Outside the Village of Alden, building permits come from the town’s Building/Code Enforcement Department at 3311 Wende Road (716-937-6969 ext. 4), which reviews plans, inspects and issues certificates of occupancy. Under the fee schedule the Town Board adopted on October 6, 2025, a new house costs $100 plus $0.75 per square foot of conditioned space and $0.50 per square foot of unconditioned space, and sheds, fences, roofs and pools all need their own permit.
What requires a building permit in Alden?
The department’s own answer is broad: every new structure, including pools, sheds, fences, roofs, gazebos and decks, needs a permit. Chapter 109 of the Town Code, rewritten by Local Law 1 of 2025 (adopted April 21, 2025), backs that up by requiring a permit for any work governed by the Uniform Code or the Energy Code, plus any solid-fuel heater, chimney or flue in a home.
Permit required
- New houses, additions and garages
- Barns, sheds, gazebos and other permanent accessory buildings
- Decks and remodeling that exposes framing or involves structural repair
- Roof replacement and window replacement
- In-ground, above-ground and storable pools
- Fences, generators and solar installations
- Demolition, signs, fill, ponds and berms
- Fuel tank installation or removal and work in a flood zone
No permit (Section 109-4 B)
- Painting, wallpapering, tiling, carpeting and similar finishes
- Partitions or movable cases under 5 feet 9 inches
- Window awnings on a one- or two-family house or townhouse
- Listed portable appliances and like-for-like equipment swaps
- Repairs that leave structure, exits and fire protection untouched
- Temporary film, television and theater sets
Alden’s exemption list has no small-shed or fence item, so a garden shed or a backyard fence goes through the office like any other project. Pools carry an extra rule: any pool built, installed or substantially modified after December 14, 2006 must have an approved pool alarm, and the code enforcement officer checks for it.
What the town decides and what the state holds
Construction standards come from the Uniform Code and Energy Code, which Alden enforces without stricter local building rules (those would need state Code Council approval). The town controls the rest: zoning in Chapter 365 (districts R-A, R-1, R-2, R-3, R-C, C-1 to C-3, M-1 and M-2), flood damage prevention in Chapter 198, filling and topsoil removal in Chapter 195, its own permit list and its fee schedule. Detached accessory buildings must sit at least 5 feet from side lines and 10 feet from the rear line, a house at least 10 feet from side lines and 30 feet from the rear, and buildings 35 feet back from town and county road rights-of-way; fences may go on the lot line.
Alden building department: who handles permitting
The town’s Building/Code Enforcement Department, headed by Building Inspector and Code Enforcement Officer Richard Coburn, covers every part of the town outside the village: plan review, permits, inspections, certificates and zoning questions. It works from Alden Town Hall on Wende Road, where the clerks also take ZBA and Planning Board paperwork.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Town Building/Code Enforcement | Alden Town Hall, 3311 Wende Road, Alden, NY 14004 |
| Phone | 716-937-6969 ext. 4 (Building Inspector direct: ext. 143) |
| Town Clerk (FOIL, appeals) | Same building; open weekdays, closed noon–1 p.m. for lunch |
| Village of Alden code office | 13336 Broadway, Alden, NY 14004; 716-937-9216 ext. 121 |
| Population | 10,262 townwide, 7,507 outside the village (Census, July 1, 2025) |
Village of Alden. The village (2,755 residents) sits inside the town but runs its own Building Department under a village code enforcement officer, who enforces the Uniform Code and the village’s zoning and subdivision laws. It posts separate applications for alterations, pools, one- and two-family houses, roofs, fences, decks and porches, detached storage, generators and fuel-burning appliances, and many village projects need site plan approval from the Village Board of Trustees, after Planning Board review, before a permit. The village also takes plumbing license applications. If your tax bill comes from the Village of Alden, start at 13336 Broadway rather than Town Hall.
Alden permit types and filing
The forms page offers a long-form application for new buildings and larger work, a short form for smaller jobs, a separate window and roof replacement application, a plan review form, a sign form and the ZBA application. Applications are filed on paper at Town Hall; the long form asks for the zoning district, SBL number, sewage and water source, distances from the right-of-way and side lines, and fixture and equipment counts for the plumbing and mechanical work.
Residential permits
A new house needs the department’s full list before review starts: the recorded deed as proof of ownership, a house number assigned by the town, a survey and plot plan showing the house, its elevation and the driveway, a design professional’s soil certification, two sealed plan sets with energy calculations and material specifications, the completed plan review checklist, a driveway permit and the builder’s insurance certificates. The list also calls for percolation test results, arranged through Erie County (716-858-7677). The long form adds site rules: the first floor must sit at least 1.5 feet above the crown of the road, an attached garage needs a three-quarter-hour fire-rated wall running to the peak (or a rated garage ceiling), basements need perimeter drains and a sump, and the 4-inch house number must be posted before the certificate of occupancy.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Not sure this scope needs a permit?
