Skip to main content

Person County, North Carolina Building Permit Guide

Person County’s Inspections Department permits and inspects building work in the county and the City of Roxboro. What needs a permit, the fee schedule, plan review and inspection rules.

Authority: Person County Inspections Department (county and Roxboro)Code: 2018 NC State Building CodePhone: 336-597-0570
County authority
Person County Inspections Department
Plan review
7 to 10 days
Permit contact
336-597-0570
2025 population
40,636

The Person County Inspections Department, at 325 S. Morgan Street, Suite A, in Roxboro (336-597-0570), issues building and trade permits and inspects work across Person County and inside the City of Roxboro. A new house of 1,201 to 2,000 sq ft costs $833 with all trades included, and the department allows 7 to 10 days for plan review.

What needs a permit in Person County?

The Inspections Department publishes its own examples. Work started without a required permit is charged double fees.

Permit needed

  • Decks, carports and garages of any size
  • Prefabricated storage buildings 12 feet or more in any dimension
  • Room additions and finishing an unfinished attic
  • New or relocated light fixtures that add to the wiring
  • Replacing and reconnecting a furnace, or changing the heating and air system
  • Adding a sink or toilet, or changing the plumbing
  • Changing to a different type of water heater
  • A backflow device on a lawn irrigation system
  • Kitchen cabinet replacement that changes the layout or exceeds $40,000
  • Structural repairs: joists, sub-floor, roof sheathing, headers, piers, footings

No permit

  • Non-structural repairs
  • Windows and doors replaced at the same size and location
  • Replacing deck pickets, railings, stair treads and decking boards
  • Like-for-like fixtures and water heaters in the same place
  • Vinyl siding replacement up to $40,000
  • Re-roofing up to $40,000 with the same type of material and no structural work
  • Swapping a dishwasher, disposal or light fixture without new or moved wiring

Who handles permitting in Person County?

The County Inspections Department enforces the building, plumbing, electrical and mechanical codes in both Person County and the City of Roxboro, the county’s only incorporated municipality. It takes applications, issues or denies permits, inspects, and issues certificates of compliance. Dale Tillman is Director of Inspections. Zoning is not handled there: the City of Roxboro zones land inside its limits and Person County Planning & Zoning zones the rest, and Building Inspections will not issue a permit until zoning and Environmental Health have approved the project.

Short on time to read all of this?

Get a free quote →
Permit offices for Person County and Roxboro
ApprovalInside RoxboroRest of Person County
Building and trade permits, inspectionsPerson County Inspections, 336-597-0570Person County Inspections, 336-597-0570
Zoning approvalCity of Roxboro Planning, 336-322-6018Person County Planning & Zoning, 336-597-1750
Well and septicPerson County Environmental Health, 336-597-1790Person County Environmental Health, 336-597-1790
Person County Inspections Department
ItemDetail
Address325 S. Morgan Street, Suite A, Roxboro, NC 27573
Phone / fax336-597-0570 / 336-598-6838
Emailinspections@personcountync.gov
Office hoursWeekdays, 8:30 a.m. to 5:00 p.m.
Inspectors in the officeGenerally 8:30 to 9:00 a.m. and 1:00 to 5:00 p.m.

Applications and the self-service portal

The Permit Applications page has the General Information Sheet, the Building Permit Checklist, building, electrical, mechanical and plumbing applications, residential and commercial conditional power applications, the Homeowner/Contractor Affidavit, a Change of Contractor Form, a Scope of Work Form and a commercial demolition application. The County also runs a self-service portal on Tyler EnerGov.

An owner can be their own general contractor for a home, addition or accessory building on land they own if they will live in it for 12 months after completion and file the owner’s affidavit. Homeowners may also do their own plumbing, heating and electrical work at their primary home with a trade permit. Projects over $40,000 need a lien agent entry number, or the application is not processed.

Person County permit fees

The fee schedule on the Inspections Department’s page took effect on July 1, 2022, and the Adopted Fee Schedule attached to the County’s FY 2026–27 budget ordinance lists every Inspections fee below as “No Change”. New-home fees are flat by size band and already include every trade.

Not sure this scope needs a permit?

Get a free quote →
Person County residential permit fees (FY 2026–27, unchanged since July 1, 2022)
ProjectFee
New home up to 1,200 sq ft$690
New home 1,201–2,000 sq ft$833
New home 2,001–3,000 sq ft$987
New home 3,001–5,000 sq ft$1,141
New home over 5,000 sq ft$1,141 plus $0.22 per sq ft over 5,000
Homeowners Recovery Fund$10
Addition, remodel or fire damage up to 400 / 401–800 sq ft$150 / $175
Addition 801–1,200 sq ft$0.22 per sq ft plus trade fees
Deck$150
Accessory building, unfinished / finished walls$150 / $175
Garage, unfinished / finished$150 / $200
Modular home, on-frame or one-storey off-frame / taller off-frame$500 / $550
Single / double / triple-wide mobile home (without or with AC)$250–$310 / $285–$345 / $300–$360
Swimming pool$150 plus $75 per trade
Residential boat dock$225
Residential solar$150

Commercial and other non-residential work is charged on job cost, from $75 for jobs up to $700 to $6,370 at $1 million, then $2.80 per $1,000 above that. A foundation permit is $300 and demolition $150.

