Skip to main content

Webster County, Mississippi Building Permit Guide

Webster County governs from Walthall through its Board of Supervisors, whose clerk is the Chancery Clerk; Eupora, Maben, Mathiston and Mantee each take building permit applications for land inside their limits.

Authority: Webster County Board of Supervisors (unincorporated area)Largest town: Eupora (2018 IBC, valuation fees)Phone: 662-258-4131
County office
6333 MS Hwy 9, Ste 123, Walthall
Eupora permits
Building Department, 662-258-2291
Flood program
County, Eupora and Mathiston participate
Septic
Mississippi State Department of Health

For land outside the towns, state law requires Webster County’s Board of Supervisors to require a permit for construction; the Board is reached through the Chancery Clerk at 6333 MS Hwy 9, Suite 123, Walthall (662-258-4131). Inside Eupora, the city’s Building Department charges $3 per $1,000 of value for most home projects, so a $150,000 house costs $450.

Who issues permits in Webster County?

Webster County’s website lists a directory of county offices, a parcel and address map and tax records, but no building, zoning or floodplain office. The Chancery Clerk serves as clerk of the Board of Supervisors, so questions about a county permit or a matter for the Board go there first.

Webster County jurisdictions
AreaWho handles building permits
Unincorporated Webster CountyBoard of Supervisors, through the Chancery Clerk, 6333 MS Hwy 9, Suite 123, Walthall, MS 39771; 662-258-4131, fax 662-258-9635
Eupora (2,116 residents, 2025)City of Eupora Building Department, City Hall, 390 Clark Avenue; 662-258-2291
Mathiston (823 in Webster County; the rest is in Choctaw County)Town of Mathiston, 41 Mathis Drive; online Building Permit Application; 662-263-4898
Maben (304 in Webster County; the rest is in Oktibbeha County)The Town Clerk, under Maben’s zoning ordinance; City Hall, 711 2nd Avenue, 662-263-4212
Mantee (249)The Town Clerk, for new houses and commercial buildings; townofmantee@gmail.com
Walthall (117), the county seatThe published sources do not say who permits in the village; ask the town clerk

Short on time to read all of this?

Get a free quote →

The county lists Willis Engineering of Grenada (662-226-1081) as County Engineer. Septic systems where there is no sewer are permitted by the Mississippi State Department of Health; its Wastewater Call Center is 1-855-220-0192.

Building permits and fees in Eupora

Eupora’s Zoning and Building Ordinance makes the Zoning and Building Administrator the official who issues building permits, and the city lists the 2018 International Building Code and 2018 International Property Maintenance Code as its adopted codes. A permit is needed for any residential addition or alteration over $2,500, every new dwelling unit including accessory dwellings, any work involving electrical, plumbing or structural changes, and any commercial or mixed-use work over $1,000 or demolition.

The city’s January 2026 application form exempts re-roofing, decks, walks and driveways no more than 30 inches above grade, prefabricated above-ground pools under 24 inches deep and no larger than 5,000 gallons, window replacement without structural change (outside the historic district) and finish work such as painting, tile, carpet and cabinets.

City of Eupora building permit fees
ProjectFee
New dwelling or residential work, low value$50 flat (up to $15,000 on the city’s fee sheet; under $2,500 on its 2025 fee schedule)
Accessory structures: sheds, outbuildings, fences$50 flat
Residential, up to $1,000,000 of value$3 per $1,000 of valuation
Residential, over $1,000,000$4 per $1,000 above $1,000,000
Commercial, up to $25,000$100 flat (fee sheet)
Commercial, up to $5,000,000$4 per $1,000 of valuation
Commercial, over $5,000,000$20,000 plus $5 for each additional $1,000
Certificate of occupancy, new business or residence$20 ($15 for a change of name or owner)
Demolition$50 for an entire structure, $25 for interior only

Not sure this scope needs a permit?

Get a free quote →

The city’s fee calculation sheet (as of January 7, 2025) and its 2025 fine and fee schedule set different lower limits for the $3 rate, so ask the Building Department which applies to a small job. For a typical new house both agree: a $150,000 home pays 150 × $3, or $450.

