Town of Smithfield Planning & Zoning comes first. A $25 Town zoning permit is needed for most residential work, then Johnston County Building Inspections issues the building permit and inspects under contract with the Town. A new house costs $600 for the first 1,200 sq ft plus $0.30 per extra sq ft, with electrical, plumbing and mechanical included, and all plans must now be submitted digitally.
What requires a permit in Smithfield?
New construction, additions, structural alterations, many renovations, and electrical, plumbing and mechanical work can require permits. In Smithfield, even a shed needs a Town zoning permit first; sheds are accessory structures under Article 7, Section 7.3 of the Unified Development Code. Working without a zoning permit is a zoning violation that can bring a warning letter and fines.
Town zoning permit
- Most construction projects
- Sheds, pools and house additions
- New businesses or uses, and new or changed business locations
- Signs, driveways and work in the right-of-way
- Site plan review for new commercial, multifamily and mixed-use buildings
No permit
- Fences, which must still meet the Unified Development Code: 6 feet maximum, no more than 3 feet if over 75% solid in a front yard, and 30 inches in the corner-lot sight triangle
The County’s fee schedule shows the building work it permits: new homes, additions and remodels, garages, carports, storage buildings, decks and gazebos, pools, re-roofs, solar panels, demolition, changes of use and tenant, manufactured and moved homes, and commercial work.
Smithfield building department: who handles permitting
Johnston County Building Inspections issues building permits and performs construction inspections for Smithfield under contract with the Town. The County office is in the Land Use Center at 309 E. Market Street, Smithfield, NC 27577, phone 919-989-5060, email inspections@johnstonnc.gov; its Director is Shane Hudson. The Town Planning Department enforces zoning in the town limits and the extraterritorial jurisdiction (ETJ), a 2-mile area around the town.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Town Planning & Zoning | 350 E. Market Street, Smithfield, NC 27577; 919-934-2116 ext. 1112 |
| Johnston County Building Inspections | 309 E. Market Street, Smithfield, NC 27577; 919-989-5060 |
| County hours | Monday–Friday 8 a.m.–5 p.m. |
Smithfield permit types and filing path
Town zoning, planning and code-enforcement applications go through the Town’s Citizenserve portal; walk-in and emailed applications are still accepted during the transition. Every new business, change of tenant or change of ownership also needs a Town zoning permit before opening, and new commercial or multifamily buildings start with a meeting with Planning staff and a site plan review.
Building and trade permits are separate records with Johnston County Building Inspections. The County takes applications by email to inspections@johnstonnc.gov or at the Land Use Center counter, using its residential or commercial permit application. Since April 1, 2026, all construction drawings for residential and commercial projects must be digital, even when applying in person.
Permit fees in Smithfield
Smithfield projects pay the Town’s planning fees (FY 2026-27 schedule, amended September 15, 2026) and the County’s building permit fees.
Not sure this scope needs a permit?
Get a free quote →| Project | Fee |
|---|---|
| Town zoning permit: single-family or two-family | $25 |
| Town zoning permit: commercial or multifamily | $100 |
| Town sign / driveway permit | $50 / $25 |
| Town site plan or construction plan review | $300 plus $50 per acre |
| Town stormwater permit (non-exempt) | $100 per disturbed acre, $850 minimum |
| County: new single-family home | $600 up to 1,200 sq ft, plus $0.30 per sq ft over; trades included |
| County: attached garage or carport on a new home | $90 extra |
| County: addition or remodel | $200 up to 400 sq ft, plus $0.30 per sq ft over; $75 per trade |
| County: storage building or garage / deck or gazebo | $100 / $75 |
| County: swimming pool | $100 building plus $75 electrical |
| County: re-roof / residential demolition / residential solar | $100 / $100 / $200 |
| County: trade inspection or re-inspection | $75 each |
| County: residential plan change after approval | $250 |
| County: Homeowners Recovery Fund | $10 |
For example, a new 2,000 sq ft house costs $600 plus 800 × $0.30, or $840, before the $25 Town zoning permit, any attached garage charge and the $10 recovery fund fee. Commercial projects are charged per trade by job cost, from $75 up to $6,853 at $1,000,000; projects over $500,000 pay $1,000 at plan submittal, credited at issue. After-hours inspections cost $125 an hour with a 2-hour minimum.
