In the City of Brooklyn, permits come from the Building Department at City Hall, 8000 Memphis Avenue (216-635-4203), where Michael Greer is the Building Commissioner. The city says it holds Ohio Board of Building Standards certification to enforce the residential and commercial codes. The office is paperless: apply, register contractors and book inspections through Citizenserve, or get help at City Hall. Under Section 1345.01 a new one-, two- or three-family home costs $150 plus 1% of its valuation, and the city says not to expect a permit on the day you apply.
What requires a building permit in Brooklyn?
Brooklyn requires a building permit before any excavation, grading, construction, alteration, repair, moving or demolition of a dwelling or the structures that go with it, and separate permits for electrical, plumbing, heating, air conditioning and other equipment. The city’s permit requirements page lists common jobs and whether each needs a permit and drawings.
Permit needed
- New buildings, additions, sunrooms, porches and new walls
- Decks, covered patios, patios, garages, carports and all sheds
- Fences, retaining walls, driveways and site work
- Roofs, siding and new windows or doors (no drawings for roofs and siding)
- Electrical and plumbing work, furnaces, air conditioners and hot water tanks
- Pools, waterproofing, signs, awnings and canopies
- Fire suppression systems and alarms, demolition, and tents rented for large events
No permit
- Painting and paneling
- Flooring
- Gutters and downspouts
- Flagpoles
- Tuck-pointing
- A door replaced like for like
Emergency repairs to equipment can go ahead first, but the permit application must be filed on the next working day. Permits are issued to whoever physically does the work, owner or contractor, and many types need approved plans before they issue, so leave time for review.
What Brooklyn decides and what the state holds
The state writes the Ohio Building Code and Residential Code of Ohio; Brooklyn’s codes page says the city has full authority to enforce them, with the mechanical and plumbing codes, under its Board of Building Standards certification. The city sets its own fees (Section 1345.01), registers contractors, licenses rental properties, registers vacant properties, requires notice of foreclosures, and runs zoning under its 2023 Planning and Zoning Code, in effect since May 23, 2023. FEMA lists Brooklyn as a participating flood insurance community, with maps dated December 3, 2010. Brooklyn Heights is a separate village with its own government.
Brooklyn building department: who handles permitting
The Building Department reviews construction plans and documents, issues permits, inspects the work and registers contractors to check licensing and insurance. Its property maintenance program inspects exterior property areas and rental dwellings. Commercial plan examination is done by the city’s contracted plans examiner, who sets the plan review fee and bills the applicant directly.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Building Department, Brooklyn City Hall, 8000 Memphis Avenue, Brooklyn, OH 44144 |
| Phone | 216-635-4203 |
| buildingdepartment@brooklynohio.gov | |
| Permit window | 7:30 a.m. to 3:00 p.m.; checks and credit cards only |
| Building Commissioner | Michael Greer |
| Online portal | Citizenserve (linked from the city’s permit application page): permits, contractor licenses, inspections |
| City Hall main line | 216-351-2133, 8:00 a.m. to 4:30 p.m. |
Brooklyn permit types
Every application goes through the portal: register for an account, then choose the permit type. Change of occupancy is filed as a Commercial Building permit with the Occupant/Tenant Change subtype, special events and lot splits have their own types, and the Planning Commission, Board of Zoning Appeals, City Engineer and plan approval forms are uploaded with the permit application.
Residential permits
- New homes and additions need approved plans before the permit issues; the fee schedule also sets a City Engineer residential site review fee of $500, plus $250 where landscaping is reviewed.
- Fences use the city’s fence neighbor sign-off form along with the permit application.
- Garages up to 480 square feet of floor area pay a flat fee, with more for each extra 100 square feet; a garage pad alone has its own lower fee.
- Homeowner work worth up to $5,000 can go on one combination permit (see trades).
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Commercial additions, new buildings and remodels start with a Certificate of Plan Approval application and electronic plans in the portal. The contracted plans examiner sets the fee from the project’s size and scope under the Ohio Building Code and invoices it separately; review typically takes two to three weeks after payment, and a resubmittal brings another invoice and needs a written response. The Certificate of Approval is not a permit: the contractor doing the work then applies for the permits, and the stamped plans must be kept on site. As-built drawings are emailed to the Building Department when the job is done.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Zoning check. Confirm the use is allowed in the district, whether Planning Commission approval of a conditional or similar use is needed, and whether a variance is required.
