The Rockland Building Department, at Town Hall, 242 Union Street (781-871-1874 ext. 1191), issues building, wiring, plumbing and gas permits through the PermitEyes online system. A residential building permit costs $30 for the first $1,000 of construction cost and $15 for each further $1,000, with a $50 minimum, under fee sheets the Select Board approved on March 4, 2025. The department does not carry out inspections on Fridays.
What requires a building permit in Rockland?
Rockland is a Plymouth County town of about 17,900 people. Its residential fee sheet is the clearest list of what the department permits: new one- and two-family dwellings, alterations and additions (roofing, siding, sheds, above-ground and in-ground pools, wood and coal stoves, fireplaces, chimneys and fire detection systems), detached and attached garages, decks, demolition, temporary construction trailers and tents, and “any other project that requires a permit”. Mechanical, sheet metal and trench permits are priced on the same sheet, and the wiring, plumbing and gas inspectors issue their own permits.
Permit required
- New homes, additions, garages and alterations
- Roofs, siding, windows, doors and decks (the Express Permit form)
- Sheds, ramps, tents, solar and winterization work
- All pools: a building permit and a wiring permit
- Demolition, trenches, mechanical and sheet metal work
- Any development in the Floodplain Overlay District, fences and sheds included
Separate sign-offs
- Fire alarm and sprinkler work also needs a Rockland Fire Department permit
- Work within 100 feet of a wetland goes to the Conservation Commission
- Digging in a town road or sidewalk needs a Road and Sidewalk Opening Permit from the Select Board
What Rockland decides and what the state holds
The building code itself is 780 CMR, written by the state Board of Building Regulations and Standards, and Rockland cannot change it. What the Town controls is the local layer: permit fees (set by Select Board vote), the Zoning Bylaw (Chapter 415, amended through the May 4, 2026 Annual Town Meeting), the local Wetlands Protection Bylaw (Chapter 407) and the Floodplain Overlay District adopted at the September 13, 2021 Special Town Meeting. Rockland’s codified bylaws contain no energy-code chapter and the Building Department pages do not name a Stretch or Specialized energy code, so ask the department which energy path applies to your project.
Rockland building department: who handles permitting
The Building Department houses the Inspector of Buildings and the offices of the Wiring Inspector, the Plumbing Inspector and the Gas Inspector. Thomas Ruble is the Building Commissioner; he is also the Zoning Enforcement Officer, and the floodplain administrator under the Zoning Bylaw.
| Detail | Information |
|---|---|
| Office | Town Hall, 242 Union Street, Rockland, MA 02370 |
| Phone | 781-871-1874 ext. 1191 (the fee sheets also list 781-871-0596); fax 781-616-6824 |
| Hours | Monday to Friday 8:30 am to noon and 1 to 4:30 pm; open until 8 pm on the first and third Tuesday of each month; closed Fridays in summer |
| Online permits | PermitEyes (Full Circle Technologies) |
| Payment | Credit or debit card or e-check online, or at the office |
| Building Commissioner | Thomas Ruble |
Short on time to read all of this?
Get a free quote →Rockland permit types and the approvals that come first
Every building permit in Rockland is filed in PermitEyes. You register an account, complete all fields marked with a red asterisk and submit; the status reads “pending” when the filing went through and “partially submitted” when something is missing. Required documents are attached in the Transactions Monitor. If staff key in a paper application, or enter an online one for you, the fee sheets add $25.
Residential permits
For small jobs the department points homeowners and contractors to the Express Permit: roofs, decks, ramps, windows, doors, tents, solar, sheds, winterization, siding and pools. Larger jobs need construction documents and a plot plan. An owner who supervises the work on a one- or two-family home where they live, or intend to live, signs the Town’s Homeowner Exemption Eligibility Affidavit; under it, someone who builds more than one home in two years does not count as a homeowner, and the owner acts as supervisor for anyone they hire.
Pools follow the Town’s 2025 pool packet: a plot plan showing the pool at least 10 feet from every lot line and existing building and 25 feet from the front line; a 4-foot fence for in-ground pools and for above-ground pools deeper than 24 inches; the fence permit filed with the building permit; and Conservation Commission review for any pool within 100 feet of a wetland and for every in-ground pool. Under the Zoning Bylaw, a detached accessory building or accessory dwelling unit under 24 feet tall and under 400 square feet sits at least 10 feet from side and rear lines, and a larger one at least 15 feet.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
Buildings with three or more dwelling units are charged at the commercial rate. Under Section 415-58, Planning Board site plan approval comes before the building permit for new buildings other than single-family homes and their accessory structures; interior repairs and exterior work without a major structural change are exempt. The Design Review Board, made up of the five Planning Board members, also gives a non-binding recommendation on every commercial, industrial, public or institutional building that is built or substantially altered. Sprinkler and fire alarm systems need a Fire Department permit in addition to the building permit.