Get a free quote →Commercial permits
New commercial construction is priced at $500 plus $0.50 per square foot plus the town engineer’s review, and commercial site plan review is a separate application with its own fee and engineer deposit. A $500 deposit is taken whenever engineer review applies; it covers SEQR, stormwater plans, site plans and reports, extra deposits can be requested, and any balance is refunded. Fire inspections and operating permits run from $30 (up to 15,000 sq ft) to $150 (over 60,000 sq ft).
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
Zoning questions go to the Building Department first; a denial can be appealed to the Zoning Board of Appeals, whose applications are filed with the Town Clerk ($300 for an area variance and $500 for a use variance, plus legal notice and postage). The Planning Board meets on the second Tuesday of each month at 6 p.m. and needs agenda items by the 1st, and any subdivision needs both Planning Board and Town Board approval. Driveways need a permit from the road owner first: the State DOT (716-683-3476), Erie County (716-759-8328), or, on a town road, the Building Department itself for $225 plus the cost of the culvert pipe, which the Highway Department sizes and installs. Building on a lot of an acre or more requires the state stormwater notice of intent and SWPPP to be filed with the town before the permit. FEMA lists the town and the village as participating in the flood insurance program (maps dated June 7, 2019), so a mapped flood-zone lot also needs the town’s $500 flood zone development permit.
Alden building permit fees
The Building Department fee schedule adopted October 6, 2025 sets these charges. The forms page still links an older March 3, 2025 schedule; the October sheet is the one the department page lists as current.
Rather talk it over?
Call 1-855-478-4290 →| Project | Fee |
|---|---|
| New house or addition | $100 plus $0.75 per sq ft conditioned and $0.50 per sq ft unconditioned |
| Garage, barn or other permanent accessory building | $50 plus $0.15 per sq ft |
| Remodeling with exposed framing, structural work or decks | $50 plus $1.00 per $1,000 of construction cost |
| Roof replacement | $25 per 1,000 sq ft |
| Pool | $150 in-ground; $50 above ground; $25 a year storable |
| Generators, windows, fences, solar and similar work | $50 plus a construction-cost charge (see note) |
| Certificate of occupancy or compliance | $50; temporary certificate $100 a month |
| Failed inspection | $75 per repeat inspection |
| Demolition | $25 accessory; $150 one- or two-family house |
| Flood zone development permit; fuel tank installation or removal | $500 each plus engineer review |
| Relocatable building | $50 |
| Fill, pond or berm permit | $50 plus engineer review |
| Sign permit | $0.50 per sq ft fixed; $20 a month temporary |
| Commercial renovation | $500 plus $1 per $1,000 of construction budget |
| Commercial roof, generators, systems | $100 plus $0.25 per 1,000 sq ft |
| Recreation fee | $500 per new dwelling unit |
| Permit renewal (one more year) | The cost of the original permit |
A 2,000 sq ft house with a 500 sq ft attached garage therefore costs $100 plus $1,500 for the living space plus $250 for the garage, or $1,850, before the $50 certificate of occupancy, the recreation fee and any driveway permit. Building without a permit costs $200 or double the normal fee, whichever is greater. For “other residential construction” the October 2025 sheet prints “$50 plus $1.00 construction cost”, while the March 2025 schedule charged $1.00 per $1,000, so ask the office how a fence or generator will be priced.
Trade permits and who may pull them
The town’s permit list and Chapter 109 contain no electrician or plumber licensing rule for work outside the village; plumbing and heating work is listed on the building application itself, by fixture and unit count, and checked at the rough and final inspections. Electrical work is inspected by a private agency: the long-form application names Commonwealth Electrical Inspection Service, National Electrical Certified Inspections and Atlantic-Inland, and the electrical inspection must be passed before walls are closed. That form dates from 2011, so confirm with the office which agencies it accepts now.
Inside the Village of Alden the rules differ: the village takes applications for its own plumbing license, so a plumber working on a village property should hold one. Contractors working in the town supply proof of workers’ compensation (form C-105.2), disability (DB-120.1) and liability coverage with the application; owners doing their own work sign the state exemption affidavit instead.
Rather not deal with the building department?
Get a free quote →Septic and wells. For a new house on a septic system, the Erie County Department of Health (716-961-6800) issues the construction permit from a licensed design professional’s plans ($300 application fee) and later a completed-works approval, and a new well needs a registered driller, a well log and a clean bacteriological test. Repairing or replacing a failed system needs a county application with the same $300 fee. The town form reminds builders that no construction may sit over or under a septic system, utility line or pipeline.
