In the City of Amherst, the Building Department at 480 Park Avenue, Upper Level (440-988-3734), reviews all residential and commercial building plans and issues building, electrical, plumbing and HVAC permits; David Macartney is the Building Official. The city says it enforces the state building codes for all construction in the city under Part Thirteen of its codified ordinances. Applications, inspections and contractor licensing run through the city’s GovWell portal or the counter, and every contractor and subcontractor needs a $100 city license that expires each December 31.
What requires a building permit in Amherst?
Amherst’s standard guidelines spell out several permits plainly. A permit is needed to build, install or renovate any accessory structure, including sheds, gazebos, pergolas and greenhouses; to build or install any fence; for any deck, porch or enclosure; for any swimming pool or hot tub, above ground or in ground; and for any addition, garage or concrete flatwork, which covers driveways, patios and sidewalks. Replacing a public sidewalk also needs a permit, issued at no cost.
Permit required
- New houses, additions and attached or detached garages
- Sheds, gazebos, pergolas and greenhouses of any size
- Every fence, including decorative and permanent fencing
- Decks, porches and enclosures, and ADA ramps (zero-cost permit)
- Pools and hot tubs
- Concrete flatwork and public sidewalk replacement
- Electrical, plumbing, HVAC, sprinkler and fire alarm work
Other city approvals
- Planning Commission for lot splits and commercial development
- Board of Zoning Appeals for variances
- Design Review Board certificate in the Downtown Historical District
- Occupancy permit for a new or relocating business
Temporary fencing such as snow or roll-wire fencing may stand for up to four months for construction or snow control. The Ohio codes’ own exemptions still apply, but because the city’s guidelines name fences, small sheds and flatwork, check with the department before assuming any exterior project is exempt.
What Amherst decides and what the state holds
The construction standards are the state’s, and the city page says updates take effect as the Board of Building Standards approves them. Amherst decides its zoning setbacks, accessory building limits, contractor licensing, design review in the historic district and the right-of-way rules for driveways and sidewalks. On November 9, 2026 Council voted 7-0 to adopt a temporary moratorium on building data centers in the city until June 30, 2027, with an automatic six-month extension; an amendment defined construction as the erection, enlargement or alteration of such facilities.
Short on time to read all of this?
Get a free quote →Amherst building department: who handles permitting
The Building Department handles every construction permit in the city. Besides permits and plan review, it registers contractors, investigates property maintenance and zoning complaints, reviews development plans, issues occupancy permits for new businesses, and takes applications for the Planning Commission, Board of Zoning Appeals and Design Review Board. The Building Official performs residential and commercial building and mechanical inspections during office hours, and separate electrical and plumbing inspectors work after hours.
| Detail | Information |
|---|---|
| Office | Building Department, 480 Park Avenue, Upper Level, Amherst, OH 44001 |
| Phone / fax | 440-988-3734 / 440-988-3764 |
| Hours | Monday to Friday, 8:00 a.m. to 4:00 p.m., closed on government holidays |
| Building Official | David Macartney (building and mechanical inspections) |
| Trade inspections | Electrical and plumbing: Monday, Tuesday and Thursday after 4:30 p.m. |
| Online | GovWell: permits, inspections, contractor registration and code complaints |
| Boards | Council Chambers, 206 South Main Street |
The Board of Building Standards’ look-up maps which certified department holds authority over an address; within Amherst’s limits the city department handles the work its page describes.
Amherst permit types
The department uses two plan approval forms, one residential and one non-residential, each covering building, plumbing, HVAC, sprinkler, electrical and fire alarm scope and new construction, additions, alterations and repairs; the commercial form adds change of occupancy. Both list the estimated cost and the square or lineal footage, and both require a full list of contractors and subcontractors.
Residential permits
- Drawings. Two sets of construction documents: dimensioned floor plans and elevations, wall sections, a plumbing layout or isometric with drain, waste and vent sizes, HVAC heat-loss calculations and duct layout, electrical layout, a description of the building envelope, and a site plan with topography.
- Accessory buildings. Up to three are allowed in residential districts, of no more than 576, 168 and 64 square feet, at most 16 feet tall, at least 5 feet from side and rear lines and never in the front yard. The setback may be halved only for a house over five years old with written consent from the neighbors.
- Fences may be up to 6 feet high, at least 4 inches inside the property line unless the neighbor agrees in writing, with the finished side out, no fencing in the front yard and a gate for access to meters and utility easements.
