Building permits in Bay Village are issued by the city’s Building Department at 350 Dover Center Road (440-899-3400), led by Building Director Eric Tuck-Macalla. The department is certified by the Ohio Board of Building Standards and enforces the state building, residential, mechanical, plumbing and electrical codes, so it handles houses and commercial buildings alike, from plan review to the final inspection. Fees are printed on each application: a new house is $180 plus $0.09 per square foot, plus a 1 percent state fee. Many exterior projects also carry a 10-day “Intent to Build” posting, during which neighbors can file a written complaint before the permit is issued.
What requires a building permit in Bay Village?
Bay Village’s list of work requiring permits covers not only additions, garages, new homes and decks, but also roof shingles, window replacement, water heaters, toilets, sinks, furnaces, air conditioners, driveways, sidewalks, fences and sheds. The list says it is a guide rather than a complete catalog, and asks owners to call the department before starting anything it does not mention.
Permit and inspection
- New homes, room additions, garages and sheds
- Patio decks (post hole, framing and final inspections)
- Roof shingles (ice guard and final inspections) and window replacement
- Furnaces, air conditioners, heat pumps and water heaters
- Bathroom and kitchen fixtures, gas piping and grills
- Driveways, sidewalks, concrete slabs and grade changes
- Fences, swimming pools and hot tubs
No permit
- Painting and wallpapering
- Floor coverings and porch flooring
- Plaster and drywall repairs
- Gutters and downspouts, handrails and railings
- Storm windows and TV antennas
- Landscaping, chimney cleaning and resurfacing kitchen cabinets
The list also marks which projects need a plot plan, working drawings and a job cost, and which need the 10-day posting: additions, new homes, garages, decks, fences, pools, hot tubs, geothermal systems, masonry chimneys and grade changes among them.
What Bay Village decides and what the state holds
The technical rules come from the state codes the department enforces. What the city sets is its own process and land rules: the permit list, the fee amounts printed on its forms, contractor registration under Ordinance 1310, the sequential inspection order in section 1304.03, the Intent to Build posting, shed and accessory-building limits in Chapters 1350 and 1149, lot coverage, and its rental and vacant-building programs. Bay Village is one of the many Cuyahoga County cities that run their own department; the county’s Division of Building Standards, founded in 2025, is not yet issuing permits.
Bay Village building department: who handles permitting
The Building Department reviews plans, issues permits for alterations, repairs and new construction, and sends its own inspectors when a contractor or homeowner schedules an inspection. It also licenses and inspects rental and vacant properties, takes property maintenance complaints, registers contractors, and processes applications for the Architectural Board of Review, the Board of Zoning Appeals and the Planning Commission.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Building Department, 350 Dover Center Road, Bay Village, OH 44140 |
| Phone / fax | 440-899-3400 / 440-871-5751 (city main line 440-871-2200) |
| Hours | Monday to Friday, 8:30 a.m. to 4:30 p.m. (hours in the city’s contact box) |
| Building Director | Eric Tuck-Macalla |
| Certification | Certified by the Ohio Board of Building Standards; enforces the building, residential, mechanical, plumbing and electrical codes |
| Boards | Planning Commission, 1st and 3rd Wednesday; Board of Zoning Appeals, 1st and 3rd Thursday; Architectural Board of Review (non-residential), 2nd Wednesday if needed |
The Architectural Board of Review, set up under Chapter 1128, covers non-residential property only, so a house project normally goes no further than the department and, for a variance, the Board of Zoning Appeals.
Bay Village permit types
Each kind of work has its own paper application on the city’s Applications & Information page: residential and commercial alterations, additions and new construction; residential miscellaneous; electrical; plumbing; HVAC; fence; generator; storm and sewer; street opening and right-of-way; and an irrigation system waiver.
Residential permits
- New homes and additions. File two sets of drawings and two plot plans; new homes need engineered drawings. Include energy code documents, structural plans with beams, floor systems, truss drawings and roof framing, elevations of every side, electrical load calculations, a plumbing isometric, duct sizing and manufacturer specifications.
- Sheds. One utility shed per parcel, no larger than 199 square feet and no taller than 12 feet, on curbing at least 4 inches above grade, 10 feet from the back of the house and 3 feet from any lot line. It needs a permit with a site plan and a drawing or photo, but no 1 percent state fee.
- Accessory buildings and garages. Anything of 200 square feet or more is built to the residential code, with full drawings. Detached garages are capped by the size of the house: 700 square feet for homes under 2,000 square feet, rising to 1,600 square feet for homes of 6,000 or more, and no taller than 18 feet.
