To get a building permit in Callaway County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Callaway County has no planning, zoning or building permits for unincorporated land; septic, floodplain and road-crossing permits are the county approvals, and the cities issue their own building permits.

Authority: Callaway County CommissionBuilding code: None adopted for unincorporated landPhone: 573-642-0737
County building permit
Not required outside the cities
Septic permits
Callaway Sewer District, 573-491-1118
Floodplain permits
Emergency Management, 573-592-2480
Flood elevation
Lowest floor 2 ft above base flood

Callaway County has not adopted planning or zoning, and the County Commission states that no building or occupancy permits are required in its unincorporated areas. What the county does regulate is sewage systems, building in mapped flood areas, lines crossing county roads and 911 addresses. Fulton, Holts Summit, Auxvasse, New Bloomfield and the other cities set their own permit rules inside their limits.

Callaway County building department: who handles permitting

Outside the cities, nobody issues a building permit: the County Commission’s signed planning and zoning letter, current for 2026, says the county has not adopted planning or zoning and that building and occupancy permits are not required in unincorporated areas. The Commission’s office is at 10 East 5th Street, Room 301, Fulton (573-642-0737).

The same letter names the cities and villages that may have their own zoning, building or occupancy permits. It also lists Lake Mykee, which FEMA’s Community Status Book records as disincorporated. Populations below are Census Bureau Vintage 2025 estimates.

Short on time to read all of this?

Get a free quote →
Who handles building permits in Callaway County
PlaceWho permits building work
Fulton (12,853)City of Fulton Planning and Protective Services, Public Works Engineering Division, City Hall, 18 E. 4th Street; 2015 International Codes and 2017 NEC; a new home is $2 per $1,000 of ICC valuation ($40 minimum); 573-592-3111
Holts Summit (4,773)City of Holts Summit: its code has adopted the 2012 International Codes since June 1, 2017, without requiring sprinklers in new homes; City Hall, 213 S. Summit Drive, 573-896-5600
Auxvasse (1,029)City of Auxvasse: its zoning chapter requires a written application and a permit from the building commissioner/inspector before building, altering or demolishing; City Hall, 573-386-2227
New Bloomfield (747)City of New Bloomfield: a City Hall permit is needed for any structure over 100 sq ft of usable floor space, not counting decks, patios or concrete pads (Ord. 596-05); 573-491-3614
Mokane (188)The published sources do not say; City Hall, 509 Hilltop Drive, 573-676-5050
Kingdom City (135)Village of Kingdom City: its code adopts the 2018 International Building and Property Maintenance Codes and an International Plumbing Code (1997 edition); the county lists 573-592-0588
Jefferson City (22 residents here; 42,467 in Cole County)City of Jefferson Building Regulations Division, online through GovWell; 573-634-6410
Unincorporated Callaway CountyNo county building or occupancy permit

What the county does require

County approvals

  • Sewage system permit under the county sewage ordinance
  • Floodplain development permit for work in a mapped flood area
  • Utility right-of-way permit to cross a county road with water, phone, electric or other lines
  • Road use agreement with the Road & Bridge Engineer
  • 911 address for each home or business building

Not required in unincorporated areas

  • County building permit
  • County occupancy permit
  • County zoning approval

Not sure this scope needs a permit?

Get a free quote →

The Callaway County Health Department (573-642-6881) runs the county’s food and lodging ordinances, which matter for restaurants, food businesses and lodging.

Septic, floodplain and addressing rules

Septic systems: the Commission’s 2026 letter sends sewage ordinance and permit questions to the Callaway Sewer District at 573-491-1118 (leave a message). The Missouri Department of Health and Senior Services lists Callaway County as a local authority with its own onsite wastewater ordinance, so the county’s rules may go beyond the state minimum.

Floodplain: Callaway County takes part in the National Flood Insurance Program on flood maps dated September 5, 2012, and Callaway County Emergency Management handles the floodplain ordinance and permits (573-592-2480). Under Floodplain Management Ordinance 44CFR-21 of October 28, 2021, a new or substantially improved home in a mapped flood area must have its lowest floor, including any basement, 2 ft above the base flood elevation, certified by a Missouri-licensed land surveyor, engineer or architect. Non-residential buildings must be raised to the same height or floodproofed, with an engineer’s or architect’s certification. Inside the county, FEMA lists Fulton, Holts Summit, Jefferson City, Kingdom City and Mokane as participating, while New Bloomfield is in its list of communities not participating.

Addresses and driveways: under the road naming and 911 addressing ordinance approved on January 13, 2026, the county is the addressing authority and every home and business building must have an address. No address is approved until the owner meets the county’s road specifications, including Appendix B on driveway locations and culverts.

Rather talk it over?

Call 1-855-478-4290 →

Building on unincorporated land in Callaway County

1. Check the city limits

If the site is inside Fulton, Holts Summit, Auxvasse, New Bloomfield or another city, that city’s permit rules apply instead.

2. Plan the driveway and address

Lay out the driveway and any culvert to the county road specifications before asking for a 911 address.

3. Get the sewage permit

Call the Callaway Sewer District (573-491-1118) about the permit for a new or repaired septic system.

4. Check the flood map

For a site in a mapped flood area, get a floodplain development permit from Emergency Management and plan the floor 2 ft above the base flood elevation.

5. Arrange road crossings

Lines crossing a county road need a utility right-of-way permit from the Road & Bridge Engineer (573-642-0740).

Missouri building code

Missouri has no mandatory statewide building code for private construction: a county, fire protection district or municipality may adopt one (usually by reference under RSMo 67.280), and in parts of the state none has. Building codes in Missouri

Callaway County permit FAQs

Do I need a building permit in unincorporated Callaway County?

No. The County Commission states that building and occupancy permits are not required outside the incorporated cities and villages, and the county has no planning or zoning.

Rather not deal with the Callaway County building department?

Get a free quote →

Who issues septic permits in Callaway County?

The Commission’s 2026 letter directs sewage ordinance and permit questions to the Callaway Sewer District at 573-491-1118.

How high must a house be built in a Callaway County flood zone?

The lowest floor, including any basement, must be 2 ft above the base flood elevation and certified by a Missouri-licensed surveyor, engineer or architect, and a floodplain development permit is needed from Emergency Management.

Who issues building permits in Fulton?

The City of Fulton’s Planning and Protective Services office at City Hall, 18 E. 4th Street (573-592-3111), under the 2015 International Codes.

Do I need a permit for a shed in New Bloomfield?

Yes if it has more than 100 sq ft of usable floor space; decks, patios and concrete pads are not counted. Permits come from New Bloomfield City Hall.

How do I get an address for a new house?

Callaway County assigns 911 addresses, but only after the driveway and culvert meet the county road specifications.

Want this handled start to finish?

Get a free quote →

Callaway County permit search and official resources

Inspections are where schedules slip.

Get a free quote →

Simplify Callaway County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Missouri. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Callaway County sooner?

Let Alliance prepare, file, and track your Callaway County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Callaway County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.