Electrical, plumbing, mechanical and gas coordination
Electrical, plumbing and mechanical permits are handled by Johnston County Building Inspections along with the building permit. On a new house they are included in the building fee; on additions, remodels and accessory buildings each trade inspection costs $75, and stand-alone trade work is $75 per trade. Commercial trade fees follow the County’s job-cost table for each trade. For commercial buildings, the Smithfield Fire Department charges $100 for building plan review and trade fire inspections, $50 for a change of tenant or use, and $0.02 per sq ft (at least $100) for fire alarm and sprinkler plan review.
Rather talk it over?
Call 1-855-478-4290 →Alliance handles electrical permit expediting for contractors here. More on this: who pulls the electrical permit.
Application documents and plan review
Johnston County building permit
- Completed residential or commercial permit application
- Completed site plan
- Construction drawings in digital format only
- Copy of the septic permit, or
- Copy of the well permit, or the Public Utilities receipt showing the water tap is paid
- Lien agent form from LiensNC
- Town of Smithfield zoning permit
Residential plan set
- Designed to the 2018 North Carolina Residential Code, as built on site (no reversed plans)
- Elevations, foundation, floor and roof framing details
- Wall bracing plan for each floor
- Engineer-sealed truss layouts with load points
- Energy details: window U-factor, glazing area, climate zone and insulation
- Every room named by its use
Rather not deal with the building department?
Get a free quote →How to apply — 6-step Smithfield workflow
Confirm the property is under Town of Smithfield zoning.
Obtain the Town of Smithfield zoning permit before the County building permit.
Gather the plans, contractor information, owner authorization and the zoning permit.
Submit building and trade permits to Johnston County Building Inspections.
Respond to County and Town comments on the same records.
Request building inspections from Johnston County; ask Town Planning for site, landscaping and stormwater inspections.
Inspections and closeout in Smithfield
Johnston County Building Inspections manages building permit inspections for Smithfield. Request them by phone at 919-989-5060 by 3:00 p.m. for an inspection the next business day; inspection status can be checked on the County’s Building Inspections website. A failed inspection costs $75 to repeat.
The Town Planning Department handles site-development and landscaping inspections. Stormwater infrastructure inspections are done by the Town Engineer and arranged through the Planning Department. Do not cover regulated work before the required inspection has passed.
North Carolina building code
The 2018 North Carolina State Building Code family applies statewide, with the 2020 North Carolina Electrical Code; one- and two-family homes and townhouses still use the 2017 edition. The 2024 code has been delayed and cannot take effect before late 2027. The NC State Building Code and the delayed 2024 edition
Official permitting resources
These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.
Want this handled start to finish?
Get a free quote →- NC OSFM current codes
- Johnston County Building Inspections
- Smithfield Planning & Zoning
- Smithfield Planning FAQ
- Smithfield FY 2026-27 fee schedule (amended)
- Johnston County permit fee schedule
- Johnston County: how to apply for a building permit
- Johnston County residential plan review requirements
- Johnston County: building permits by town
Smithfield permit FAQ
Who issues Smithfield building permits?
Johnston County Building Inspections, under contract with the Town.
What comes before the building permit?
A Town of Smithfield zoning permit: $25 for a single-family or two-family project and $100 for commercial or multifamily work.
How much is a building permit for a new house?
Johnston County charges $600 for up to 1,200 sq ft plus $0.30 for each extra sq ft, with the trades included. A 2,000 sq ft house is $840, plus $90 if it has an attached garage.
Do I need a permit for a fence or shed in Smithfield?
A fence needs no permit but must follow the Town’s height rules. A shed needs a Town zoning permit, and the County charges $100 for a storage building permit.
Inspections are where schedules slip.
Get a free quote →Can I submit paper plans?
No. Since April 1, 2026 Johnston County accepts construction drawings only in digital form, by email or brought in on a digital format.
How do I schedule an inspection?
Call Johnston County at 919-989-5060 by 3:00 p.m. for the next business day. Town Planning handles site, landscaping and stormwater inspections.
Simplify Smithfield permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in North Carolina. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Smithfield sooner?
Let Alliance prepare, file, and track your Smithfield permits while your crew stays on the job.
More North Carolina permitting guides
Johnston County
Read guide →Weddington
Read guide →Rolesville
Read guide →Southern Pines Building Permit Guide
Read guide →Spring Lake Building Permit Guide
Read guide →Stallings Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Smithfield permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.