Greene County, North Carolina Building Permit Guide

Greene County Planning & Inspections issues building and trade permits in the unincorporated county and Snow Hill through its OpenGov portal, with fees from $0.14 per square foot.

Authority: Greene County Planning & InspectionsCode: 2018 NC State Building CodePhone: 252-747-4019
County authority
Greene County Planning & Inspections
Apply online
OpenGov portal
Permit contact
252-747-4019
2025 population
20,700

Greene County Planning & Inspections in Snow Hill issues building, electrical, plumbing and mechanical permits for the unincorporated county and, under the Town’s own ordinance, for Snow Hill and its extraterritorial area. Applications go through the County’s OpenGov portal, where the building application also covers zoning approval. A house is charged $0.14 per square foot under the inspection fees the County adopted for FY 2026–27.

What requires a building permit in Greene County?

The County’s Building Codes Enforcement Ordinance, adopted June 21, 2021, requires a permit for building, moving, altering, repairing or demolishing a building, for plumbing, heating, cooling and electrical work, for setting up a mobile home, and for signs and awnings where the state code calls for one. Changing the use of an existing building needs an inspection.

Permit needed

  • New homes, additions and commercial buildings
  • Renovations over the exemption limit
  • Manufactured and modular homes, and house moving
  • Demolition
  • Electrical, plumbing, mechanical and gas line work
  • Pools, signs and billboards
  • Change of occupancy

Exempt from the building ordinance

  • Residential accessory buildings no more than 12 feet in any dimension
  • Nonstructural residential repairs or alterations worth $40,000 or less (state law, G.S. 160D-1110(c); the County ordinance still says $5,000)
  • Farm buildings on a bona fide farm, though electrical, mechanical and plumbing permits are still required
  • Utility poles, towers and similar utility equipment

Who handles permitting in Greene County?

Greene County merged building inspections, planning, zoning and GIS into one Planning & Inspections Department. Its inspectors review plans, issue permits, inspect work and issue Certificates of Occupancy; the planning side handles zoning, floodplain management, subdivisions and E-911 addresses. Scott Sutton is the Inspections Director.

Short on time to read all of this?

Get a free quote →
Who issues building permits in Greene County’s towns
AreaBuilding permits
Unincorporated Greene CountyGreene County Planning & Inspections; zoning approval is part of the County building application
Snow Hill (town limits and extraterritorial area)Greene County inspects and issues the building permit, but only after the Town of Snow Hill issues its own zoning permit
HookertonThe published sources do not say; ask Town Hall at 252-747-3816
WalstonburgThe published sources do not say; ask the Town

The County ordinance covers the County’s whole planning jurisdiction and any town whose request is approved by the Board of Commissioners. The office is at 229 Kingold Blvd, Suite E, Snow Hill, NC 28580, phone 252-747-4019, open 8:00 a.m. to 5:00 p.m., Monday to Friday. Septic permits come from the Greene County Department of Public Health’s Environmental Health section next door at 227 Kingold Blvd, Suite B (252-747-8183).

Applying through OpenGov

The County’s OpenGov site handles planning, inspections, environmental health and fire permits in one place. Create a login with your email address, pick the permits you need, pay online and receive the permit by email. Applications include residential and commercial building permits, change of occupancy for a new business in an existing building, trade permits, septic, fire inspection, communication towers, solar installations and in-ground pools. Surveys and plats can also be submitted for review there as PDFs.

Have these ready before you start:

  • The site address, or a pin on the portal map if no address has been assigned yet
  • The owner’s name and mailing address, if you are not the owner
  • The contractor’s name, licence number, mailing address and email; you can add these later, but no building permit is issued until the County has checked them
  • PDF drawings for new construction

Permit and application fees are non-refundable. Under the ordinance, every building, plumbing, mechanical or electrical contractor must register with the Inspections Department, giving the business address and state licence number, before working in the County’s jurisdiction. Subcontractors use the Temporary Power Request form to authorise temporary power to all or part of a structure.

Greene County permit fees

Inspection fees are set in Section 29 of the County’s budget ordinance for FY 2026–27, in force from July 1, 2026; the department page still links its 2024 schedule, which charged $125 for a change of occupancy. Square-foot rates apply to the building’s total square footage, and every permit costs at least $50.

Not sure this scope needs a permit?

Get a free quote →
Greene County building fees (FY 2026–27 budget ordinance)
ProjectFee
Building, residential / commercial$0.14 / $0.18 per sq ft
Renovation, residential / commercial$3 / $4 per $1,000 of contract
Single-wide / double-wide mobile home$150 / $200
Modular unit or house moving$250
Demolition, residential / commercial$75 / $100
Change of occupancy$100
Pool$100
Signs and billboards$100
Livestock production building$175 per building plus amperage
Homeowners Recovery Fund (residential)$10

For example, the building permit for a 2,000 sq ft house is $280 before the trade permits and the $10 Homeowners Recovery Fund charge.

Each re-inspection costs $75 and must be paid before further inspections on the property. Starting without a permit adds a $100 charge, and inspections not listed on the schedule are billed at $50 an hour.

Electrical, plumbing and mechanical permits

The same department issues the trade permits, and they are applied for in OpenGov alongside the building permit.