- Lakefront lots. Drawings must show the exact line of the coastal erosion area.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
Commercial projects use the commercial alterations, additions and new construction application, which carries the building fees, plan review fees by discipline, and deposits for engineering, right-of-way, sewer lines and tap-in. Exterior work on non-residential property goes to the Architectural Board of Review. A certificate of use and occupancy is issued at the end of the job.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning limits. Accessory buildings may cover no more than 30 percent of the rear yard, and lot coverage may not exceed 40 percent on R-1 and R-3 lots over 5,500 square feet; anything that does not comply needs a variance from the Board of Zoning Appeals.
- Intent to Build posting. For projects that require it, a placard announces that plans are on file. Unless a neighbor files a written complaint with the Building Director within 10 days, claiming the work would substantially injure a neighboring property, the permit is issued if the plans meet the zoning and building codes.
- Planning Commission. Its applications are filed through the Building Department and heard on the first and third Wednesday of the month.
- Digging. Call the Ohio Utilities Protection Service at 811 at least 48 hours before excavating.
Bay Village permit costs and fees
Bay Village prints its fees on the application forms posted in 2026. Residential permits add 1 percent and commercial permits 3 percent for the Board of Building Standards, as the forms state; sheds are exempt from the 1 percent fee.
| Item | Fee |
|---|---|
| New house | $180 plus $0.09 per sq ft; occupancy and use $100 |
| Residential alterations and additions | $60 plus $0.09 per sq ft; occupancy for an addition over 750 sq ft $50 |
| Residential plan review (new homes, and additions over 200 sq ft) | Structural $35; electrical, HVAC, plumbing and fire suppression $25 each |
| Residential electrical | $75 plus $0.05 per sq ft for new work and additions; $30 plus $0.05 for remodels; service, temporary service or generator $75; solar $60 |
| House demolition / sewer, water or storm connection | $100 / $30 per connection |
| Residential deposits and service fees | New house deposit $500; park fee $500; engineering $800; right-of-way $500; tap-in fee $1,500 |
| Commercial new construction / alterations and additions | $250 / $125, each plus $0.10 per sq ft |
| Commercial plan review | Structural $200 plus $0.08 per sq ft; each other discipline $200 plus $0.05 per sq ft |
| Commercial certificate of use and occupancy | $150 |
| Commercial fire alarm or suppression system / hood / elevator | $90 plus $0.20 per device / $100 / $125 plus $30 per floor |
| Contractor registration | $100 per registered trade |
| Rental housing license | $100 a year |
Rather talk it over?
Call 1-855-478-4290 →A worked example from the residential form: a 400-square-foot addition costs $60 plus 400 × $0.09, or $96, plus the 1 percent state fee (96 cents), for $96.96, before the $35 structural plan review and any electrical, HVAC or plumbing permits the addition needs. Commercial tap-in fees are $1,500 for a building under 2,000 square feet plus 25 cents for each square foot above, and $2,250 plus 50 cents a square foot for restaurants. Residential sewer service line deposits are $250, $500 or $1,000 depending on the job.
Trade permits and who may pull them
Bay Village issues permits only to the person who will physically do the work. Under Ordinance 1310 every contractor and subcontractor must be registered with the city before applying, at $100 per registered trade, with a certificate of insurance of at least $100,000 / $300,000 naming the city as certificate holder, a copy of any state license and a RITA registration; a bond and Bureau of Workers’ Compensation certificate are not required. The city posts its lists of registered electrical, general, HVAC and plumbing contractors each month.
- Electrical, plumbing and HVAC. Each has its own application and fee, and subcontractors pull their own permits even when the homeowner holds the building permit.
- Homeowners. An owner who lives in the house and does the work personally may apply on the homeowner permit and plan review form. The city warns that there is no saving in a homeowner taking out a permit for work a contractor will do.
- State licenses. The Ohio Construction Industry Licensing Board licenses electrical, HVAC, hydronics, plumbing and refrigeration contractors for commercial work, and Bay Village asks licensed contractors for a copy.
Rather not deal with the building department?
Get a free quote →How to apply for a Bay Village building permit
Find the project on the “Work Requiring Building Permits” list or call 440-899-3400.
Make sure every contractor is on the city’s registered lists, or register first.
Review setbacks, shed and garage sizes and lot coverage; apply to the Board of Zoning Appeals if a variance is needed.
Two sets of drawings and an accurate plot plan, showing any gas wells and, on the lake, the coastal erosion line.