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Zoning Board of Appeals and Planning Board: the ZBA grants variances and most special permits; the Planning Board handles site plan review, planned unit developments, senior housing developments and the MBTA Communities Mixed-Use District. Appeals of a Building Commissioner decision go to the ZBA within 30 days.
- Conservation Commission: work within 100 feet of a wetland or water body needs a filing under the state act and Rockland’s Chapter 407; land within 200 feet of rivers and streams is presumed important. The Building Commissioner will not sign a building permit or certificate of occupancy on land under an open order of conditions without the Commission’s written consent.
- Board of Health: septic systems under Title 5; the wetlands bylaw also reaches a new-construction Title 5 system placed within 100 feet of a protected area.
- Historic review: the Town has a Historical Commission, but its codified bylaws contain no demolition-delay or local historic district chapter. Historic approvals are on the list of documents to attach where they apply.
- Streets: a Road and Sidewalk Opening Permit from the Select Board for any excavation on Town property.
Rockland permit fees
Rockland posts four fee sheets, all approved by the Select Board on March 4, 2025. The building fee is worked out during the department’s review and sent as an emailed invoice. Starting work before getting a required permit doubles the fee, and the Zoning Bylaw separately makes building without a permit an offense with a fine of twice the permit fee.
| Work | Fee |
|---|---|
| Residential minimum | $50 |
| New dwelling (1 or 2 units), additions, alterations, garages, demolition | $30 for the first $1,000 of cost, plus $15 per additional $1,000 |
| Decks | $100 per deck |
| Commercial new construction, additions, tenant build-out | $15 per $1,000 of construction cost ($50 minimum) |
| Commercial alterations to an existing building | $50 for the first $1,000, plus $20 per additional $1,000 |
| Sprinkler system | $100 plus $4 per head |
| Mechanical or sheet metal permit | $50 for one- and two-family; $12 per $1,000 commercial |
| Certificate of occupancy | $50 residential; $60 commercial |
| Re-inspection | $45 |
| Trench permit | $50 |
| Temporary construction trailer or tent | $50 up to 6 months; $60 longer |
| Paper application entered by staff / reprinted permit | $25 / $20 |
| Temporary residential trailer after a fire | $50 |
| Certificate of inspection, multi-family / hotels, inns, rest homes and similar | $75 for the first 3 units plus $25 each / $75 plus $2 per room |
| Work started without a permit | Double the normal fee |
Example: a $20,000 addition to a single-family house costs $30 for the first $1,000 plus 19 × $15 = $285, for a building permit fee of $315.
Rather talk it over?
Call 1-855-478-4290 →Expiry, renewal and refunds
A permit is void if work has not started within 6 months of issue. You can renew it before the 6 months run out by writing to the Inspector of Buildings; renewal costs 10% of the original fee or $15 for residential work ($25 commercial), whichever is greater. Permit fees under $200 are not refunded; on fees over $200 the Town keeps 20% plus $50 for review costs.
Trade permits and who may pull them
Wiring, plumbing and gas permits are filed in PermitEyes and inspected by Rockland’s own plumbing and gas inspector and two wiring inspectors. Electricians, plumbers and gas fitters hold state licenses, and the contractor for building work needs a state Construction Supervisor License (plus Home Improvement Contractor registration for most work on an existing owner-occupied home).
| Work | Residential | Commercial |
|---|---|---|
| Plumbing minimum | $80 for up to 3 fixtures | $100 |
| Plumbing, each additional fixture | $15 | $20 |
| Combination water heater replacement (plumbing and gas) | $95 | $100 |
| Gas minimum, first fixture with mercury test | $55 | $70 |
| Gas, each additional fixture | $15 | $20 |
| New house, up to 11 fixtures | $200, plus $15 per extra fixture | – |
| Plumbing or gas re-inspection | $50 | $60 |
| Electrical minimum | $50 | $75 |
| Electrical, new construction or addition, first $50,000 of value | $200 (1–2 units), plus $2 per $1,000 | $300 (3+ units), plus $10 per $1,000 |
| Electrical service, first 100 amps | $50 | $75 |
| Pool wiring | $70 above ground; $100 in ground | – |
| Solar | $90 up to 20 kW, plus $1 per kW | $135 up to 30 kW, plus $1 per kW |
| Generator with switch | $50 up to 10 kW; $85 over | $80 up to 19 kW; $125 at 20 kW and over |
| Electrical re-inspection | $50 | $50 |
Rather not deal with the building department?
Get a free quote →Electrical items the sheet does not list are priced when you apply. Work done without a trade permit is charged double on both the plumbing and gas sheet and the electrical sheet.
How to apply for a Rockland building permit
Look up the district on the Town zoning map, the setbacks in Chapter 415 and whether the lot is in the Floodplain Overlay District or near a wetland.
Conservation Commission, ZBA, Planning Board site plan or Board of Health approval where the work needs it.
Create an account and start the right permit type, or the Express Permit for roofs, decks, windows, sheds and similar jobs.
Construction documents, plot plan, the workers’ compensation form, the homeowner affidavit if you are the owner-builder, and any board decisions.
