Martin County, North Carolina Building Permit Guide

Martin County’s Inspections Department in Williamston permits and inspects building and trade work in the whole county and all nine towns, under fees in force since August 1, 2025.

Authority: Martin County Building Inspections DepartmentCode: 2018 NC State Building CodePhone: 252-789-4310
County authority
Martin County Building Inspections Department
Covers
All of Martin County and its 9 towns
Permit contact
252-789-4310
2025 population
21,601

Martin County’s Inspections Department in Williamston issues building, electrical, plumbing, mechanical and manufactured home permits for the whole county, including all nine towns. Permits are issued in person, Monday to Friday, for cash or check. A new house is charged $0.20 per heated square foot and $0.16 per unheated square foot under the fees in force since August 1, 2025, with the trades priced separately.

What requires a permit in Martin County?

Chapter 6 of the Martin County Code applies the state building code to all of the county and its municipalities. It requires permits for building and repair work, plumbing, electrical, heating and air conditioning, setting up mobile homes, signs and awnings where the state code calls for them, and any change of use of an existing building, which is inspected before the permit is issued.

Permit needed

  • New houses and commercial buildings
  • Remodels and rehabilitation
  • Single, double and triple-wide manufactured homes
  • Pools, spas and hot tubs
  • Solar systems and generators
  • Billboards and communication towers
  • Demolition
  • Change of use

Excluded by the County Code

  • Nonresidential farm buildings, though electrical work still needs a permit
  • Prefabricated outside storage buildings under 145 sq ft (their wiring, plumbing or mechanical work is not excluded)
  • Power, communication and utility lines
  • Minor plumbing repairs on the house side of a trap and minor burner servicing

Who handles permitting in Martin County?

The County Inspections Department provides building inspections and permits for all of Martin County, and its website names every town it covers: Bear Grass, Everetts, Hamilton, Hassell, Jamesville, Oak City, Parmele, Robersonville and Williamston. Inside a town, the town’s zoning permit goes in with the application where one is required.

Short on time to read all of this?

Get a free quote →
Martin County permit contacts
ItemDetail
Inspections Department205 East Main Street (PO Box 668), Williamston, NC 27892
Phone / fax252-789-4310 / 252-789-4314
Emailinspections@martincountync.gov
Office hours8:00 a.m. to 5:00 p.m., Monday to Friday; plan review hours 8:00 to 10:00 a.m.
AddressesTax Assessor 252-789-4350; 911 Addressing Coordinator 252-789-4559
Septic and wellsMartin-Tyrrell-Washington District Health, 252-793-3023

Every building, plumbing, heating and air conditioning, insulation or electrical contractor working in the county must register with the Inspections Department, giving the business address and state licence number.

The application

The County posts its Building Permit Application, Mobile Home Permit Application and manufactured housing requirements online, and applications are signed by the owner or the owner’s authorised agent. The building application asks for:

  • The owner or project name, structure address and tax parcel number
  • Heated and unheated square footage, stories, bedrooms, baths and roof type
  • Whether the site is inside a town’s limits, the zoning or septic permit number, and the flood zone
  • The job cost and the pest control contractor
  • The electrical contractor, service size, utility provider and whether temporary power is needed
  • The plumbing contractor with the fixture count, and the mechanical contractor with tonnage or BTU and unit type

The structure address must be assigned by the County Tax Assessor’s Office and checked by the 911 Addressing Coordinator; a wrong address brings a $50 fine.

Martin County permit fees

The current fees took effect August 1, 2025.

Not sure this scope needs a permit?

Get a free quote →
Building fees (effective August 1, 2025)
ProjectFee
New house, heated / unheated area$0.20 / $0.16 per sq ft
Remodel or rehab$2 per $1,000 of total cost
Commercial, heated / unheated area$0.40 / $0.20 per sq ft
Commercial plan review$150
Manufactured home, single / double / triple wide$80 / $120 / $150, plus $80 electrical
Pool, spa or hot tub installation$200
Communication tower / billboard sign$200 each
Demolition$60
Fire inspection / day care or foster care inspection$50 each
ABC permit (fire and electrical)$80

For example, a house with 1,800 sq ft heated and a 400 sq ft unheated garage is $360 plus $64, or $424, for the building portion, before electrical, plumbing, insulation and mechanical fees.

Each re-inspection costs $50, and an occupancy evaluation $50. Work without a permit is fined $200 or double the permit fee, whichever is greater.

