Inside Westmont, building permits come from the Permitting Division of the Community Development Department at Village Hall, 31 W. Quincy Street (630-981-6250; permitting@westmont.il.gov; Monday to Friday, 8 a.m. to 4 p.m.). The building permit fee is a $100 base fee plus 1.5% of the construction cost, outside review and inspections, and a non-refundable application fee of $100 or 0.4% of cost is due with every submittal and credited to it. Express permits for roofs, windows, water heaters and HVAC units are typically issued in one or two business days.
What requires a building permit in Westmont?
Section 18-36 of the Westmont Municipal Code requires a permit, and the village says many residential and commercial installations, renovations and remodels need one before work begins; call the Permitting Division if unsure. The permit guides show the range: appliance replacements (water heaters, HVAC units, generators), sheds and other accessory buildings, EV chargers, fences, fire alarm, sprinkler, conveyance and hood suppression systems, driveways, patios and walkways, hen coops, new houses, parking lots, plumbing, pools and spas, roofs, signs, solar arrays, tents, waterproofing and windows and doors.
Flat-fee permits
- Fences
- Removing and replacing a driveway, patio or sidewalk with no expansion
- Generators, water heaters, furnaces and AC condensers
- Roof tear-off or a second layer, with no structural work
- Window and exterior door replacement without enlarging the opening
Valuation-based permits
- New houses and additions
- Interior remodels and structural work
- Detached garages, decks and sheds
- Commercial build-outs and new buildings
- Permanent signs
Asphalt roofs are limited to two layers. Work without a permit is fined $300 or double the permit cost, whichever is higher, on top of the permit itself. A small shed (for example 4 by 8 feet) that is not on a permanent foundation is exempt from many zoning rules, including the accessory building limit and lot coverage, though other departments’ rules still apply.
What Westmont decides and what the state holds
The Board of Trustees adopts the codes with local amendments. Westmont enforces the 2021 International Building, Residential, Fire, Mechanical, Fuel Gas, Existing Building, Property Maintenance, Swimming Pool and Spa and Energy Conservation codes, NFPA 101 (2021) and the 2020 National Electrical Code, alongside the state plumbing (2014), accessibility (2018) and energy (2024) codes. Ordinance 26-137, which amended Chapters 18 and 42 of the code on August 20, 2026, revised the village’s building and fire amendments; among other changes, a commercial building over 2,500 square feet under the existing building code must install sprinklers when the work is a Level 2 or Level 3 alteration. Plumbers and roofers carry state licenses, which the village collects at registration.
Short on time to read all of this?
Get a free quote →Westmont building department: who handles permitting
The Community Development Department has three divisions. The Permitting (Building) Division issues building, engineering, plumbing and electrical permits, reviews plans, inspects construction, administers bonds and runs contractor registration. The Planning and Zoning Division checks permits for new construction, accessory buildings and signs against the zoning ordinance and supports the Planning and Zoning Commission, and Code Enforcement handles property maintenance. Right-of-way permits are reviewed by the Village Engineer in Public Works. The Fire Department’s Fire Prevention Bureau (630-981-6402) sets fire permit requirements and fees. Unincorporated land around Westmont is permitted by DuPage County Building and Zoning (630-407-6700), which handles unincorporated areas only.
| Detail | Information |
|---|---|
| Office | Community Development Department, Village Hall, 31 W. Quincy Street, Westmont, IL 60559 |
| Phone and fax | 630-981-6250; fax 630-968-8610 |
| permitting@westmont.il.gov; right-of-way: row@westmont.il.gov | |
| Hours | Monday to Friday, 8 a.m. to 4 p.m. |
| Village Planner | 630-981-6262 |
| Water Division | 630-981-6270 (taps and water fees) |
| Village Hall main line | 630-981-6200 |
Westmont permit types
Every permit needs the application filled out completely, signed by the property owner and showing the construction value, plus three complete sets of drawings (more if the Fire Department also reviews), registration for the general contractor and every subcontractor, the application fee and any spec sheets or cut sheets staff need. Structural or commercial drawings must be stamped by an Illinois licensed structural engineer or architect. Exterior work usually also needs a legal plat of survey at its original scale and a site plan with distances to each lot line.
Residential permits
- Express permits. Roof replacements (tear-off or a second layer), window and exterior door replacements, water heaters and HVAC equipment qualify when every contractor is already registered and the submittal is complete; the $100 application fee is paid on submission and the rest at issuance.