Re-inspections cost $75, and so does a trip when the job is not ready; a second re-inspection is $100, a third $150 and a fourth $300. Renewing an expired permit costs half the original fee, and occupying a building without a certificate of occupancy carries a $2,000 fine.

Electrical, plumbing and mechanical permits

A licensed contractor normally does trade work, but a homeowner may do the plumbing, heating or electrical work in their own primary home with a trade permit. Gas service to a house is installed under its own mechanical permit.

Rather talk it over?

Call 1-855-478-4290 →
Person County trade fees (FY 2026–27, unchanged since July 1, 2022)
PermitFee
Trade permit for additions, pools and other work$75 per trip
Residential plumbing$75
HVAC replacement or change-out$75
Residential service change, up to 200 A / over 200 A$75 / $150
Temporary power (residential)$150
Temporary pole inspection$75, not charged if combined with another inspection
Gas piping$75
Non-residential electrical service, 100 A to 400 A$75 to $130, plus the job-cost fee

Building permit checklist and plan review

  • Environmental Health approval for the well and septic system.
  • Zoning approval from the City of Roxboro or Person County.
  • The General Information Sheet.
  • A building permit application signed by the general contractor and every subcontractor, or the owner’s affidavit.
  • The 10-digit Duke premise ID if Duke supplies the power.
  • The lien agent entry number for jobs over $40,000.
  • Plans and a scope of work where the project needs them.

Plans must be drawn at a scale of at least 3/16 inch on 11 by 17 inch paper or larger, and review takes 7 to 10 days; plans are never reviewed the day they are dropped off.

Commercial applications need two sets of plans with an NC Building Code Summary Sheet and a site plan, the application signed by all contractors and a commercial land use application. Inside Roxboro, one more set goes to the Roxboro Fire Department and one to the City Planning Director, and the Inspections Department will pass them on if you bring them all there. The County puts the whole commercial process at about 15 to 20 business days, and rejected plans need a second review.

Rather not deal with the Person County building department?

Get a free quote →

Getting a Person County permit

1. Clear Environmental Health

Get the well and septic approvals or permits first.

2. Get zoning approval

From Roxboro Planning inside the city, or County Planning & Zoning outside it.

3. Assemble the checklist

Application with all contractor signatures, General Information Sheet, Duke premise ID, lien agent number and plans.

4. Submit and wait for review

Bring it to the Inspections Department at 325 S. Morgan Street and allow 7 to 10 days for plan review.

5. Collect the permit

It is issued once every department has signed off.

6. Call in inspections by permit number

Phone the main desk by 3:00 p.m. for the next working day.

Inspections in Person County

Every inspection request goes through the main desk with the permit number; messages on an inspector’s voicemail do not count. The County asks for 24 hours’ notice, with requests in by 3:00 p.m. for the next working day, and it completes inspections within three working days counting from the scheduled day. Footings, slabs and trenches go first and can be asked for in the morning or afternoon; calling several days ahead does not move a job up the list.

For a house the County’s list runs: footing, with a portable toilet on site; saw service; foundation and floor framing, which is set up only after the Planning Department has approved the survey; waterproofing and basement walls where present; slabs; all rough-ins together with framing; pre-brick veneer; insulation; trenches; the temporary electrical final, at which the inspector may release power; and the building final, with all trades inspected at the same visit. Environmental Health and zoning finals must be issued before the building final, approved plans must be on site, and any footprint change needs fresh approval from Planning, Environmental Health and Building Inspections.

Local Person County details

Garage doors: the County’s final inspection list asks for garage doors rated for 90 mph.

Want this handled start to finish?

Get a free quote →

Sealed crawl spaces: the County recommends poly and a dehumidifier as soon as the roof is dried in, to protect the crawl space from moisture during construction.

Boat docks: a residential boat dock needs its own permit, at $225, and an ABC inspection covering all trades costs $150.

North Carolina building code

The 2018 North Carolina State Building Code family applies statewide, with the 2020 North Carolina Electrical Code; one- and two-family homes and townhouses still use the 2017 edition. The 2024 code has been delayed and cannot take effect before late 2027. The NC State Building Code and the delayed 2024 edition

Person County permit search and official resources

Inspections are where schedules slip.

Get a free quote →

Person County permit FAQ

Who issues building permits in Roxboro?

The Person County Inspections Department, which permits and inspects inside the City of Roxboro as well as the rest of the county. The City handles zoning inside its limits.

How much is a building permit for a new house in Person County?

$690 up to 1,200 sq ft, $833 up to 2,000 sq ft, $987 up to 3,000 sq ft and $1,141 up to 5,000 sq ft, including all trades, plus the $10 Homeowners Recovery Fund.

How long does plan review take?

The County allows 7 to 10 days for plan review, and puts the whole commercial permit process at about 15 to 20 business days.

Do I need a permit for a shed or deck?

Decks need a permit at any size. Prefabricated storage buildings need one when any side is 12 feet or more.

Do I need a permit to replace my roof?

Not if it costs $40,000 or less, uses the same type of material and involves no structural work.

How do I schedule an inspection?

Call the main desk at 336-597-0570 with your permit number by 3:00 p.m. for the next working day.

What happens if I start without a permit?

The permit fees are doubled.

Simplify Person County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in North Carolina. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Person County sooner?

Let Alliance prepare, file, and track your Person County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Person County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.