To get a building permit in Dyer, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Dyer’s Building Department at One Town Square takes permit applications in person, by fax or by email, registers every construction contractor for $50 and inspects building, electrical and plumbing work with its own inspectors.

Authority: Dyer Building DepartmentFiling: In person, fax or emailPhone: (219) 865-4228
Authority
Building DepartmentOne Town Square, Dyer
Hours
Mon–Fri 7:30–4:00(219) 865-4228
Contractors
$50 registrationPlus a recorded $5,000 bond
Sheds
168 sq ft maxLots under 40,000 sq ft

In the Town of Dyer, building permits come from the Building Department at One Town Square ((219) 865-4228, weekdays 7:30 a.m. to 4 p.m.). Applications go in by hand, by fax to 219-865-4378 or by email to building@townofdyer.com, and the department’s own building, electrical and plumbing inspectors check the work. Every construction contractor must register first: $50, a recorded $5,000 bond and at least $500,000 of liability insurance naming the town.

What requires a building permit in Dyer?

Dyer’s rule is short and wide: the town’s FAQ tells owners to apply for a building permit for any updates or projects on their property, and the permits page says the town requires various permits for improvement activities so the work complies with the rules that apply. Permits are issued as packets, each a set of the individual applications a given type of work needs.

Permit needed

  • New homes, additions and remodels
  • Sheds and other accessory buildings, which Ordinance 96-4 limits by lot size
  • Attached and detached garages, limited by Ordinance 96-3
  • Fences, including those along a property line; a front-yard fence in a residential district must be decorative, such as split rail, wrought iron or picket
  • Electrical and plumbing work

Other approvals

  • Contractor registration before any contractor works in town
  • The state Construction Design Release for any Class 1 building
  • IDEM stormwater permit coverage when an acre or more of land is disturbed

What Dyer decides and what the state holds

Dyer sets its own permit packets, contractor registration, fees, inspections and zoning limits on sheds, garages and fences. Indiana adopts the building codes the town enforces, licenses plumbing contractors, and issues the design release that Class 1 buildings, such as stores, offices and any building used by employees, need before construction.

Dyer building department: who handles permitting

The Building Department issues the permits, keeps contractor registrations and inspects construction, with staff building inspectors, an electrical inspector and plumbing inspectors and a building clerk who handles the paperwork. Dyer is an incorporated town in Lake County, so the Lake County Plan Commission has no permit role inside it.

Short on time to read all of this?

Get a free quote →
Dyer permit contacts
DetailInformation
OfficeBuilding Department, One Town Square, Dyer, IN 46311
Phone and fax(219) 865-4228; fax 219-865-4378
Emailbuilding@townofdyer.com
HoursMonday to Friday, 7:30 a.m. to 4 p.m.
Questions about a neighbor’s projectTown Council office, (219) 865-6108
BondsLake County Recorder, Building A, 2nd floor, 2293 N. Main Street, Crown Point; 219-755-3730; weekdays 8:30 a.m. to 4:30 p.m.

Dyer permit types

The Building Permits page posts the common packets as downloads: the Building Permit Application and the Shed Requirements sheet. Ask the department which individual applications your project’s packet contains, since a packet holds only the pieces that type of work needs.

Residential permits

  • Sheds. On a lot under 40,000 square feet, one shed of up to 168 square feet; on a larger lot, up to 336 square feet of shed space, in more than one shed if you like. Use the Shed Requirements sheet with the application.
  • Garages. An attached garage may cover 7.5% of the lot, capped at 1,200 square feet in R-1 and 1,000 in R-2; a detached garage 7% of the lot, capped at 1,100 square feet in R-1 and 900 in R-2.
  • Fences. Up to 6 feet in residential districts; over 3 feet only in side and rear yards.
  • Additions and remodels. The Building Permit Application, with the electrical and plumbing pieces of the packet where the work includes them.