After review the department emails an invoice; pay online with the green Pay Now button or at the office.
You print the issued permit yourself and keep it on site, then track sign-offs and inspections in PermitEyes.
Review, corrections and what causes delay
Staff questions arrive as PermitEyes messages, with an email telling you to log in, and only small edits are possible once an application is submitted, so ask staff for help with larger changes. Under 780 CMR 105.3.1 the building official must act on an application within 30 days of filing. Conservation hearings (held within 21 days of a complete filing), ZBA and Planning Board hearings and Fire Department permits for sprinkler or alarm work can all add time, and amendments to an issued permit are also requested through PermitEyes.
Inspections in Rockland
Inspections are scheduled through the department and tracked in PermitEyes, and none take place on Fridays. The Town’s building inspection schedule for a new house runs in this order:
- Footing, with keyway
- Foundation: an as-built plan is needed first on new construction; the Ufer ground wire is inspected before concrete where rebar is used, and the foundation after damproofing, before backfill
- Fireplace throat, where there is one
- Nailing schedule, before siding
- Rough frame, after rough wiring and plumbing are signed off; fire-rated caulking is required, not expanding foam
- Insulation, before any drywall
- Final, after the wiring, plumbing and fire finals (and the sewer sign-off on new construction)
The certificate of occupancy ($50 residential, $60 commercial) issues once every required signature is on the original building permit. A failed building inspection costs $45 to repeat.
Want this handled start to finish?
Get a free quote →Building code and local bylaws in Rockland
Rockland enforces 780 CMR, 10th edition, through its Building Commissioner. The Floodplain Overlay District in Section 415-21.5 of the Zoning Bylaw covers the special flood hazard areas on the Plymouth County flood insurance rate map dated July 3, 2024. Every development there, from new homes to fences, sheds and paving, needs a permit from the Building Commissioner, and the application must show lowest-floor elevations. The ZBA can vary the overlay’s local standards only on the findings the bylaw lists. FEMA lists Rockland as a participating community in the National Flood Insurance Program, with flood maps effective July 3, 2024.
Massachusetts has one State Building Code, 780 CMR, for every city and town; towns cannot rewrite it, though many opt into a stricter energy code. The trades run under their own state codes. Massachusetts rules
Rockland permit search and official resources
The PermitEyes public view lists Rockland building permits with the site address, permit number, description of work, application and issue dates, applicant and status. For older files, ask the Building Department or file a public records request through the Town’s NextRequest portal.
- Rockland Building Department
- PermitEyes applicant login
- PermitEyes public permit search
- Permits and fees page
- Residential building fees (March 4, 2025)
- Commercial building fees (March 4, 2025)
- Plumbing and gas fees (March 4, 2025)
- Electrical fees (March 4, 2025)
- Refund policy and permit renewal
- Building inspection schedule
- Homeowner exemption eligibility affidavit
- Pool packet (2025)
- Rockland Town Code, including Zoning (Ch. 415) and Wetlands (Ch. 407)
- Conservation Commission
- Health Department
- Public records requests
- Massachusetts State Building Code (780 CMR)
- FEMA Community Status Book, Massachusetts
Inspections are where schedules slip.
Get a free quote →Rockland building permit FAQ
Who issues building permits in Rockland, MA?
The Building Department at Town Hall, 242 Union Street (781-871-1874 ext. 1191). Thomas Ruble is the Building Commissioner.
How much does a building permit cost in Rockland?
For residential work, $30 for the first $1,000 of cost plus $15 per additional $1,000, with a $50 minimum; decks are a flat $100. Commercial new construction is $15 per $1,000.
Can I apply on paper?
Applications go through PermitEyes; if staff enter a paper application, or enter one online for you, the Town charges $25.
Can I get an inspection on a Friday?
No. The department does not inspect on Fridays, and the office itself closes on Fridays in summer.
Do I need a permit for an above-ground pool?
Yes. Every pool needs a building permit and a wiring permit; one deeper than 24 inches needs a 4-foot fence, and it must sit 10 feet from lot lines and buildings.
How long is a Rockland building permit good for?
Work must start within 6 months or the permit is void; a written renewal request before then costs 10% of the fee, with a $15 residential minimum.
Do I need a permit for a shed in the flood zone?
Yes. The Floodplain Overlay District requires a permit for all development, fences and sheds included, and the Express Permit covers sheds elsewhere in town.
How do I find an old permit for a Rockland property?
Check the PermitEyes public view, which lists permits by site address; for records not online, ask the Building Department or file a request through NextRequest.
Simplify Rockland permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Massachusetts. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Rockland sooner?
Let Alliance prepare, file, and track your Rockland permits while your crew stays on the job.
More Massachusetts permitting guides
Abington
Read guide →Bridgewater
Read guide →Brockton
Read guide →Salem Building Permit Guide
Read guide →Sandwich Building Permit Guide
Read guide →Saugus Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Rockland permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.