- Planning Commission. Reviews commercial additions and new construction, conditional uses, lot splits and consolidations, major commercial site changes and new or replacement signs. It meets on the first Wednesday at 6 p.m. in the City Hall conference room, with deadlines about three weeks earlier.
- Commercial site plans. Preliminary site plan approval from the Planning Commission comes first, then the City Engineer Plan Approval application, approval from the Cuyahoga County Department of Public Works for underground storm and sanitary work, and sign-off from the utilities (Cleveland Water, NEORSD, FirstEnergy, Cleveland Public Power and Dominion) before final site plan approval.
- Board of Zoning Appeals. Hears variances, appeals and requests for relief on the third Thursday at 6 p.m.
Brooklyn permit costs and fees
Brooklyn’s fees are in Section 1345.01, the building schedule of fees, last updated February 14, 2023. Most building permits combine a base fee with a percentage of the project’s valuation, and the Building Official may ask for cost records up to three months after completion and bill more if the real cost was higher. Work started without a permit or plan approval costs double. The Board of Building Standards adds its assessment of 1% of residential and 3% of nonresidential fees.
| Work | Fee |
|---|---|
| New 1–3 family home | $150 + 1% of valuation |
| New commercial, industrial, mercantile, assembly or apartment building | $200 + 2% of valuation up to $500,000, then 1% |
| Residential addition, alteration, structural change, remodel or fire damage | $30 + 1% of valuation |
| Commercial addition, alteration or remodel | $35 + 2% of valuation up to $500,000, then 1% |
| Site improvements | 1% of valuation |
| Detached garage up to 480 sq ft | $75 + $10 per 100 sq ft over 480 |
| Fence; accessory building; residential roof or windows | $50 each |
| Pool above ground / in ground | $50 / $100 |
| Demolition: house / commercial / garage | $250 / $500 / $75 |
| Plumbing or electrical permit | $50 base plus per-fixture or per-outlet charges |
| Residential HVAC | $50 per unit |
| Driveway or other surfacing | $100 for the first 1,000 sq ft + $10 per 500 sq ft |
| Apron, curb cut or sidewalk | $35 |
| Permanent sign; temporary sign or banner | $25 + $2 per sq ft; $25 |
| Homeowner combination permit (work up to $5,000) | $35 |
| Certificate of occupancy; plan review approval certificate | $75; $50 (plan examination billed by the examiner) |
| Re-inspection or special inspection | $75 (not charged on homeowner permits) |
Rather talk it over?
Call 1-855-478-4290 →Worked example from the schedule: a new house valued at $300,000 pays $150 plus 1% of $300,000, or $3,150, before trade permits, the state assessment and the residential site review. Board fees are $75 for a regular Planning Commission meeting ($500 for a special one), $200 for a lot split or consolidation, $50 for a regular Board of Zoning Appeals hearing ($75 special) and $100 for a conditional use or zoning change. City Engineer review of a commercial site under an acre is $1,000 plus $500 for landscaping.
Work in the street carries refundable deposits, less a retainer and inspection fee: a street opening deposit of $500 plus $25 per square foot over 25 square feet, and an obstruction deposit of $100 for homes or at least $500 for commercial work, plus $25 a day after two days. Both permits need the Service Director’s approval first, flaggers or barricades must be provided, and the deposit is forfeited if buried utilities are damaged because the Ohio Utilities Protection Service was not called before digging.
Trade permits and who may pull them
Plumbing, electrical and HVAC each take their own permit. Plumbing starts at $50 plus $2 per fixture and $5 per gas outlet; electrical starts at $50 plus $2 per receptacle or light outlet, with $25 for a panel or service. Contractors must hold a valid registration, or license where one is required, before they apply. Brooklyn’s registration:
- is filed and renewed in the Citizenserve portal, with no paper forms;
- costs $100, paid in the portal with no convenience fee, or by mailed check after emailing the department;
- needs no bond;
- needs a certificate of liability insurance of at least $1,000,000 naming the City of Brooklyn as certificate holder;
- needs a current State of Ohio license for electrical, HVAC, plumbing or fire protection contractors.
Returning contractors renew their existing license in the portal rather than opening a new account. The city posts a list of contractors registered to work in Brooklyn.
Rather not deal with the building department?
Get a free quote →Homeowners. A homeowner who lives in the home and does the work personally may take out a single combination permit for $35 covering alterations, remodeling, plumbing, electrical and heating work, as long as the total value is no more than $5,000. Re-inspection and special inspection fees do not apply to homeowner permits.
