Inside Palos Hills, building permits come from the city’s Building Department at City Hall, 10335 S. Roberts Road (708-598-3400; Monday to Friday, 8:30 a.m. to 5:00 p.m.), led by Commissioner Tom Lesnicki (ext. 1112). Permits can be applied for online through the city’s CivicReview application or at City Hall. Every permit needs the property index number, a registered contractor or a homeowner’s hold-harmless agreement and, in most cases, a plat of survey, and contractors register for $50 (general, two years) or $25 (subcontractor, one year).
What requires a building permit in Palos Hills?
New construction, renovations, additions and structural changes all need building permits, and the city’s rule of thumb is that structural changes to a building mean a permit. Its list adds a number of jobs people often overlook: changing a gas water heater to a tankless one, regrading a yard, repairing a waste sewer line, and any fire-damaged building, which needs a pre-inspection as well as a permit. Every sign, permanent or portable, also needs a permit.
Home projects
- New homes and residential additions
- Garages, sheds and decks
- Roofing
- Fences and driveways
- Above-ground and in-ground pools
- Lawn sprinklers
- Electrical work
- Tankless water heater conversions
- Landscape grade changes and waste sewer line repairs
Commercial and special cases
- All commercial changes or additions
- All new construction
- Fire-damaged buildings (pre-inspection and permit)
- Demolition (an EPA permit is also required)
- Permanent and portable signs
What Palos Hills decides and what the state holds
Palos Hills enforces its own building, planning and zoning codes. Its FAQ lists the 2021 International Building, Residential, Existing Building and Energy Conservation codes, a 2021 mechanical code and the 2018 Chicago Electrical Code, with local amendments collected in a builder’s guide available at City Hall. For plumbing the FAQ names the 2021 International Plumbing Code; plumbing work in Illinois also follows the state’s Illinois Plumbing Code under a state-licensed plumber, and the city’s plumber registration asks for the state registration and bond.
Palos Hills building department: who handles permitting
The Building Department enforces the city’s building, planning and zoning codes, and its structural, plumbing, HVAC and electrical inspectors work under the Building Commissioner. The City Engineer checks improvements for drainage and engineering, and an Ordinance Officer enforces the property maintenance and zoning codes. The department also advises the City Clerk on land use for business licenses and works with the health department on local businesses. Land outside the city limits in unincorporated Cook County is permitted by the Cook County Department of Building and Zoning.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Building Department, City Hall, 10335 S. Roberts Rd., Palos Hills, IL 60465 |
| Phone | 708-598-3400; fax 708-598-2475 (Attn: Building Dept) |
| Hours | Monday to Friday, 8:30 a.m. to 5:00 p.m. |
| Department head | Tom Lesnicki, Commissioner, ext. 1112 |
| Online filing | CivicReview permit and contractor registration applications |
| Unincorporated land | Cook County Department of Building and Zoning, 69 W. Washington St., Chicago, 312-603-0500 |
Palos Hills permit types
The city now offers online permitting: one CivicReview application handles building permits and signs, and a second handles contractor registration. City Hall also handles applications at the counter. Whichever route you use, the application needs the real estate index number from the owner’s property tax bill, the registered contractor or the owner’s hold-harmless agreement, and usually a plat of survey.
Residential permits
- Doing your own work. Homeowners who do their own work sign a hold-harmless agreement in place of using a registered contractor.
- Fire damage. A fire-damaged house is inspected before the repair permit is issued.
- Water heaters. Replacing a gas tank water heater with a tankless unit needs a permit.
- Grading and sewers. Changing the landscape grade or repairing a waste sewer line needs a permit, and the City Engineer reviews drainage on improvements.