Commercial permits

Stores, offices and other buildings open to the public or used by employees are Class 1 structures, so the owner obtains the Construction Design Release from the Indiana Department of Homeland Security (IDHS) before construction and then files the town’s permit packet. Dyer’s fence rules allow taller fences on business land: up to 8 feet in commercial districts and 10 feet in industrial districts, with front-yard fences allowed there.

What comes before the building permit

  • A plat of survey. The town tells every owner to keep one: it shows the property lines and the size and location of each easement, which decide where a garage or fence may go.
  • Contractor registration. Each contractor on the job must be registered for the current year.
  • Stormwater. Disturbing one acre or more, or less as part of a larger common plan of development, needs IDEM’s Construction Stormwater General Permit, filed online with a $175 Notice of Intent fee.
  • State highway access. A new driveway onto a state highway needs INDOT’s driveway permit, filed in its Electronic Permit System; a private drive costs $55 and INDOT estimates about 20 working days for review.
  • Flood zone. FEMA lists Dyer as participating in the National Flood Insurance Program, with maps effective January 18, 2012.
  • Design release. For Class 1 buildings, from IDHS.

Not sure this scope needs a permit?

Get a free quote →

Dyer permit fees

The department’s web pages publish the contractor registration charges but not the building permit fee amounts, which are not printed on the posted permit application; ask the Building Department at (219) 865-4228 for the fee on your project before you file.

Published charges on Dyer projects
ItemAmountSource
Contractor registration$50 registration feeContractor Registration page
Contractor bond$5,000, recorded in Crown PointContractor Registration page
Contractor insuranceAt least $500,000 single limit for bodily injury and property damageContractor Registration page
IDEM stormwater Notice of Intent$175, for 1 acre or more of disturbanceIDEM
INDOT private / minor commercial / major commercial driveway$55 / $150 / $600INDOT permits page
State design release (Class 1)$75 filing fee plus a processing fee, generally $0.050 per gross sq ft675 IAC 12-3-2

Dyer joined FEMA’s Community Rating System on October 1, 2014, and its current class is 8, which FEMA lists with a 10% flood insurance discount, in effect since May 1, 2019.

Trade permits and who may pull them

Dyer requires every construction contractor, of every trade, to be registered with the town before working there, and registrations are issued by year: the 2026 application is open, and the 2027 application is already posted.

Rather talk it over?

Call 1-855-478-4290 →
  • What to submit. A completed application, the $50 fee, a current $5,000 bond recorded at the Lake County Government Center, 2293 N. Main Street, Crown Point, and a certificate of insurance of at least $500,000 single limit for bodily injury and property damage, with the Town of Dyer as certificate holder.
  • Renewing a bond. If a copy of the original bond with the county recorder’s stamp is already on file, a continuation certificate for the same bond number does not need the stamp.
  • How to submit. In person or by email, with every item sent together rather than piece by piece.
  • Plumbers. Plumbing contractors also hold an Indiana license from the state Plumbing Commission, and the Building Department has plumbing inspectors on staff.
  • Electricians. Registered like other contractors; the department has its own electrical inspector.

The town’s pages do not address permits pulled by homeowners for their own work, so ask the Building Department before you plan to do a job yourself.

How to apply for a Dyer building permit

1. Check the zoning limits

Measure the lot against the shed, garage and fence rules, and use your plat of survey to find setbacks and easements.

2. Register the contractors

Each contractor files the current year’s registration with the $50 fee, recorded bond and insurance certificate.

3. Get the right packet

Download the Building Permit Application or Shed Requirements from the town site, or ask the department which applications your work needs.

4. Settle state approvals

For Class 1 buildings, obtain the IDHS design release; for an acre or more of disturbance, IDEM stormwater coverage.

5. Submit

Hand it in at One Town Square, fax it to 219-865-4378 or email it to building@townofdyer.com.

6. Build and call for inspections

Arrange each inspection with the Building Department as the work reaches it.