How to apply for a Brooklyn building permit
Read the 2023 Planning and Zoning Code and zoning map for the use, setbacks and any conditional use or variance.
Register on the portal; contractors also register or renew their city license there.
Commercial work needs a Certificate of Plan Approval, and site work the Planning Commission and City Engineer.
Choose the permit type and upload drawings, the valuation and any board or engineer forms.
Pay in the portal or at the permit window, 7:30 a.m. to 3:00 p.m.
Do not expect the permit on the day you apply; jobs that need plan review take longer.
Review, corrections and what causes delay
Commercial plan examination runs two to three weeks after the examiner’s invoice is paid, and each resubmittal brings a new fee and needs written answers to the review comments. A permit can be refused to an applicant with uncorrected violations or a record of noncompliance; the refusal comes by certified mail, and the applicant has 10 days to appeal to the Director of Public Safety, with the hearing before the Board of Zoning Appeals.
Inspections and certificates in Brooklyn
Book inspections in the portal by picking a date and time, or call 216-635-4203 at least 24 hours ahead. The permit holder must call for inspections at each stage before work is covered: footing drains, building drains and sewers, the finished foundation and waterproofing, framing, rough plumbing, wiring, gas piping and ductwork, structural elements before they are closed in, and final completion. Work found incomplete or needing correction costs $75 for each later inspection.
A certificate of occupancy costs $75. For commercial jobs, the Certificate of Plan Approval and stamped plans must be printed and kept on site, and as-built drawings go to the department at the end. The property maintenance program separately inspects exterior property areas and rental dwellings, and the Building Department licenses rental properties, registers vacant ones and must be told of foreclosures.
Ohio building code in Brooklyn
Brooklyn enforces the Residential Code of Ohio and the Ohio Building, Mechanical and Plumbing Codes under its Board of Building Standards certification, as its codes page states, and its own property maintenance code for existing buildings. The Board’s look-up map shows which department has authority over an address.
Want this handled start to finish?
Get a free quote →Ohio has statewide building codes: the Ohio Building Code for commercial and other nonresidential buildings and the Residential Code of Ohio for detached one-, two- and three-family dwellings. Only departments certified by the Ohio Board of Building Standards may approve plans and inspect, and residential rules are uniform statewide. How Ohio’s statewide code works
Brooklyn building permit FAQs
Can I apply for a Brooklyn permit on paper?
No. The department is paperless and takes applications through Citizenserve, but staff at City Hall will help you through it.
How much is a permit for a new house?
$150 plus 1% of the valuation; a $300,000 house pays $3,150 before trade permits and the state assessment.
Can I get my permit the same day?
No. The city says not to expect any permit on the day it is submitted.
Do contractors need a bond?
No. Registration is $100 with $1,000,000 liability insurance naming the city, plus a state license for electrical, HVAC, plumbing or fire protection work.
Can a homeowner pull permits?
Yes. An owner-occupant doing the work can buy a $35 combination permit for jobs worth up to $5,000.
Do I need a permit for a new roof?
Yes, without drawings; a residential roof is $50. Gutters, painting and flooring need none.
When does the Planning Commission meet?
The first Wednesday of the month at 6 p.m. at City Hall; the Board of Zoning Appeals meets on the third Thursday at 6 p.m.
Brooklyn permit search and official resources
Applicants track their permits and inspections in Citizenserve. Other permit records are public records held by the city; requests follow the city’s public records policy, and the Director of Law serves as public records custodian (216-635-4223). Planning Commission and Board of Zoning Appeals agendas and minutes are on the city’s Diligent Community site, and council minutes on BoardDocs.
Inspections are where schedules slip.
Get a free quote →- Brooklyn Building Department
- Citizenserve portal for Brooklyn
- Permit application and fee schedule
- Building schedule of fees, Section 1345.01
- Permit requirements
- Plan submittal information
- Contractor registration
- Contractors registered to work in the city
- Building and zoning forms
- Planning Commission and Board of Zoning Appeals
- 2023 Planning and Zoning Code
- Building and housing codes
- Public records
- BBS building department look-up
- Ohio Board of Building Standards
Simplify Brooklyn permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Ohio. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Brooklyn sooner?
Let Alliance prepare, file, and track your Brooklyn permits while your crew stays on the job.
More Ohio permitting guides
Cuyahoga County
Read guide →Cleveland
Read guide →Cleveland Heights
Read guide →Brown County Building Permit Guide
Read guide →Brunswick Building Permit Guide
Read guide →Bucyrus Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Brooklyn permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.