Rolette County, North Dakota Building Permit Guide

In the townships covered by the Rolette County Zoning Resolution, you need a zoning certificate from the zoning inspector for your zone before you build, alter or change the use of a building; the City of Rolla permits inside its limits.

Authority: Rolette County zoning inspectors (Planning Commission)Code: Rolette County Zoning Resolution, 2001 as amendedPhone: 701-477-5665 (County Auditor)
Zoning certificate
Up to $25Issued within 10 days of a complete application
Hearing items
$50Variance, conditional use or rezoning
Septic
Rolette County Public Health District701-477-5646

Rolette County’s building approvals come from its Zoning Resolution. In the 23 townships its Zoning Resolution covers, you apply to the zoning inspector for your zone for a zoning certificate before building, altering or changing the use of any building; the inspector’s fee is capped at $25, and a certificate must be issued within 10 days if the plans comply. Applications that need a public hearing cost $50, and the City of Rolla runs its own building permits.

When do you need a zoning certificate in Rolette County?

Certificate required

  • Building a new structure, including an accessory building
  • Altering a building
  • Changing the use of a building or premises
  • Excavating for dirt, sand or gravel

No certificate

  • Buildings and improvements serving an agricultural use of the land

To count as agriculture under the resolution, a property needs at least 10 acres and the owner must earn at least 50% of his income from farming. Gravel and sand pits opened under a certificate must be filled within six months of the removal, except established gravel pits, which must be filled before they are abandoned.

Who issues permits in Rolette County?

The county board adopted its Zoning Resolution on December 27, 2001 for the unincorporated areas and split them into five zones. The resolution creates a zoning inspector for each zone, appointed by the County Planning Commission, who keeps the records and issues zoning certificates. Variances, conditional uses and rezonings go to a public hearing: the Planning Commission makes a recommendation and the county commission decides. The Auditor’s office in the Rolla courthouse holds the zoning maps.

Short on time to read all of this?

Get a free quote →
Townships in the county’s five zoning zones
ZoneTownships
1Willow Lake, Holmes, Gilbert, Hillside and Currie (International Peace Garden property excluded)
2Hutchinson, Baxter and Fairview
3Mt. Pleasant, Oxford, Union, Ellsworth, Island Lake and Pleasant Valley
4Russell, plus the organized townships of Shell Valley and Maryville
5Wolf Creek, Finnegan, Rice and Leonard, plus the organized townships of Kohlmeier and South Valley
Rolette County contacts
DetailInformation
County Auditor102 2nd St NE, PO Box 939, Rolla, ND 58367; 701-477-5665
Septic systemsRolette County Public Health District, 114 3rd St NE, Rolla; 701-477-5646
City of RollaAuditor’s office, 14 1st St SE, Rolla; 701-477-3610

Cities: Rolla (pop. 1,156) issues its own building permits for the city and its half-mile extraterritorial area. For Dunseith (pop. 606), Rolette (pop. 462), St. John (pop. 310) and Mylo (pop. 19), the published sources do not say who permits building; ask city hall before you start.

Applications the county handles

  • Zoning certificate: for new buildings, alterations, changes of use and gravel or dirt excavation. The application gives the exact location and a plot plan with the building’s position, dimensions, height and use.
  • Variance: relief from a yard, setback or similar rule. The Planning Commission advertises a hearing in the official county newspaper at least 10 days ahead.
  • Conditional use permit: for uses the district allows only with approval. Since 2002, animal feeding operations of 1,000 animal units or more need one, and since 2005 so does any tower over 50 feet.
  • Zone change: amendments recorded since 2003 have moved lake lots near Lake Upsilon and other parcels from agricultural to residential, recreational or business zoning.
  • Certificate of compliance: needed before a newly built or structurally altered building, or the land, is occupied.

Not sure this scope needs a permit?

Get a free quote →

Rolette County fees

Fees in the Rolette County Zoning Resolution
ItemFee
Zoning certificateUp to $25, paid to the zoning inspector
Variance, conditional use permit, amendment or any other item needing an advertised public hearing$50 at filing

City of Rolla permits have a separate schedule, shown in the local details below.

Trades and septic systems

The county zoning certificate covers location and use only. Electrical and plumbing work in rural Rolette County is permitted and inspected through the North Dakota State Electrical Board and State Plumbing Board. Septic systems are regulated by the Rolette County Public Health District under its Onsite Sewer Regulations; the district contracts its environmental health services to the Lake Region District Health Unit, which keeps the list of licensed sewer contractors (701-662-7035).