- Decks, porches, additions and garages sit at least 8 feet from side lines and 25 feet from the rear line, and in a front yard no closer than the average setback on the street (or 35 feet from the right-of-way).
- Pools and hot tubs need a 48-inch barrier, in place once the water reaches 18 inches, at least 5 feet from side and rear lines, and a grade plan when not installed on grade.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Not sure this scope needs a permit?
Get a free quote →Commercial permits
Non-residential plan approval covers new buildings, additions, alterations and changes of occupancy. A business opening or relocating in the city needs a commercial occupancy permit through the new business package, and temporary signs use their own application. Site design should allow for the fire department’s apparatus; the city posts the size specifications of its Engine 59 and Tower 50, along with its standard construction drawings.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Planning Commission. Lot splits, traffic impact for new commercial development or additions, and subdivisions; changes in an I-1 district go to Council’s Industrial Review Committee. File plans and the fee 28 days before the last-Wednesday meeting at 6:00 p.m.
- Board of Zoning Appeals. Appeals of the Building Inspector’s zoning decisions and variances; file 14 days before the last-Wednesday meeting at 6:30 p.m. The request is published in The Morning Journal.
- Design Review Board. Commercial buildings in the Downtown Historical District need a Certificate of Appropriateness, which does not replace the building permit. Submit a complete package at least ten days ahead.
- Easements and flood areas. Decks, porches, additions, garages, pools and hot tubs are not permitted in an easement or flood plain zone, and a permit does not override deed restrictions or earlier board conditions.
Amherst permit costs and fees
Amherst’s Fees and Applications page posts the residential and non-residential application forms, but no building permit fee table; the amounts are set in the codified ordinances, which the city hosts on American Legal. Ask the Building Department for the fee on your project before you file. The fees the city does publish are below.
| Item | Fee |
|---|---|
| Contractor license (per individual license, per calendar year) | $100 |
| Planning Commission: commercial building or lot split | $200 |
| Planning Commission: all other categories | $100 |
| Board of Zoning Appeals | $35 residential; $100 commercial |
| Design Review Board application | $20, non-refundable |
| ADA ramp permit / public sidewalk replacement permit | No charge |
| Card payment / ACH payment | 2.79% service fee / $1.00 per transaction |
| Work without a required license or permit | Up to double the required fees (Chapter 1337.04) |
Rather talk it over?
Call 1-855-478-4290 →A Board of Building Standards assessment of 1% on residential and 3% on nonresidential fees is added to local permit fees. Payments can be made in person by cash, check or card (Visa, Mastercard and Discover), by mailed check, or online with card or bank transfer once the department has given you an application approval number. Applications and payments received after 3:30 p.m. are processed the next business day, and nothing is processed on the day it is submitted.
Trade permits and who may pull them
Electrical, plumbing and HVAC permits are issued by the same department, and the plan approval forms carry boxes for each trade, plus sprinklers and fire alarms. Electrical and plumbing inspections are done on Monday, Tuesday and Thursday after 4:30 p.m.; HVAC is inspected with the building work during the day.
- City license for everyone. All contractors and subcontractors working in Amherst must hold a current city contractor license on file before starting work. It costs $100 per license, runs for the calendar year and expires on December 31 whatever the issue date.
- What to submit. A completed license application, a certificate of general liability insurance of at least $100,000 naming the City of Amherst as additionally insured, and a current W-9.
- General contractors. A first-time general contractor license requires a copy of a current general contractor license from another city.
- Licensed trades. Electrical, HVAC and refrigeration, plumbing and fire protection contractors submit their license from the Ohio Construction Industry Licensing Board or the State Fire Marshal.
- Income tax. Non-resident employers working in the city for more than 20 days must withhold 1.5% of employees’ wages from day 21, and file a net profit return.
The city’s pages do not describe a homeowner exemption from licensing, so an owner planning to do their own work should ask the department before applying.
Rather not deal with the building department?
Get a free quote →How to apply for an Amherst building permit
Accessory buildings, fences, decks, pools, additions and flatwork each have a setback and size sheet.
Lot splits and commercial development go to the Planning Commission; downtown commercial buildings need a Design Review Board certificate.
Each contractor and subcontractor needs a current city license before work begins.
Use the residential or non-residential form and list every contractor on page two.
File through GovWell or at 480 Park Avenue with the plans, site plan and topography.
