaround with that department for your filing date.

These are the primary sources behind this guide. Codes, fee schedules and portal procedures change. Confirm the position for your filing date.

Frequently asked questions

What are the counter hours?

Monday to Friday. The office opens at 7:30am, closes for lunch from noon to 1:00pm and closes at 4:30pm; the front counter closes at 4:00pm.

Does my agricultural building need a permit?

Not if it is incident to the agricultural use of the land it stands on and is not used in retail trade: such buildings are exempt from the Ohio building codes (ORC 3781.06(B)(1)). A building that a county or township zoning inspector certifies for agricultural use is also exempt (ORC 3781.061). Size and utilities are not tests. Ask the department what it needs on file for the exemption.

Inspections are where schedules slip.

Get a free quote →

How do I know which department issues my permit?

Use the Board of Building Standards building-department lookup, which maps an address to the department with authority over it. Only a BBS-certified department, or the state, may approve plans and issue permits, and certification does not follow automatically from being a city, county or township.

Does my project fall under the OBC or the RCO?

Commercial, industrial and public buildings follow the Ohio Building Code. One-, two- and three-family dwellings follow the Residential Code of Ohio. Ohio’s residential code reaches three-family dwellings, where the International Residential Code stops at two.

What if no certified department serves the area?

The Division of Industrial Compliance performs commercial plan review and inspection where no certified department serves. Residential code enforcement, however, is carried out only by certified local departments, so the fallback is commercial-only.

Does my general contractor need an Ohio licence?

There is no statewide general-contractor licence in Ohio. The state licenses five commercial trades through the OCILB — electrical, HVAC, hydronics, plumbing and refrigeration — while general contractors, and trade contractors on residential work, are licensed or registered only where a local government requires it. Home construction and improvement contracts of $25,000 or more on one-, two- and three-family dwellings must be in writing under ORC 4722, and the supplier must carry at least $250,000 of general liability insurance.

Simplify Clark County permitting with Alliance Permitting

In Clark County we settle two things first: whether the county or Springfield has the parcel, and whether a farm building is exempt.

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Trusted by leading builders, developers, and national contractors — 21+ years of filing in the jurisdictions we write about.

Contractors and builders choose Alliance for Clark County because the work is done by people who have stood at the counter:

  • We plan counter business around the midday closure.
  • We check whether a farm building qualifies for the statutory exemption.
  • We file through the county’s online permit portal.
  • We clear zoning with the township or municipality separately.
  • We confirm county versus city jurisdiction on the parcel.

Alliance Permitting is a permit documentation and submission company in Ohio. We prepare your paperwork, file it correctly and coordinate with the building department through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Clark County sooner?

Let Alliance prepare, file, and track your Clark County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Clark County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.