Cedar County, Missouri Building Permit Guide

To get a building permit in Cedar County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Cedar County, Missouri has no countywide zoning or building permit; Stockton and El Dorado Springs permit construction in town, and a county moratorium on data centers and large energy projects runs to September 2027 unless it is ended or extended.

County: Cedar County CommissionSeptic: Cedar County Health DepartmentPhone: 417-276-6700 ext. 221
County building permit
None; no county zoning
Moratorium
Data centers, solar, wind, batteries to Sept. 2027
Stockton codes
2018 I-Codes, 2017 NEC
El Dorado Springs codes
2006 IBC and IRC

Cedar County is a third-class county with no countywide planning and zoning and no county building permit. Stockton and El Dorado Springs each run their own permits and inspections. On unincorporated land, a 12-month moratorium adopted September 8, 2026 stops permits for data centers and for solar, wind and battery storage facilities, and the Cedar County Health Department permits septic systems.

Cedar County building department: who handles permitting

The County Commission meets every Monday at the courthouse, 113 South St., Stockton (417-276-6700 ext. 221), and its minutes are published in the local newspapers. The state emergency agency lists the presiding commissioner at the courthouse as the county floodplain administrator. Four towns lie in the county:

Who permits building work in Cedar County’s towns (2025 Census estimates)
PlaceWho permits building work
El Dorado Springs (3,642)City Building Code Official (417-876-5376); City Hall 417-876-2521; 2006 International Building and Residential Codes
Stockton (1,825)Apply to the City Clerk at City Hall, 1424 South St. (417-276-5210); the Building Inspector reviews plans under the 2018 International Codes and the 2017 National Electrical Code (code section last amended October 27, 2025)
Jerico Springs (168), Umber View Heights (43)No town code or permit form is published online; ask the village clerk before building

Short on time to read all of this?

Get a free quote →

City permit fees in Stockton and El Dorado Springs

Stockton charges by project cost under a table adopted March 24, 2025 (City Code Sec. 500.080), paid to the City Clerk when you apply:

City of Stockton building permit fees
Project costPermit fee
Up to $1,000$17.25
$1,001 to $25,000Rises $5.75 for each further $1,000 (e.g. $69.00 at $10,000; $155.25 at $25,000)
$25,001 to $50,000Rises $4.60 for each further $1,000, reaching $270.25 at $50,000
Over $50,000An additional $5.00 per thousand
Fence, non-electric sign, storm shelter, portable shed or outbuilding$35.00

For example, a $20,000 project falls in the $19,001–$20,000 row and pays $126.50. Starting without a permit carries a $250 fine, and the Building Inspector will not issue a permit for a structure without access to City sewer or water.

Not sure this scope needs a permit?

Get a free quote →

El Dorado Springs charges $10 for work up to $500 and $12 up to $1,000, then $6 per $1,000 up to $10,000 and $5 per $1,000 above that (City Code Sec. 8-22). For new construction the cost used is at least $65 per sq ft of floor area, $40 for a basement and $50 for a garage. Remodeling that touches no wiring, plumbing, structure or roof needs no permit; other fees include $20 minimum electrical, $30 trailer hook-up, $30 demolition and $20 to move a building.

Moratorium, septic and floodplain

Energy and data-center moratorium: the County Commission’s order of September 8, 2026 bars building, starting, operating or expanding data centers, solar and wind energy systems and battery storage facilities in unincorporated Cedar County, including issuing any permits for them, for 12 months from adoption. The Commission may end it early or extend it once by up to six months. Projects already operating, or where foundation or other permanent work (not just grading) began before the order, are exempt, and the solar and battery limits do not cover on-site systems of 25 kilowatts or less. A data center here means a facility of 2,500 sq ft or more or with 250 kilowatts or more of IT power. The Commission holds a public forum on November 2, 2026 at 7 p.m. at the Family Life Center, 1607 S. Park St., El Dorado Springs.

Septic systems: the state health department lists the Cedar County Health Department, 1317 S. Hwy 32, Suite B, El Dorado Springs (417-876-5477), as the permitting authority under a county ordinance; it also keeps Monday hours at 807 Owen Mill Rd., Stockton. The state says its onsite application fees are on hold from August 28, 2026 under the amended section 701.046 RSMo; ask the Health Department what it charges.

Rather talk it over?

Call 1-855-478-4290 →

Floodplain: Cedar County takes part in the National Flood Insurance Program with flood maps dated January 6, 2011, as do El Dorado Springs and Stockton.

Starting a project in Cedar County

1. Find the jurisdiction

Check whether the lot is inside Stockton, El Dorado Springs or a village, or on county land.

2. Check the moratorium

Energy and data-center projects on county land cannot be permitted until the moratorium ends.

3. Septic

Apply to the Cedar County Health Department before any onsite system work.

4. In Stockton

Give the Building Inspector two sets of house plans and a site plan (three sets for commercial) and pay the fee at City Hall.

Missouri building code

Missouri has no mandatory statewide building code for private construction: a county, fire protection district or municipality may adopt one (usually by reference under RSMo 67.280), and in parts of the state none has. Building codes in Missouri

Cedar County permit FAQs

Does Cedar County, Missouri require a building permit?

No. The county has no countywide zoning or building code; Stockton and El Dorado Springs permit work inside their limits.

Rather not deal with the Cedar County building department?

Get a free quote →

Is there a data center or solar moratorium in Cedar County?

Yes. The order of September 8, 2026 halts data centers, solar, wind and battery storage facilities on unincorporated land for 12 months, with one possible extension of up to six months.

How much is a building permit in Stockton?

$17.25 for work up to $1,000, rising by cost to $270.25 at $50,000; a $20,000 project pays $126.50.

Which codes does Stockton use?

The 2018 International Building, Residential, Plumbing and Mechanical Codes and the 2017 National Electrical Code.

Who permits septic systems in Cedar County?

The Cedar County Health Department in El Dorado Springs (417-876-5477), under a county ordinance.

Want this handled start to finish?

Get a free quote →

Cedar County permit search and official resources

Simplify Cedar County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Inspections are where schedules slip.

Get a free quote →

Alliance Permitting is a permit documentation and submission company in Missouri. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Cedar County sooner?

Let Alliance prepare, file, and track your Cedar County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Cedar County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.