Use the application approval number to pay online, or pay at the counter or by mailed check.
Review, corrections and what causes delay
Licensing and permits are never processed the same day, and anything received after 3:30 p.m. waits until the next business day. A missing contractor license, an incomplete contractor list, or a project that breaks the setback, height or yard rules (sending it to the Board of Zoning Appeals and a newspaper notice) can each hold up a permit. Design review and Planning Commission deadlines run 10 to 28 days before monthly meetings, so build them into the schedule.
Inspections and certificates in Amherst
Every inspection needs at least 24 hours’ notice. Building and mechanical inspections happen Monday to Friday between 8:00 a.m. and 4:00 p.m., while electrical and plumbing inspections take place after 4:30 p.m. on Monday, Tuesday and Thursday. Requests can be made through GovWell or by calling 440-988-3734.
Some guidelines name specific inspections: a pre-pour inspection before concrete is placed for a city sidewalk, inspections of ADA ramps, and a check after pool installation that the grade shots taken around the pool and along each property line are still within tolerance so drainage does not affect neighbors. Public sidewalks must be at least 3 1/2 inches thick, or 5 1/2 inches where they cross a driveway, and right-of-way driveway sections 6 inches under Chapter 1347. Permits for accessory buildings, fences, decks, pools and additions are valid for 12 months from issue, and a new or relocating business must receive its occupancy permit before opening.
Ohio building code in Amherst
Amherst enforces the state codes through its own Building Department, and its guidelines still quote some older code sections for decks, flatwork and pool wiring. FEMA’s Community Status Book lists the City of Amherst (community 390347) as participating in the National Flood Insurance Program, with a current flood map dated March 9, 2021.
Ohio has statewide building codes: the Ohio Building Code for commercial and other nonresidential buildings and the Residential Code of Ohio for detached one-, two- and three-family dwellings. Only departments certified by the Ohio Board of Building Standards may approve plans and inspect, and residential rules are uniform statewide. How Ohio’s statewide code works
Want this handled start to finish?
Get a free quote →Amherst permit search and official resources
Permit and inspection records for an Amherst address are held by the Building Department; ask at 480 Park Avenue or call 440-988-3734, and applicants can follow their own applications in GovWell. Council and committee agendas, minutes and video, including the data center moratorium, are posted on the city’s council page.
- Amherst Building Department
- Fees and applications
- GovWell permits, inspections and contractor registration
- Residential plan approval application
- Non-residential plan approval application
- Contractor registration package
- Building codes adopted by the city
- Accessory structure guidelines
- Fence guidelines
- Decks, porches and enclosures guidelines
- Pool and hot tub guidelines
- Additions, garages and concrete flatwork guidelines
- Sidewalk information
- Design Review Board
- Planning Commission
- Board of Zoning Appeals
- Technical documents and standard drawings
- Council minutes, November 9, 2026
- Ohio Board of Building Standards building department look-up
- FEMA Community Status Book, Ohio
Inspections are where schedules slip.
Get a free quote →Amherst building permit FAQs
Do I need a permit for a fence in Amherst?
Yes. Any fence needs a permit and a site plan; fences may be up to 6 feet high and are not allowed in the front yard.
Do I need a permit for a shed?
Yes, any accessory structure needs one. You may have up to three, the largest no more than 576 square feet, at least 5 feet from side and rear lines.
How much is a contractor license?
$100 per license per calendar year, expiring December 31, with $100,000 of liability insurance and a W-9.
When are electrical and plumbing inspections done?
On Monday, Tuesday and Thursday after 4:30 p.m., booked with at least 24 hours’ notice.
Does replacing a city sidewalk need a permit?
Yes, a no-cost permit and a pre-pour inspection before the concrete is placed.
Where are building permit fees listed?
The department does not post a building permit fee table online, so call 440-988-3734 for the fee on your project.
Is there a data center moratorium in Amherst?
Yes. Council adopted one on November 9, 2026, running until June 30, 2027 with an automatic six-month extension.
Simplify Amherst permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Ohio. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Amherst sooner?
Let Alliance prepare, file, and track your Amherst permits while your crew stays on the job.
More Ohio permitting guides
Lorain County
Read guide →Avon
Read guide →Avon Lake
Read guide →Ashland Building Permit Guide
Read guide →Ashland County Building Permit Guide
Read guide →Ashtabula County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Amherst permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.