A permit becomes invalid if work has not started within 90 days or stops for 90 days, and every permit expires one year after it is issued. In the special flood hazard area the city requires the lowest floor to be 1.5 feet above the base flood elevation, with an elevation certificate before the foundation inspection and again before the final inspection. Before a certificate of occupancy, the city’s pre-occupancy checklist calls for working smoke detectors, at least one 5 lb ABC fire extinguisher per residential unit and GFCI outlets within 6 feet of any water source. Work on a property in Eupora’s historic district also needs a Certificate of Appropriateness.

Maben, Mathiston, Mantee and flood maps

Maben: the town’s posted zoning ordinance, an older text prepared with the Golden Triangle Planning and Development District, makes it unlawful to excavate, build, move or alter a building until the Town Clerk has issued a building permit, and a permit expires if work has not begun within 180 days. The Town Clerk is to act on a complete application within seven days. City Hall is open 8:00 a.m. to 4:30 p.m., closed from noon to 1:00 p.m.

Mathiston: the town takes building permit applications online through its state-hosted online services portal, next to its water and garbage service forms.

Rather talk it over?

Call 1-855-478-4290 →

Mantee: the Board of Aldermen approved a permit form on March 2, 2026 for each new house and commercial building in town limits. It does not cover outbuildings, additions or renovations. The fee is $10 for a residential permit and $20 for a commercial one, and the form needs a deed or proof of ownership, proof of compliance with water and sewer or septic rules, a sketch of the lot and building, and proof of a Mississippi 811 locate request.

The form carries out Mantee’s Dwelling Ordinance (No. 2601, adopted March 2, 2026). The Mayor and Board of Aldermen must approve each new dwelling at a regular meeting, on a deed, a building permit, proof that the home was or will be built to a nationally recognized building code and proof of water and sewer or septic compliance. A permanent dwelling needs at least 390 square feet of heated living area, only one dwelling, permanent or temporary, is allowed per acre, modular and tiny homes must sit on a permanent foundation such as a concrete slab, and campers and RVs cannot be used as permanent homes. A violation carries a fine of at least $25, and each day counts as a separate offense.

Flood insurance program: FEMA’s Community Status Book lists Webster County, Eupora and Mathiston as participants, each with a January 6, 2010 map on which no base flood elevations were determined. Maben, Mantee and Walthall are not listed.

How to start a project in Webster County

1. Locate the parcel

Use the county’s parcel and address map to see whether the land is inside a town or in the unincorporated county.

2. In Eupora

Value the project, file the city’s building permit application with a site and building plan for new construction, and schedule inspections with the Building Department.

3. In Mathiston, Maben or Mantee

Apply online in Mathiston, or to the Town Clerk in Maben or Mantee, before work starts.

4. On county land

Call the Chancery Clerk’s office about the county permit and have the contractor’s licence and tax numbers ready.

5. Septic

Without sewer, apply to the State Department of Health for the onsite wastewater system.

Rather not deal with the Webster County building department?

Get a free quote →

Mississippi building code

Some work is exempt statewide: farm structures once the owner files an affidavit (Mississippi Code §17-2-7), and manufactured housing built to federal standards, certain industrial and utility facilities, buildings on non-public fairgrounds and hunting or fishing camps with an owner’s affidavit (§17-2-9). None of these exemptions reaches floodplain rules. The state minimum codes are the Mississippi Building Code and Mississippi Residential Code, the residential code drawn from the 2021 International Residential Code. How building codes apply in Mississippi

Want this handled start to finish?

Get a free quote →

Official Webster County permit resources

Inspections are where schedules slip.

Get a free quote →

Webster County permit FAQs

How much is a building permit in Eupora?

For most home projects $3 per $1,000 of value, so $450 for a $150,000 house; small jobs and accessory structures pay a $50 flat fee.

Do I need a permit for a new roof in Eupora?

Re-roofing is on the exempt list of Eupora’s January 2026 building permit application.

How long is a Eupora building permit good for?

It lapses if work does not start within 90 days or stops for 90 days, and expires one year after issue.

Who issues building permits in Maben?

The Town Clerk, under Maben’s zoning ordinance; call City Hall at 662-263-4212.

Who do I call about a permit on county land in Webster County?

The Chancery Clerk, who is clerk of the Board of Supervisors, at 662-258-4131.

Simplify Webster County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Mississippi. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Webster County sooner?

Let Alliance prepare, file, and track your Webster County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Webster County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.