Review, corrections and what causes delay

Contractor paperwork sent in pieces slows registration, which is why the town asks for every item at once, and the bond must be recorded in Crown Point before it counts. A shed or garage drawn over the size limit for the lot, or a detached garage placed on an easement or within 5 feet of a side or rear line, has to be redesigned. Since January 1, 2026, Indiana law gives a unit that permits one- and two-family homes 7 business days to review plans after confirming an application is complete.

Rather not deal with the building department?

Get a free quote →

Dyer inspections

Inspections are done by the Building Department’s own staff: building inspectors for structural work, an electrical inspector and plumbing inspectors. Ask the department when the permit is issued how to request each inspection; the office answers (219) 865-4228 from 7:30 a.m. to 4 p.m. on weekdays. On Class 1 projects the state release and a complete set of released plans stay on site until occupancy.

Dyer property lines, easements and size limits

Much of what the Building Department checks on a small project is set by the town’s zoning ordinances and by where the lot lines and easements fall, and its FAQ answers the common questions.

Dyer limits on common projects
ProjectLimit
Shed, lot under 40,000 sq ftOne shed up to 168 sq ft (Ordinance 96-4)
Sheds, lot over 40,000 sq ftUp to 336 sq ft in total, more than one shed allowed
Attached garage7.5% of lot size; 1,200 sq ft max in R-1, 1,000 sq ft in R-2 (Ordinance 96-3)
Detached garage7% of lot size; 1,100 sq ft max in R-1, 900 sq ft in R-2; at least 5 ft from side and rear lines; not on an easement; 15 ft to the roof peak
Residential fenceUp to 6 ft in side and rear yards; front yard 3 ft max and decorative
Commercial / industrial fenceUp to 8 ft / 10 ft; front-yard fences allowed

Easements usually sit on private land and belong to the owner, but utility companies and the town have the right to use them. Some are limited to one utility, such as NIPSCO, but most are generic, granted by the original developer to any entity installing a utility. A neighbor has no right to use the easement on your lot unless you give it. You may fence across an easement, but if work in it requires the fence to come out, removal and any replacement are at your cost. Where there is a sidewalk, the front property line begins at its back edge, away from the street; without one, it is roughly 13.5 feet back from the street or curb, though only a survey fixes it. The owner maintains the sidewalk and the strip of grass between it and the street.

Indiana building code in Dyer

Dyer’s permits and inspections apply the state codes adopted by the Fire Prevention and Building Safety Commission, while the town’s ordinances add local rules such as Ordinance 96-3 on garages and Ordinance 96-4 on accessory buildings.

Want this handled start to finish?

Get a free quote →

Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana

Dyer permit search and official resources

For a record of a past permit or inspection, ask the Building Department by phone or at building@townofdyer.com; to find out what is being built on a nearby lot, the town directs residents to the Town Council office at (219) 865-6108.

Inspections are where schedules slip.

Get a free quote →

Dyer building permit FAQs

How big can a shed be in Dyer?

On a lot under 40,000 square feet, one shed of up to 168 square feet; on a larger lot, up to 336 square feet of shed space, in one or more sheds.

Do I need a permit for a fence?

Yes. Dyer asks for a building permit for any project on your property, and residential fences are limited to 6 feet in side and rear yards and 3 feet, decorative, in front.

How large can a detached garage be?

7% of the lot, up to 1,100 square feet in R-1 or 900 in R-2, at least 5 feet from the side and rear lines, off any easement and no more than 15 feet to the peak.

How do contractors register?

File the current year’s application with $50, a $5,000 bond recorded in Crown Point and a $500,000 insurance certificate naming the town, all at once, in person or by email.

How do I submit a permit application?

In person at One Town Square, by fax to 219-865-4378 or by email to building@townofdyer.com.

Where is my front property line?

At the back edge of the sidewalk, or about 13.5 feet back from the curb where there is no sidewalk; a survey settles it exactly.

Who do I ask about a project being built near me?

The Town Council office, (219) 865-6108.

Simplify Dyer permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Dyer sooner?

Let Alliance prepare, file, and track your Dyer permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Dyer permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.