Fairview Park, Ohio Building Permit Guide

To get a building permit in Fairview Park, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Fairview Park’s Building Department at City Hall, 20777 Lorain Road, issues building, electrical, plumbing and HVAC permits in the city and posts new construction and accessory structure applications for 10 days before approval.

Authority: Fairview Park Building DepartmentFees: Schedule dated August 8, 2019Phone: 440-356-4405
Authority
Building Department20777 Lorain Road
Posting
10 calendar daysNew work and yard structures
Contractors
$110 a yearRegistration before any permit
Population
16,748Census 2025 estimate

In the City of Fairview Park, permits come from the Building Department at City Hall, 20777 Lorain Road (440-356-4405), led by Building Commissioner Walter Maynard. Electrical, plumbing and heating work each need their own permit, and new construction, structural alterations and accessory or yard structures are posted for 10 days before the permit issues. Every contractor must register first ($110 a year), and fees follow the department’s schedule dated August 8, 2019: a house addition, for example, starts at a $100 base fee.

What requires a building permit in Fairview Park?

Under Chapter 1307 of the Codified Ordinances, a permit is needed before excavation, grading, construction, alteration, repair, moving or demolition of a house, commercial building or accessory structure begins, and electrical, plumbing and heating and air conditioning work each need a separate permit. The department’s residential handout lists the miscellaneous permits it issues: windows, siding and trim, roofing, decks, sheds, fences, water tanks, pools, remodeling, sprinkler systems, paving, sidewalks, fireplaces, furnaces, air conditioners and recreational vehicle storage.

Posted for 10 days

  • New houses and other new construction
  • Structural alterations and additions
  • Garages, sheds and other accessory structures
  • Yard structures

Outside the posting categories

  • Roofing, siding and windows
  • Non-structural kitchen and bath remodels
  • Furnaces, air conditioners and water heaters
  • Electrical and plumbing work
  • Waterproofing and sewer repairs

The department says certain common household projects need no permit and asks owners to call when unsure. Ohio’s codes leave some minor work out of the permit rule in Section 102.10, such as a one-story detached shed of up to 200 square feet at a house, but Fairview Park still charges a $25 zoning permit for sheds and $35 for a residential fence, so small yard projects still go through the department. Roofs may carry at most two layers before a full tear-off.

What Fairview Park decides and what the state holds

Ohio sets the building, residential and trade codes, and the department says its inspectors are licensed State of Ohio residential and commercial inspectors. The city decides its own fees, the 10-day posting rule, contractor registration (Chapter 1305), zoning, sign and design review, exterior property maintenance (Chapters 1343 and 1345) and rental registration. Its residential handout adds local construction details: a detached garage of 600 square feet or less may sit on a 4-inch curb, 4-inch pad and 12-inch ratwall, while a larger one needs footings below the 38-inch frost line.

Short on time to read all of this?

Get a free quote →

Fairview Park building department: who handles permitting

The Building Department enforces the building, exterior property maintenance and zoning codes for every building in the city. It issues plan approvals and permits, keeps housing records, registers contractors, inspects work and issues occupancy permits for new structures, new businesses, relocations and changes of tenancy. Cuyahoga County’s Division of Building Standards has not announced partner communities, and the state’s building department look-up confirms the department for an address.

Fairview Park permit contacts
DetailInformation
OfficeBuilding Department, Fairview Park City Hall, 20777 Lorain Road, Fairview Park, OH 44126
Phone / fax440-356-4405 / 440-356-4404 (City Hall 440-333-2200)
Building CommissionerWalter Maynard, 440-356-4406
BoardsPlanning and Design Commission questions 440-356-4407; variance questions 440-356-4406
FilingPaper applications in person or by mail with a self-addressed stamped envelope

Fairview Park permit types

The department posts separate applications for residential work that requires the 10-day posting and work that does not, plus non-residential, electric, plumbing, HVAC, fence, shed, sign, recreational vehicle and occupancy forms. The residential application asks for the job address, type of work (new construction, alteration, addition, repair or fire damage), a description with square footage, the estimated cost and the registered contractor.