Electrical, plumbing and mechanical fees

Trade fees (effective August 1, 2025)
PermitFee
Electrical, residential / commercial$0.40 / $0.60 per amp
Temporary pole or farm service, 200 A or less$80
Residential addition wiring, pool or spa, outdoor sign wiring$80
Solar$0.60 per panel, plus electrical by overcurrent amperage
Plumbing, new construction residential / commercial$8 / $10 per drain
Plumbing fixtures$8 each, $48 minimum
Sewer change / gas piping$50 each
Heating and air$20 per ton
Heat only / A/C only or refrigeration$16 per 50,000 BTU / $16 per ton
Duct replacement$0.10 per sq ft
Insulation, residential / commercial$0.05 / $0.08 per sq ft

Rather talk it over?

Call 1-855-478-4290 →

A 200-amp house service at the residential rate is $80.

Plans and site approvals

Under section 6-58 of the County Code, the department can ask for two or more sets of plans drawn to scale, plans must show who drew them, and plans must carry an architect’s or engineer’s seal where state law requires one. The department may also ask for a site drawing showing all buildings on the lot, or a boundary survey by a registered land surveyor.

Before any permit is issued, the district health department must approve a septic system wherever the building cannot connect to town or county sewer. Martin-Tyrrell-Washington District Health handles on-site wastewater and private water supplies.

How to get a building permit in Martin County

1. Get the address

Have the Tax Assessor’s Office assign the address and the 911 coordinator check it.

2. Septic or zoning

Get district health septic approval off sewer, or the town’s zoning permit inside town limits.

3. Fill in the application

Include square footage, contractors and licence numbers, fixture counts and service size.

4. Bring plans in the review window

Plan review hours are 8:00 to 10:00 a.m. at 205 East Main Street.

5. Pay by cash or check

Fees follow the August 2025 schedule.

6. Keep the approved plans on site

One stamped set stays at the job for the inspectors.

Rather not deal with the Martin County building department?

Get a free quote →

Inspections in Martin County

The permit holder must tell the Inspections Department when each stage is ready. The County Code lists four inspections: foundation, before concrete is placed; framing, with rough plumbing, ducts and wiring in place; insulation, before finishes go on; and final, when the building is ready to occupy. Work may not go past a stage until the department gives written approval.

A permit expires if work has not started within 6 months of issue, or if it stops for 12 months. The department issues certificates of compliance and occupancy at the end.

Manufactured homes in Martin County

The County’s set-up requirements, updated in September 2026, say power will not be connected until all of them are met:

  • Return the Manufactured Home Application with the make, model, serial number, size and year, plus the septic permit and, inside a town, the zoning permit
  • Buy the electrical and set-up permits from the Building Inspector’s office
  • Block and tie down the home to the manufacturer’s instructions and the state manufactured housing code
  • Fit backflow (check) and gate valves on the water line, and never mix ABS and PVC fittings on the sewer line
  • Post the 911 address in 3-inch reflective numbers visible from both directions
  • Request the inspection when everything is complete but before the underpinning goes on
  • Build steps at least 36 inches wide with a 36 by 36-inch landing at an outward-opening door, and handrails where steps rise 30 inches or more

North Carolina building code

The 2018 North Carolina State Building Code family applies statewide, with the 2020 North Carolina Electrical Code; one- and two-family homes and townhouses still use the 2017 edition. The 2024 code has been delayed and cannot take effect before late 2027. The NC State Building Code and the delayed 2024 edition

Want this handled start to finish?

Get a free quote →

Martin County permit search and official resources

Inspections are where schedules slip.

Get a free quote →

Martin County permit FAQ

Who issues building permits in Williamston and Robersonville?

Martin County. Its Inspections Department covers the whole county, including all nine towns.

How much is a building permit for a new house?

$0.20 per heated sq ft and $0.16 per unheated sq ft for the building, plus $0.40 per amp electrical, $8 per drain plumbing, $0.05 per sq ft insulation and mechanical by tonnage.

Can I pay by card?

The County says permits are issued for cash or check.

Do I need a permit for a small storage building?

Not for a prefabricated outside storage building under 145 sq ft, but any wiring, plumbing or mechanical work in it still needs a permit.

What is the penalty for building without a permit?

$200 or double the permit fee, whichever is greater.

When can I submit plans?

The application lists plan review hours of 8:00 to 10:00 a.m., Monday to Friday.

Simplify Martin County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in North Carolina. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Martin County sooner?

Let Alliance prepare, file, and track your Martin County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Martin County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.