Callaway County has not adopted planning or zoning, and the County Commission states that no building or occupancy permits are required in its unincorporated areas. What the county does regulate is sewage systems, building in mapped flood areas, lines crossing county roads and 911 addresses. Fulton, Holts Summit, Auxvasse, New Bloomfield and the other cities set their own permit rules inside their limits.
Callaway County building department: who handles permitting
Outside the cities, nobody issues a building permit: the County Commission’s signed planning and zoning letter, current for 2026, says the county has not adopted planning or zoning and that building and occupancy permits are not required in unincorporated areas. The Commission’s office is at 10 East 5th Street, Room 301, Fulton (573-642-0737).
The same letter names the cities and villages that may have their own zoning, building or occupancy permits. It also lists Lake Mykee, which FEMA’s Community Status Book records as disincorporated. Populations below are Census Bureau Vintage 2025 estimates.
Short on time to read all of this?
Get a free quote →| Place | Who permits building work |
|---|---|
| Fulton (12,853) | City of Fulton Planning and Protective Services, Public Works Engineering Division, City Hall, 18 E. 4th Street; 2015 International Codes and 2017 NEC; a new home is $2 per $1,000 of ICC valuation ($40 minimum); 573-592-3111 |
| Holts Summit (4,773) | City of Holts Summit: its code has adopted the 2012 International Codes since June 1, 2017, without requiring sprinklers in new homes; City Hall, 213 S. Summit Drive, 573-896-5600 |
| Auxvasse (1,029) | City of Auxvasse: its zoning chapter requires a written application and a permit from the building commissioner/inspector before building, altering or demolishing; City Hall, 573-386-2227 |
| New Bloomfield (747) | City of New Bloomfield: a City Hall permit is needed for any structure over 100 sq ft of usable floor space, not counting decks, patios or concrete pads (Ord. 596-05); 573-491-3614 |
| Mokane (188) | The published sources do not say; City Hall, 509 Hilltop Drive, 573-676-5050 |
| Kingdom City (135) | Village of Kingdom City: its code adopts the 2018 International Building and Property Maintenance Codes and an International Plumbing Code (1997 edition); the county lists 573-592-0588 |
| Jefferson City (22 residents here; 42,467 in Cole County) | City of Jefferson Building Regulations Division, online through GovWell; 573-634-6410 |
| Unincorporated Callaway County | No county building or occupancy permit |
What the county does require
County approvals
- Sewage system permit under the county sewage ordinance
- Floodplain development permit for work in a mapped flood area
- Utility right-of-way permit to cross a county road with water, phone, electric or other lines
- Road use agreement with the Road & Bridge Engineer
- 911 address for each home or business building
Not required in unincorporated areas
- County building permit
- County occupancy permit
- County zoning approval
Not sure this scope needs a permit?
Get a free quote →The Callaway County Health Department (573-642-6881) runs the county’s food and lodging ordinances, which matter for restaurants, food businesses and lodging.
Septic, floodplain and addressing rules
Septic systems: the Commission’s 2026 letter sends sewage ordinance and permit questions to the Callaway Sewer District at 573-491-1118 (leave a message). The Missouri Department of Health and Senior Services lists Callaway County as a local authority with its own onsite wastewater ordinance, so the county’s rules may go beyond the state minimum.
Floodplain: Callaway County takes part in the National Flood Insurance Program on flood maps dated September 5, 2012, and Callaway County Emergency Management handles the floodplain ordinance and permits (573-592-2480). Under Floodplain Management Ordinance 44CFR-21 of October 28, 2021, a new or substantially improved home in a mapped flood area must have its lowest floor, including any basement, 2 ft above the base flood elevation, certified by a Missouri-licensed land surveyor, engineer or architect. Non-residential buildings must be raised to the same height or floodproofed, with an engineer’s or architect’s certification. Inside the county, FEMA lists Fulton, Holts Summit, Jefferson City, Kingdom City and Mokane as participating, while New Bloomfield is in its list of communities not participating.
Addresses and driveways: under the road naming and 911 addressing ordinance approved on January 13, 2026, the county is the addressing authority and every home and business building must have an address. No address is approved until the owner meets the county’s road specifications, including Appendix B on driveway locations and culverts.
Rather talk it over?
Call 1-855-478-4290 →Building on unincorporated land in Callaway County
If the site is inside Fulton, Holts Summit, Auxvasse, New Bloomfield or another city, that city’s permit rules apply instead.
Lay out the driveway and any culvert to the county road specifications before asking for a 911 address.
Call the Callaway Sewer District (573-491-1118) about the permit for a new or repaired septic system.
For a site in a mapped flood area, get a floodplain development permit from Emergency Management and plan the floor 2 ft above the base flood elevation.
Lines crossing a county road need a utility right-of-way permit from the Road & Bridge Engineer (573-642-0740).
Missouri building code
Missouri has no mandatory statewide building code for private construction: a county, fire protection district or municipality may adopt one (usually by reference under RSMo 67.280), and in parts of the state none has. Building codes in Missouri
Callaway County permit FAQs
Do I need a building permit in unincorporated Callaway County?
No. The County Commission states that building and occupancy permits are not required outside the incorporated cities and villages, and the county has no planning or zoning.
Rather not deal with the Callaway County building department?
Get a free quote →Who issues septic permits in Callaway County?
The Commission’s 2026 letter directs sewage ordinance and permit questions to the Callaway Sewer District at 573-491-1118.
How high must a house be built in a Callaway County flood zone?
The lowest floor, including any basement, must be 2 ft above the base flood elevation and certified by a Missouri-licensed surveyor, engineer or architect, and a floodplain development permit is needed from Emergency Management.
Who issues building permits in Fulton?
The City of Fulton’s Planning and Protective Services office at City Hall, 18 E. 4th Street (573-592-3111), under the 2015 International Codes.
Do I need a permit for a shed in New Bloomfield?
Yes if it has more than 100 sq ft of usable floor space; decks, patios and concrete pads are not counted. Permits come from New Bloomfield City Hall.
How do I get an address for a new house?
Callaway County assigns 911 addresses, but only after the driveway and culvert meet the county road specifications.
Want this handled start to finish?
Get a free quote →Callaway County permit search and official resources
- Callaway County planning and zoning information
- Callaway County Commission letter, planning and zoning current as of 2026
- Callaway County Floodplain Management Ordinance 44CFR-21 (2021)
- Callaway County road naming and 911 addressing ordinance (January 2026)
- Callaway County ordinances, policies and resolutions
- Missouri DHSS onsite wastewater permitting authority by county
- SEMA emergency management and floodplain contacts, Callaway County
- FEMA Community Status Book, Missouri
- City of Fulton Public Works and building permits
- City of Holts Summit code of ordinances
- City of New Bloomfield ordinances, including building permits
- Village of Kingdom City building regulations (Chapter 500)
- City of Jefferson building permits
Inspections are where schedules slip.
Get a free quote →Simplify Callaway County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Missouri. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Callaway County sooner?
Let Alliance prepare, file, and track your Callaway County permits while your crew stays on the job.
More Missouri permitting guides
Fulton
Read guide →Clay County
Read guide →Greene County
Read guide →Camden County Building Permit Guide
Read guide →Cape Girardeau Building Permit Guide
Read guide →Cape Girardeau County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Callaway County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.