Residential permits

  • New houses, additions and structural work need two sets of construction drawings and a site plan showing the size and location of new and existing structures and their distances from every lot line, prepared to show compliance with the Residential Code of Ohio.
  • Garages follow the department’s garage regulations sheet; detached garages over 600 square feet need frost-depth footings.
  • Pools include the electrical permit in the pool fee; an in-ground pool adds a $500 grade deposit.
  • Waterproofing requires clean-outs on each wall worked on, washed limestone or river rock backfill to within 18 inches of grade, and a filter membrane inspected before soil goes back.
  • Recreational vehicles such as boats and campers may be kept only in a back yard, with a $50 permit, and not permanently in a driveway; owners get up to five 48-hour loading periods a year with the Building Commissioner’s approval, or 12 hours in total without it (Section 1117.07).

Commercial permits

Non-residential work uses its own application and is charged a square-foot plan exam fee plus an architect review fee of $93.41 plus $3.43 per 100 square feet and 3%; new fire protection review is $93.41 plus $2.86 per 100 square feet of sprinkler coverage and 3%, and resubmittals cost half the original fee. New businesses, relocations and changes of tenancy need an occupancy permit. Signs need Planning and Design Commission approval before the Building Department issues the permit.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Planning and Design Commission. It reviews the design, location and alteration of buildings, looking at materials, colors, details, mechanical equipment, drives and parking, landscaping, lighting and signs. It meets at 7:00 p.m. on the third Wednesday (no August meeting), hears at most seven cases and takes filings until noon on the deadline; filings for the December 16, 2026 meeting close at noon on November 25, 2026. The fee is $110.
  • Board of Zoning and Building Appeals. Variances from the zoning code and appeals of the Building Commissioner’s decisions go here; it meets at 7:00 p.m. on the second Tuesday (no August meeting), with a $75 fee and a noon filing deadline about three weeks ahead. A variance lapses if no substantial construction is done within one year (Section 1153.07).
  • Grading and sewers. Grade approval carries a $150 fee and a $500 deposit, the sanitary sewer readiness-to-serve charge is $750 for a single-family home, and commercial projects pay a $300 City Engineer sewer evaluation deposit. Sites with storm water best management practices sign the city’s inspection and maintenance agreement for them.

Fairview Park permit costs and fees

The Building Department’s fee schedule for plan approval and permits is dated August 8, 2019, and is the schedule posted on its page; it names no ordinance number, so confirm it is current when you call. Fees are paid before work starts.

Fairview Park fee schedule (dated August 8, 2019)
WorkFee
Building permit: new construction, additions, remodeling, alterations or repairs$100 base plus the greater of $10 per 100 sq ft of floor area or $4 per $1,000 of valuation
Plan examination: one- and two-family house / up to 3 units$175 / $300
Plan examination: residential additions, remodeling, repair$10 per 100 sq ft
Kitchen or bath remodel / other RCO items (decks, roofs, siding, windows)$25 / $40
Electrical, residential$100 base plus $3 per lighting or receptacle outlet
Plumbing$100 base plus $3 per fixture or opening; water heater replacement $25
HVAC, residential$100 base (ductwork); $75 per heating unit, replacement or conversion; $50 per A/C unit
Fence (residential / non-residential) / shed zoning permit$35 / $75 / $25
Above-ground pool / in-ground pool$75 / $150 plus a $500 grade deposit, electrical included
Concrete: new / replacement$50 / $25
Demolition of a house / accessory building$100 / $25
Re-inspection: residential / non-residential$35 / $50

Rather talk it over?

Call 1-855-478-4290 →

A state assessment is added: 1% on residential plan approval, except fences of 6 feet or less, cabinets, sheds, private walks, driveways, patios and small low decks, and 3% on non-residential work. Worked example from the schedule: a new 2,000-square-foot house valued at $300,000 pays the $100 base plus $1,200 (the $4 per $1,000 valuation figure, which beats $200 by floor area), or $1,300, and $175 for plan examination, $1,475 before trade permits and the state assessment.

Trade permits and who may pull them

Fairview Park issues electrical, plumbing and heating and air conditioning permits itself, and permits are taken out by the person doing the work. Under Chapter 1305 every contractor working in the city registers with the Building Department, and the Building Commissioner must approve the registration before any permit is issued. The department’s handout spells out how wide this is: general and sub-contractors, painters, building movers, landscapers, tree workers, plasterers, masons, roofers, pavers, plumbers, electricians and heating contractors all register.