Greene County trade fees (FY 2026–27 budget ordinance)
PermitFee
Electrical, residential / commercial$0.08 / $0.10 per sq ft plus the service fee
Electrical service, 0–200 A / 201–400 A$75 / $95
Electrical service, 401–600 A / 601–800 A$115 / $135
Temporary service pole$75
Plumbing, residential / commercial$10 / $12 per fixture
Sewer and water taps, residential / commercial$50 / $75
Mechanical, residential / commercial$0.08 / $0.10 per sq ft
HVAC unit replacement$75
Gas line, residential / commercial$50 / $75
Insulation, residential$0.02 per sq ft, $50 minimum

Rather talk it over?

Call 1-855-478-4290 →

For a manufactured home, the County’s process sheet says a licensed set-up contractor must take out the building permit. An owner who owns both the home and the land and will live in it may buy the plumbing, mechanical and electrical permits personally.

Site plans and application documents

The Greene County Zoning Ordinance requires a site plan for every new house on a lot under 5 acres and for all commercial property, prepared, signed and sealed by a North Carolina licensed surveyor or engineer. It must be drawn at 1 inch = 60 feet or a larger scale and show:

  • Boundary lines with bearings and distances
  • The proposed house or buildings, driveway and parking, and all existing structures
  • Minimum building setbacks, buffers, easements and rights of way
  • A flood statement if the lot is in a flood hazard area
  • A statement on whether a swine farm lies within 750 feet of the construction

Property corners and the footprint of the new building must be marked or flagged on the ground. Accessory buildings and additions do not need a site plan unless Planning, the Building Inspector or the Health Department asks for one.

The ordinance also lists what an application must contain: the owner’s name and address, a signed statement of ownership, the owner’s written authorisation if an agent applies, the tax parcel number, a lien agent form where it applies, and a survey or deed if needed. Plans must name their author, and must carry a North Carolina architect’s or engineer’s seal where state law requires one. No permit is issued on a lot in a proposed subdivision until the plat has final Planning Board approval and is recorded.

Rather not deal with the Greene County building department?

Get a free quote →

How to get a Greene County building permit

1. Check where the lot is

In Snow Hill or its extraterritorial area, get the Town’s zoning permit first; in Hookerton or Walstonburg, ask the Town.

2. Sort out the septic permit

Apply to Greene County Environmental Health for a septic permit where the lot is not on sewer.

3. Order the sealed site plan

Needed for a new house on less than 5 acres and for any commercial project.

4. Apply in OpenGov

Choose the residential or commercial building permit, which includes County zoning approval, and add the trade permits.

5. Add the contractor

The permit is issued only after the County has checked the contractor’s licence details.

6. Post the permit card

Keep the building permit card and one approved plan set on site until the job is finished.

Inspections in Greene County

The permit holder has to tell the Inspections Department when each stage is ready. The ordinance lists these inspections:

  • Footing, before concrete is placed
  • Pre-underslab, with stone, vapor barrier and steel in place
  • Foundation and pre-subfloor, once supports and floor joists are installed
  • Framing and rough-in for all trades
  • Insulation, before interior finishes go on
  • Final, when the building is ready to occupy

Work may not continue past each stage until an inspector signs the permit card. Utilities may not be connected until the department approves them and issues the Certificate of Occupancy, though an inspector can allow temporary power or a temporary certificate for part of a building. A permit expires if work has not started within 6 months, or if it stops for 12 months.

Local Greene County details

Building your own home: an owner may do their own building, electrical, plumbing and mechanical work if they will live in the building for at least 12 months after completion, and must sign a sworn affidavit when the project costs $40,000 or more (G.S. 87-14; section 17F of the County ordinance still shows $30,000).

Snow Hill: the Town’s zoning permit costs $50, or $25 inside the historic district. Residential site review is $125, commercial site review $250, an excavating permit $200 and a driveway inspection $25. Before the County issues a Certificate of Occupancy, the Town must issue its certificate of compliance.

County ordinances checked at permit time: the site must meet the County’s subdivision, zoning, manufactured home park, flood damage prevention and soil erosion ordinances.

Want this handled start to finish?

Get a free quote →

North Carolina building code

The 2018 North Carolina State Building Code family applies statewide, with the 2020 North Carolina Electrical Code; one- and two-family homes and townhouses still use the 2017 edition. The 2024 code has been delayed and cannot take effect before late 2027. The NC State Building Code and the delayed 2024 edition

Greene County permit search and official resources

Inspections are where schedules slip.

Get a free quote →

Greene County permit FAQ

How much does a building permit cost in Greene County?

$0.14 per square foot for residential work and $0.18 for commercial, with a $50 minimum per permit. A 2,000 sq ft house is $280 before trade permits.

Do I need a separate zoning permit?

Not in the unincorporated county, where the OpenGov building application includes zoning approval. In Snow Hill, the Town issues its own zoning permit before the County building permit.

Do I need a permit for a small shed?

A residential accessory building no more than 12 feet in any dimension is exempt from the County building ordinance. Larger sheds need a permit.

Can I do my own work as a homeowner?

Yes, on your own property if you will live there for at least 12 months after the work is finished; an owner-builder project of $40,000 or more needs the signed affidavit.

When is a surveyor’s site plan required?

For a new house on a lot under 5 acres and for all commercial projects.

Who issues septic permits?

Greene County Environmental Health, 252-747-8183, and its septic application is also in OpenGov.

Are permit fees refundable?

No. The County states that permit and application fees are non-refundable.

Simplify Greene County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in North Carolina. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Greene County sooner?

Let Alliance prepare, file, and track your Greene County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Greene County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.