How to apply for an Alden building permit
Parcels in the Village of Alden go to the village office at 13336 Broadway; everything else goes to Town Hall.
Confirm the district, lot size and setbacks with the department, and line up any variance, site plan or subdivision approval.
Driveway permit from the state, county or town; Erie County perc test results and, without sewer, the county septic permit; stormwater filings on lots of an acre or more.
Request the number from the department, then assemble the sealed plans, energy calculations, soil certification and plan review checklist.
Long form, short form or the window and roof application, with insurance certificates and the fee from the October 2025 schedule.
Call for each inspection before concealing work, then pass the final and collect the certificate of occupancy.
Review, corrections and what causes delay
Several items on the new-house list come from other agencies, so order them early: the county septic permit, the driveway permit and, on lots of an acre or more, the state stormwater filing; the town form notes that construction cannot begin until 5 business days (or 60 for designs that depart from DEC standards) after the DEC receives the notice of intent, unless it sends an acknowledgment letter sooner. Once issued, a permit lapses if work does not start within six months and expires within 12 months; one renewal for another year costs the same as the original permit, so plan long jobs around that limit.
Alden inspections and certificates
The department’s required inspections follow the build: footings before concrete is poured, foundation walls before they are poured, the foundation before backfill, then framing, electrical, plumbing, heating and air conditioning, and insulation, each before the work is enclosed. The final inspection comes before the certificate of occupancy, which costs $50. Book each one by calling 716-937-6969 ext. 4.
Want this handled start to finish?
Get a free quote →Before the final, the electrical agency’s certificate and, on a septic lot, the county’s completed-works approval must be in hand, and the house number must be displayed. A failed inspection costs $75 for each return visit. The code enforcement officer can issue a temporary certificate of occupancy for up to six months when the building is safe to occupy but unfinished; it carries a monthly charge of $100.
New York building code
New York builds on one statewide code, the Uniform Code, outside New York City; the 2025 edition and 2025 Energy Code took effect on 31 December 2025 (the all-electric provisions remain suspended by court order). Cities, towns and villages administer it, and local standards stricter than the code need Code Council approval. The Uniform Code in New York
Alden permit FAQ
Do I need a permit for a shed or fence in Alden?
Yes. The department requires permits for sheds and fences, and Chapter 109 has no size exemption for small sheds. A shed is priced as an accessory building at $50 plus $0.15 per square foot.
Does the town issue permits in the Village of Alden?
No. The village has its own code enforcement officer at 13336 Broadway (716-937-9216 ext. 121), its own forms and its own site plan process through the Village Board.
How much is a permit for a new house?
$100 plus $0.75 per square foot of conditioned space and $0.50 per square foot of unconditioned space, so $1,850 for a 2,000 sq ft house with a 500 sq ft garage, before other charges.
Do I need a permit to replace my roof or windows?
Yes. The town has a dedicated window and roof replacement application; a roof is $25 per 1,000 square feet.
How long is an Alden permit valid?
Work must begin within six months, and the permit expires within 12 months; a one-year renewal costs the original permit fee again.
Who approves the septic system for a new house?
The Erie County Department of Health, from plans by a licensed design professional, with a $300 application fee. The town needs that approval before it will issue the building permit.
Does a new pool need an alarm?
Yes. Pools installed or substantially modified after December 14, 2006 must have an approved alarm, and the pool permit is $150 in-ground or $50 above ground.
Alden permit search and official resources
Permit files and certificates of occupancy are kept by the Building Department. Copies of records can be requested in writing from the Town of Alden FOIL Office, 3311 Wende Road; the town acknowledges a request within five business days and charges $0.25 per photocopied page. Village permits are held by the Village of Alden, which has its own FOIL form.
Inspections are where schedules slip.
Get a free quote →- Town of Alden Building Department
- Permit requirements for new houses
- Required inspections
- Building Department forms
- Building Department fees (adopted October 6, 2025)
- Zoning requirements and setbacks
- Swimming pool alarm requirement
- Alden Planning Board
- Alden Zoning Board of Appeals
- Town Clerk and FOIL requests
- Code of the Town of Alden (eCode360)
- Village of Alden Building Department
- Erie County Department of Health septic systems
- NYS Uniform Code adoption notice
Simplify Town of Alden permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in New York. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Town of Alden sooner?
Let Alliance prepare, file, and track your Town of Alden permits while your crew stays on the job.
More New York permitting guides
Town of Amherst
Read guide →Town of Aurora
Read guide →City of Buffalo
Read guide →City of Amsterdam Building Permit Guide
Read guide →City of Auburn Building Permit Guide
Read guide →Town of Babylon Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Town of Alden permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.