- Accessory buildings and fences. Under the zoning ordinance amended in August 2025 (Ordinance 2025-105, effective August 25, 2025, with further amendments in 2026), a house lot may have one detached garage and two accessory buildings, together no larger than 1,250 square feet, and lot coverage stays capped at 35%. A 6-foot solid fence may extend into the front setback by 13 feet or to the front wall of the house, whichever is less, and corner lots have their own setbacks, so the village asks owners to call Planning and Zoning before applying. The permit guides predate the 2025 zoning update, and the village warns their zoning references may be out of date.
- Accessory dwelling units. ADUs are allowed on residential lots with a detached single-family house, but not with townhouses, duplexes or apartment buildings.
- New houses. A new single-family or duplex lot pays a $1,200 engineering filing fee and posts a $1,500 engineering cash bond, plus a building bond of 1% of the project cost (up to $10,000); impact fees apply to new construction on land not previously developed.
Not sure this scope needs a permit?
Get a free quote →Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
Commercial permits are filed under the Commercial work type and reviewed for building, engineering, zoning and fire. Fire alarm and sprinkler systems may be deferred submittals, but every project plan must be approved and permitted before rough inspections are booked. Commercial plan review by the village’s outside reviewer is 0.3% of construction value plus a $30 clerical fee, and new non-residential buildings post a bond of 5% of cost, up to $50,000. Elevator permits, plan review and inspections are handled by an outside agency at the applicant’s cost.
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning approvals. Variances, special uses, site plans and landscape plans go through the Planning and Zoning Commission and the Village Board; talk to the Village Planner first. A zoning verification letter is available on request.
- Engineering and stormwater. Significant exterior projects may need engineering and stormwater checklists; floodplain, wetland and riparian sites carry a filing fee set by DuPage County’s review, and a detention waiver moratorium is in effect.
- Sewer and water. Properties west of Cass Avenue are served by the Downers Grove Sanitary District (630-969-0664) and those east of it by the Flagg Creek Water Reclamation District (630-323-3299); the village may need their approvals before it issues a permit.
Westmont permit costs and fees
The village’s Fees & Bonds page gathers the typical fees from the Municipal Code (sections 18-487 to 18-490 for building and Chapter 34 for engineering) and notes they may change. The application or filing fee paid at submittal is credited to the total permit fee. If an application is withdrawn or expires after 90 days, the applicant is billed for any review costs already incurred.
Rather talk it over?
Call 1-855-478-4290 →| Work | Fee |
|---|---|
| Building permit (non-flat-fee) | $100 base + 1.5% of construction cost + outside review + inspections |
| Building application fee at submittal | $100 or 0.4% of construction cost, whichever is greater; credited |
| Flat-fee permits (fence, flatwork replacement, generator, water heater, HVAC, roof, windows and doors) | $100 plus inspection fees |
| Residential inspection or re-inspection | $50 each; first residential inspection free |
| Commercial inspection or re-inspection | $100 each |
| Residential plan exam: new house | $390 (under 3,000 sq ft), $515 (3,000 to 5,000), $1,005 (over 5,000) |
| Residential plan exam: addition / detached garage / deck or shed | $265 / $115 / $65 |
| Commercial plan exam | 0.3% of construction value, plus $30 clerical |
| Plan resubmittal | $65 |
| Temporary sign | $25 per display period |
| Engineering filing fee, new house or duplex | $1,200 |
| Excavation and grading; right-of-way excavation | $80 each |
| Contractor registration (yearly) | $50 |
| Work without a permit | $300 or double the permit fee, whichever is higher, plus the permit |
Worked example from the village’s own formula: a $20,000 kitchen remodel pays the $100 application fee at submittal (0.4% of $20,000 is only $80), and at issuance owes $100 plus 1.5% of $20,000 ($300), or $400, less the $100 already paid, plus any outside review and inspections after the first, which is free. Any project costing $25,000 or less pays the $100 minimum application fee.
Trade permits and who may pull them
Every contractor must register with the village before any permit is issued. Registration costs $50 a year and lasts one year from the date of registration. State-licensed plumbers doing interior work only and alarm installers file the form with a copy of their state license and pay no fee. All other contractors, including electricians and roofers, also post a $10,000 surety bond naming the village. Electricians must show a license from another Illinois municipality, and roofers their State of Illinois license. The trades on the registration list run from general contractors, excavators, concrete, carpentry, masonry and demolition crews to HVAC, glazing, sign, paving, landscaping, underground utility and drywall contractors. Registration is not yet available in the portal: email the documents to permitting@westmont.il.gov and a payment link follows. A contractor that fails to arrange inspections or fix non-compliant work can lose its registration and face a citation.