- Flood zones. To see whether a lot is in a mapped flood area, residents look at the floodplain map at City Hall; staff help locate the property but do not make the final determination. To remove a building from the flood zone, an Illinois-licensed land surveyor prepares an elevation certificate, and if the lowest floor is at least one foot above the base flood elevation, the owner can apply to FEMA for a Letter of Map Amendment or Revision. The surveyor can file that application and quote its fees, and once FEMA’s letter arrives the owner sends it to the mortgage lender to ask that the flood insurance requirement be dropped. The FAQ gives the city’s map number as 17031C0604-F.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Every commercial change or addition needs a permit, and commercial properties must use a registered contractor; the hold-harmless route is for homeowners doing their own work. Sign permits cover both permanent and portable signs. Most businesses also need a city business license from the City Clerk, applied for in person or online. Once the license types are identified, the Building Department checks whether the address is zoned for that activity and sends its approval or denial to the Clerk. Licenses that need no inspection can be issued the same day if the fee and any debts to the city, such as water bills or parking tickets, are paid; for others, the inspecting departments contact the business to schedule the first inspection, and later re-inspections may carry a fee. The license runs from May 1 to April 30, and the application asks for the floor area, the date the fire extinguishers were last serviced, seating capacity for restaurants and bars, a copy of the lease and a 24-hour maintenance contact. By signing it, the owner agrees to follow city ordinances and the rules of the North Palos Fire Protection District and acknowledges that any construction, alteration or remodeling, inside or outside the building, needs a building permit.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning. The city posts its zoning map. Variances from the zoning code go to the Zoning Board of Appeals, which reviews and rules on them, and special uses go to the Plan Commission, which recommends to the City Council. In 2026 both meet at City Hall as needed, the Plan Commission on Mondays and the Zoning Board of Appeals on Tuesdays at 7:00 p.m.; the City Council meets on the first and third Thursdays.
- Demolition. Demolition needs an EPA permit in addition to the city permit.
- Stormwater. Palos Hills is not on MWRD’s list of authorized municipalities, so any Watershed Management Ordinance permit a project needs is filed with MWRD. The city’s own stormwater program (708-598-3400, ext. 1106) takes reports of drainage problems and illegal dumping and files annual NPDES reports.
- Sewer connections. The city’s sanitary sewers carry only sanitary sewage to MWRD for treatment, so sump pumps must discharge to the lawn, and Public Works inspects every new connection to the sanitary sewer system.
Palos Hills permit costs and fees
The city does not post its building permit fee schedule online, and the permit page gives no amounts; the Building Department assesses the fee when it reviews the application, so call 708-598-3400 with the scope and cost of the job for the amount. The charges the city does publish on its pages are these:
| Item | Amount or rule |
|---|---|
| General contractor registration | $50, good for 2 years, with a $25,000 surety bond for 2 years |
| Subcontractor registration | $25, good for 1 year, with a $10,000 surety bond for 1 year |
| Plumbing contractor registration | State registration and state / IDPH bond copies |
| Sale of a home: water and sump pump inspection permit | $50, added to the final water bill |
| FOIA copies | First 50 pages free; $0.15 per page after that |
Rather talk it over?
Call 1-855-478-4290 →Expired contractor registrations lead to stop work orders, so a lapsed registration can halt a permitted job until it is renewed. Fines for code violations are set in the Municipal Code.
Trade permits and who may pull them
Permits go to registered contractors or to homeowners who sign a hold-harmless agreement for their own work. A general contractor registers for $50 for two years with a $25,000 surety bond; a subcontractor registers for $25 for one year with a $10,000 bond. Both file a certificate of liability insurance, and remodeling contractors list their EPA lead-safe (RRP) certificate number. Registration can be done online through CivicReview or on the paper application, and the city keeps a list of registered contractors at City Hall. It does not recommend contractors or take complaints about them.
- Electrical and roofing contractors: a copy of the current electrical or roofing license with the registration.
- Plumbing contractors: the separate plumber registration form, with copies of the State of Illinois plumbing contractor registration and the state (Department of Public Health) bond.
- Inspections by trade: the city has its own structural, plumbing, HVAC and electrical inspectors under the Building Commissioner.
How to apply for a Palos Hills building permit
Check the city’s permit list or call 708-598-3400; structural work always needs one.
Look up the district on the zoning map and ask whether a variance or special use is needed.
Register each contractor online or on paper, with the bond and insurance, or sign the homeowner hold-harmless agreement.
Find the property index number on the tax bill and prepare the plat of survey and plans.
Submit through the CivicReview permit application or at City Hall.
After the permit issues, contact the Building Department to arrange the required inspections.