  • Registration. $110, valid for one year from issue for new and renewing contractors, with a certificate of insurance ($300,000/$500,000 liability and $100,000 property damage) naming the city as additional insured, the R.I.T.A. tax form and a copy of the state license for electrical, HVAC, plumbing, hydronics or refrigeration work. No bond is required, and the registration is mailed back only if you send a self-addressed stamped envelope.
  • Homeowners. An owner doing the work personally signs the Homeowner’s Affidavit, accepts the same inspection schedule as a contractor and must correct failed work. Anyone hired for pay must be registered and licensed and pull their own permit, and the owner cannot obtain a permit for an unregistered contractor.
  • Fire protection. Fire alarms, hood suppression and sprinkler systems have their own plan review and permit fees.

Rather not deal with the building department?

Get a free quote →

How to apply for a Fairview Park building permit

1. Call about the project

Ask the Building Department which application fits and whether the work needs posting, design review or a variance.

2. Register the contractor

File the contractor registration packet, or sign the Homeowner’s Affidavit if you will do the work yourself.

3. Clear the boards

Take sign and design matters to the Planning and Design Commission and variances to the Board of Zoning and Building Appeals by their noon deadlines.

4. Submit drawings

File the residential or non-residential application with two sets of construction drawings and a site plan, in person or by mail with a stamped return envelope.

5. Wait out the posting

Applications for new construction, structural alterations and accessory structures are posted for 10 calendar days before approval.

6. Pay and build

Pay all fees before starting, then call for each inspection the day before.

Review, corrections and what causes delay

The 10-day posting is built into every new construction or yard structure permit, so allow for it. An unregistered contractor cannot receive a permit, and board cases wait for monthly meetings that take at most seven cases and skip August. Commercial resubmittals cost half the original review fee. Under the state code, approved plans lapse if work has not started within twelve months.

Inspections and certificates in Fairview Park

Give the department notice the day before each inspection, and call before covering any work. The residential handout lists the required inspections: lot line markers, footing or foundation, concrete slab or under-floor, framing, lath or gypsum board where it is part of a fabricated or shear assembly, energy efficiency, fire-resistant penetrations and testing of the building service equipment. Waterproofing jobs add an inspection of the filter membrane before backfill. Re-inspections cost $35 for residential and $50 for non-residential work.

Occupancy permits are issued for new structures, new businesses, relocations and changes of tenancy. Rental dwellings are registered with the department ($100), with a separate 2026–2027 rental application and inspection checklist, and an apartment license is $150 plus $8 per dwelling unit.

Ohio building code in Fairview Park

Fairview Park enforces the statewide codes through its own Building Department under Chapter 1307 of its Codified Ordinances. FEMA’s Community Status Book lists Fairview Park (community 390108) as participating in the National Flood Insurance Program, with a flood map dated December 3, 2010 on which no base flood elevations were determined.

Want this handled start to finish?

Get a free quote →

Ohio has statewide building codes: the Ohio Building Code for commercial and other nonresidential buildings and the Residential Code of Ohio for detached one-, two- and three-family dwellings. Only departments certified by the Ohio Board of Building Standards may approve plans and inspect, and residential rules are uniform statewide. How Ohio’s statewide code works

Fairview Park permit search and official resources

There is no online permit search. The Building Department maintains the city’s housing records, so ask it in writing or at the counter for the permit history of a property; a list of registered contractors is also available from the department by phone. Board agendas and minutes are posted in the city’s agenda center.

Inspections are where schedules slip.

Get a free quote →

Fairview Park building permit FAQs

Why do some Fairview Park permits take at least 10 days?

Applications for new construction, structural alterations and accessory or yard structures are posted for 10 calendar days before the plan approval issues.

How much is a building permit for an addition?

$100 plus the greater of $10 per 100 square feet or $4 per $1,000 of value, with a residential plan exam of $10 per 100 square feet and the 1% state assessment.

Do I need a permit for a fence or shed?

Yes. A residential fence is $35 and a shed needs a $25 zoning permit; sheds are also among the accessory structures posted for 10 days.

Can I do the work myself?

Yes, with a signed Homeowner’s Affidavit. Anyone you pay to help must be registered with the city and pull their own permit.

What do contractors need to register?

The registration packet, $110, insurance naming the city, the R.I.T.A. form and a state license for licensed trades; no bond is needed.

When does the Board of Zoning and Building Appeals meet?

At 7:00 p.m. on the second Tuesday of each month except August. Filings close at noon on the posted deadline, and the fee is $75.

How long is a variance good for?

One year: under Section 1153.07 it lapses if no substantial construction has been done by then.

Simplify Fairview Park permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Ohio. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Fairview Park sooner?

Let Alliance prepare, file, and track your Fairview Park permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Fairview Park permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.