Rather not deal with the building department?
Get a free quote →How to apply for a Westmont building permit
Pick the guide for your project; call Planning and Zoning about setbacks, fences and accessory buildings.
Email registration documents and pay the $50 fee before applying.
Signed application with valuation, three plan sets, survey and site plan, and spec sheets.
Use the Civic Access Portal for eligible permits or file at Village Hall; packets without the fee are not accepted.
Respond to building, engineering, zoning and fire comments; resubmittals cost $65.
Pay remaining permit and inspection fees at issuance and keep approved plans on site.
Review, corrections and what causes delay
Express permits are typically issued within one or two business days, small-scale permits in 5 to 10 business days, and the village aims to finish each review of a large-scale permit within 10 business days, though seasonal demand can stretch that. Unregistered contractors and incomplete packets disqualify express handling.
Inspections and certificates in Westmont
The permit holder must schedule every inspection by calling 630-981-6250 or emailing permitting@westmont.il.gov by 3 p.m. at least one business day ahead. Inspections run Monday to Friday during business hours in a morning or afternoon slot, and approved plans and any needed equipment must be on site. Every permit needs a final inspection. A residential inspection, missed inspection or re-inspection costs at least $50 (the first residential inspection is free) and a commercial one $100. Skipping an inspection can forfeit part or all of the cash bond, and a permit becomes invalid if no inspection takes place within any six-month period. Certificates of occupancy are issued only after all inspections pass and outstanding fees are paid. Construction noise is regulated between 8 p.m. and 7 a.m.
Illinois building code in Westmont
Westmont enforces the 2021 International codes and 2020 National Electrical Code with local amendments, most recently revised by Ordinance 26-137. FEMA’s Community Status Book lists the Village of Westmont (community 170220, DuPage County) as participating in the National Flood Insurance Program, with flood maps effective August 1, 2019.
Want this handled start to finish?
Get a free quote →Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Westmont building permit FAQs
How much is a building permit in Westmont?
$100 plus 1.5% of the construction cost, plus outside review and inspection fees; simple jobs such as fences and roofs are a flat $100 plus inspections.
Can I get a roof or window permit quickly?
Yes. Express permits for roofs, windows, exterior doors, water heaters and HVAC units are typically issued within one or two business days if contractors are registered and the packet is complete.
Do contractors need to register?
Yes, every contractor, for $50 a year; most also post a $10,000 bond, while state-licensed plumbers doing interior work and alarm installers pay no fee.
How many sheds or garages can I have?
One detached garage and two accessory buildings, with a combined footprint of no more than 1,250 square feet and lot coverage under 35%.
What if I start work without a permit?
The fine is $300 or double the permit cost, whichever is higher, plus the permit fee.
How do I schedule an inspection?
Call 630-981-6250 or email the Permitting Division by 3 p.m. at least one business day ahead.
Does a small garden shed count against the accessory building limit?
Not if it is small and not on a permanent foundation: the village’s zoning FAQ says a 4-by-8-foot tool shed of that kind falls under the small building exemption, which frees it from the accessory building limit and lot coverage but not from other departments’ rules.
Who handles elevator permits?
An outside agency performs elevator permits, plan review and inspections for the village, and the applicant pays its fees.
Westmont permit search and official resources
Questions about an application’s review status, requirements or inspections go to the permit staff at permitting@westmont.il.gov or 630-981-6250. Meeting agendas and minutes for the Board of Trustees, Planning and Zoning Commission and Community Development Committee are posted on the village’s agenda center. Zoning verification letters, which report a property’s overlay districts and zoning history, are requested from the Planning and Zoning Division.
Inspections are where schedules slip.
Get a free quote →- Westmont Permitting Division: guides, codes and inspections
- Fees and bonds
- Contractor registration
- Contractor registration form
- Ordinance 26-137, building and fire code amendments
- Community Development Department
- Planning and Zoning Division
- 2026 amended zoning ordinance and FAQ
- Right-of-way permits
- DuPage County Building and Zoning (unincorporated areas)
- FEMA Community Status Book, Illinois
Simplify Westmont permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Westmont sooner?
Let Alliance prepare, file, and track your Westmont permits while your crew stays on the job.
More Illinois permitting guides
DuPage County
Read guide →Wheaton
Read guide →Woodridge
Read guide →Wheeling Building Permit Guide
Read guide →Whiteside County Building Permit Guide
Read guide →Will County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Westmont permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.