Review, corrections and what causes delay
Applications without the property index number, a plat of survey or a registered contractor are not complete. Drainage questions bring in the City Engineer, a variance waits for a Zoning Board of Appeals hearing and a special use for the Plan Commission and City Council, and a demolition cannot proceed until the EPA permit is in place.
Rather not deal with the building department?
Get a free quote →Inspections and certificates in Palos Hills
Permitted work is inspected by the city’s structural, plumbing, HVAC and electrical inspectors; contact the Building Department at 708-598-3400 to arrange them. Fire-damaged buildings are inspected before repairs are permitted, and the City Engineer checks site improvements for drainage. Contractors must keep their city registration current through the job, because the city issues stop work orders when a registration expires.
After construction, the Ordinance Officer enforces the property maintenance and zoning codes. A property owner who receives a violation letter must correct it by the compliance date or contact the Building Department or the officer to ask for an extension; failing to do either can bring the fines set in the Municipal Code.
When a home is sold, the seller calls City Hall for a final water meter reading and an inspection of the sump pump and ejector pump, booked between 7:15 a.m. and 3:00 p.m. on weekdays. The city then issues a permit that tells the attorneys about any violations and shows the final water bill, including the $50 permit fee; it is paid and taken to the closing.
Illinois building code in Palos Hills
Palos Hills enforces the 2021 International codes and the 2018 Chicago Electrical Code named in its FAQ, with local amendments, through the Building Department. FEMA’s Community Status Book lists the City of Palos Hills (community 170143) as participating in the National Flood Insurance Program, with flood maps effective November 1, 2019; the city’s FAQ still describes the 2008 map adopted by Ordinance 2008.9, and the floodplain map can be viewed at City Hall.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Palos Hills building permit FAQs
Can I apply for a Palos Hills permit online?
Yes. The city’s CivicReview application takes building and sign permits, and a second one takes contractor registrations; City Hall also accepts applications.
Can a homeowner pull a permit?
Yes, for their own work, by signing a hold-harmless agreement. Commercial properties must use a registered contractor.
What does contractor registration cost?
$50 for two years for a general contractor, with a $25,000 bond, and $25 for one year for a subcontractor, with a $10,000 bond.
How much is a building permit?
The city does not post its permit fee schedule; call the Building Department at 708-598-3400 with the scope and cost of the work.
Want this handled start to finish?
Get a free quote →Is my property in a flood zone?
View the floodplain map at City Hall; staff help locate the property but do not make the final determination.
What do I need from the city to sell my house?
Book a final water meter reading and a sump pump and ejector pump inspection at City Hall; the city issues a $50 permit, shown on the final water bill, which is paid and taken to the closing.
Do I need a permit to switch to a tankless water heater?
Yes. Changing a gas tank water heater to a tankless unit is on the city’s permit list.
Who decides a zoning variance?
The Zoning Board of Appeals reviews and rules on variances; special uses go to the Plan Commission, which recommends to the City Council.
Palos Hills permit search and official resources
Ask the Building Department at 708-598-3400 about a permit’s status. The City Clerk’s Office keeps the city’s central records and answers Freedom of Information Act requests within five business days (21 for commercial requests): submit the written request to the City FOIA Officer at City Hall in person, by mail, by fax (708-598-2475) or by email (foia@paloshillsweb.org).
Inspections are where schedules slip.
Get a free quote →- Palos Hills Building Department
- Building permits
- CivicReview permit application
- Contractor requirements
- CivicReview contractor registration
- Contractor registration application
- Plumber registration application
- Building Department FAQs: codes and flood maps
- Zoning map
- 2026 meeting schedule
- Storm water management
- Sanitary sewers and sump pumps
- Public Works FAQs: final water reading on sale
- Obtaining a city business license
- Business license application, 2025–26
- Freedom of Information Act requests
- MWRD authorized municipalities
- Cook County Department of Building and Zoning
- FEMA Community Status Book, Illinois
Simplify Palos Hills permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Palos Hills sooner?
Let Alliance prepare, file, and track your Palos Hills permits while your crew stays on the job.
More Illinois permitting guides
Cook County
Read guide →Park Forest
Read guide →Park Ridge
Read guide →Pekin Building Permit Guide
Read guide →Peoria Building Permit Guide
Read guide →Peoria County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Palos Hills permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.