Setbacks and lot rules to plan around

  • No building within 70 feet of a road’s right-of-way line; where no right-of-way is set, that line is taken as 100 feet from the road center, so the building must stand at least 170 feet from the center of the road.
  • A single-family home needs a tract of at least 130,000 sq ft (about 3 acres) and a two-family home at least 200,000 sq ft; such a tract may not be subdivided, and multiple-family dwellings are not allowed (Section 12). The lakeshore and recreational-district rules below set their own lot sizes.
  • At least 10 feet of open side yard on each side of a dwelling, and of any building in a residential district.
  • Detached accessory buildings at least 20 feet from any dwelling; one standing 20 feet or more behind the main building may be 5 feet from a side lot line, except on a corner lot.
  • Dwelling lots need at least 50 feet of frontage on a public road.
  • In the recreational district, lots of at least 12,000 sq ft where a shared sewer serves them, or 1 acre with an onsite drain field, with 30-foot front and 15-foot side and rear setbacks.

Rather talk it over?

Call 1-855-478-4290 →

How to get a Rolette County zoning certificate

1. Find your township and zone

Check the table above. Inside a city or in a township not listed, ask city hall or the Auditor’s office which rules apply.

2. Check the setbacks

Measure the site against the road, side-yard and lakeshore rules before you draw the plot plan.

3. Plan the septic system

Contact the Rolette County Public Health District; near a lake the zoning board must also approve the sewage plan.

4. Apply to the zone’s inspector

Give the exact location and a plot plan with dimensions, height and use, and pay the fee of up to $25.

5. Build after the certificate

The inspector issues it within 10 days if the plan complies; anything needing a variance or conditional use goes to a $50 hearing first.

6. Ask for the certificate of compliance

Report completion so the Planning Commission can inspect before you move in.

Final inspection and certificate of compliance

When work that needed a permit is finished, the Planning Commission inspects the site. If the work matches the zoning rules it issues a certificate of compliance, and nobody may occupy the building or land until it does. A refusal must be explained in writing within 15 days of the request.

Rather not deal with the Rolette County building department?

Get a free quote →

Lakeshore rules and the City of Rolla

Lakes and streams: shore land means all land within 1,000 feet of a lake or 300 feet of a permanent stream. New lakeshore lots must be at least 100 feet wide along the shore and 20,000 sq ft, and buildings must stand at least 50 feet back from the normal high water line (piers, hoists, unenclosed decks and outbuildings up to 600 sq ft excepted). Within 1,000 feet of a lake, a dwelling or new sewer system is approved only if its wastewater system keeps effluent out of the lake (a drain more than 100 feet from the water, built to federal and state health standards, counts as complying), and the zoning board has full discretion over sewage plans for new development.

Rolla building permits: the city’s permit covers the city and a half-mile extraterritorial area. Arrange an inspection by the city building inspector before you submit; residential requests up to 2,500 sq ft can be approved by the inspector and the city auditor, and larger requests go to the council meeting on the third Wednesday of the month. Attach plans showing the building’s position and distances to the lot lines, the deed and a tax statement. Residential permits cost $30 up to $5,000 of value, $60 from $5,001 to $25,000, and above that $60 plus a square-foot charge; commercial permits start at $120. Work in the extraterritorial area is a flat $50, demolition is $30 residential or $120 commercial, and fees double if you build without a permit. A permit is valid for one year. Rolla’s floodplain ordinance (Ordinance 504, listed by the city as March 16, 2026) also requires a development permit from the city auditor before construction or manufactured home placement.

North Dakota building code

North Dakota has one State Building Code, but enforcing it is a local choice: where no city, township or county enforces it, there is no building code permit for private work, though a zoning permit may still apply. North Dakota rules

Want this handled start to finish?

Get a free quote →

Official resources for Rolette County

These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.

Rolette County permit FAQs

Does Rolette County issue building permits?

Its permit is the zoning certificate. In the townships covered by the Zoning Resolution, the inspector for your zone (the resolution’s cover sheet calls them county building inspectors) issues one before you build, alter or change the use of a building.

How much does a Rolette County zoning certificate cost?

The resolution caps the inspector’s fee at $25. A variance, conditional use or rezoning that needs a public hearing costs $50.

Inspections are where schedules slip.

Get a free quote →

Do farm buildings need a zoning certificate?

No, buildings serving an agricultural use need none. The resolution defines agriculture as at least 10 acres with the owner earning at least half his income from it.

How far from the road must I build?

At least 70 feet from the road’s right-of-way line. Where no right-of-way is established, that line is taken to be 100 feet from the road center, so the building must stand at least 170 feet from the center of the road.

Who handles septic permits in Rolette County?

The Rolette County Public Health District (701-477-5646), whose environmental health work is done under contract by the Lake Region District Health Unit.

How much is a building permit in Rolla?

For a home, $30 up to $5,000 of value and $60 from $5,001 to $25,000, with a square-foot charge added above that; commercial permits start at $120.

Simplify Rolette County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in North Dakota. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Rolette County sooner?

Let Alliance prepare, file, and track your Rolette County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Rolette County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.