Use the residential, commercial, homeowner or trade form at 350 Dover Center Road.
Where an Intent to Build placard is required, the permit is issued after 10 days if no written complaint is filed and the plans comply.
Review, corrections and what causes delay
The most common hold-ups are an unregistered subcontractor, a plot plan without setbacks, a garage or shed over the size limits, and the 10-day posting itself. The department notes that construction may not begin until permits are issued. Exterior construction, demolition and excavation may only take place between 8:00 a.m. and 9:00 p.m.
Inspections and certificates in Bay Village
Inspections follow the city’s sequential inspection sheet under section 1304.03, which must be on site and reachable for the inspector, with the address visible from the street. The order runs from the temporary power pole and utility caps through the bottom-of-footer elevation, footers, pre-pour and top-of-wall checks, foundation waterproofing, insulation, drains and anchorage, basement and garage slabs, underground, rough and final plumbing, HVAC, electrical and gas inspections, ice guard, rough framing (only after the rough mechanicals pass), insulation and fire protection, drywall, final grade and the final building and occupancy inspection. Smaller jobs need only the inspections shown for them on the permit list, often just a final.
Bay Village has no point-of-sale inspection for owner-occupied homes. Rental properties are registered and inspected every year, with violations re-inspected before the $100 housing license is issued, and short-term rentals of under 29 days are not allowed. Before a vacant building is sold, its owner must obtain a vacant building inspection and give a copy to the buyer.
Ohio building code in Bay Village
Bay Village’s department enforces the state codes itself. FEMA’s Community Status Book lists the City of Bay Village (community 390093) as participating in the National Flood Insurance Program, with a current flood map dated August 15, 2019, and lakefront applications must show the coastal erosion area.
Ohio has statewide building codes: the Ohio Building Code for commercial and other nonresidential buildings and the Residential Code of Ohio for detached one-, two- and three-family dwellings. Only departments certified by the Ohio Board of Building Standards may approve plans and inspect, and residential rules are uniform statewide. How Ohio’s statewide code works
Want this handled start to finish?
Get a free quote →Bay Village permit search and official resources
Permit and plan records are kept by the Building Department at 350 Dover Center Road; plans for projects under an Intent to Build posting can be inspected there during the 10-day period. The department also publishes a residential guide to the city’s sanitary and storm sewers, which explains how a house connects to them and the common causes of basement flooding. For permits elsewhere in Cuyahoga County, the Cuyahoga County building permit guide explains how certification decides which municipal department issues them.
- Bay Village Building Department
- Applications and information
- Work requiring building permits
- Residential alterations, additions and new construction application
- Commercial alterations, additions and new construction application
- Electrical permit application
- Homeowner permit and plan review application
- Sheds and accessory structures (2026)
- Sequential inspections sheet
- Residential guide to sanitary and storm sewers
- Contractor registration application
- Registered contractor lists
- Building Department FAQs
- Ohio Board of Building Standards
Inspections are where schedules slip.
Get a free quote →Bay Village building permit FAQs
Who issues building permits in Bay Village?
The city’s own Building Department at 350 Dover Center Road (440-899-3400), which is certified by the Ohio Board of Building Standards and enforces both the residential and the commercial codes; Cuyahoga County does not issue them.
Do I need a permit to replace my roof or windows?
Yes. Roof shingles need a permit with ice guard and final inspections, and window replacement needs a permit and a final inspection.
How big can a shed be without counting as an accessory building?
Up to 199 square feet and 12 feet tall, one per lot. At 200 square feet or more it is an accessory building built to the residential code.
What is an Intent to Build placard?
Public notice that plans are on file. Neighbors have 10 days to file a written complaint with the Building Director before the permit is issued.
Can I pull my own permit?
Yes, if you own and live in the house and do the work yourself; subcontractors must be registered and pull their own permits.
How much does a new house permit cost?
$180 plus $0.09 per square foot, plus 1 percent, $100 for occupancy, plan review fees and deposits.
Does Bay Village require a point-of-sale inspection?
No, not for owner-occupied homes; vacant buildings need an inspection before sale.
Simplify Bay Village permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Ohio. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Bay Village sooner?
Let Alliance prepare, file, and track your Bay Village permits while your crew stays on the job.
More Ohio permitting guides
Cuyahoga County
Read guide →Beachwood
Read guide →Bedford
Read guide →Bedford Heights Building Permit Guide
Read guide →Belmont County Building Permit Guide
Read guide →Berea Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Bay Village permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.