Skip to main content
Municipal GuideGeorgiaTattnall County

Tattnall County, Georgia Building Permit Guide

In Tattnall County, building permits, mobile home location permits and certificates of occupancy are applied for at the County Tax Assessor’s office, and Code Enforcement carries out the occupancy inspection.

Authority: Tattnall County Tax Assessor’s office (permits)Code: Georgia State Minimum Standard Codes (2024)Phone: County Administration · 912-557-4335 · 108 W. Brazell St, Reidsville, GA 30453
Apply at
Tattnall County Tax Assessor’s office912-557-4010, Reidsville
Needed first
911 address and septic approvalFrom the 911 center and the health department
Permit trigger
New work or improvements worth $1,000+County Code Sec. 18-1
Cities
Cobbtown, Collins, Glennville, Manassas, ReidsvilleCity inspectors handle electrical permits there

Under the Tattnall County code, building permits for new construction and substantial improvements are issued by the County Tax Assessor’s office in Reidsville, which also issues mobile home location permits and certificates of occupancy. Code Enforcement carries out the occupancy inspection, a separate County electrical connection permit is needed before the power company can connect a new service, and a mobile home location permit costs $75.

What requires a permit in Tattnall County?

Sec. 18-1 of the County code requires a building permit for all new construction, and for substantial improvements to existing buildings, with a wholesale value of $1,000 or more, private or commercial, built on site or portable. Getting the permit is the property owner’s responsibility.

County permits

  • Building permit for new construction and substantial improvements worth $1,000 or more
  • Mobile, manufactured or modular home location or relocation permit
  • Electrical connection permit for any new electrical service
  • Certificate of occupancy
  • Exit permit to move a mobile home out of the County
  • Development permit for work in a flood hazard area

Zoning approvals

  • Rezonings
  • Conditional use permits
  • Variances and administrative variances
  • Site plan review for development applications

Short on time to read all of this?

Get a free quote →

Who handles permitting in Tattnall County?

TaskCounty office
Building permits, mobile home location permits, certificates of occupancyTax Assessor’s office, P.O. Box 1010, Reidsville, GA 30453 · 912-557-4010
Occupancy inspectionsCode Enforcement
Zoning, site plans, variancesPlanning and Zoning Department
911 addressesCounty emergency services center
Septic permitsCounty health department
Flood hazard development permitsCounty engineer
County administration108 West Brazell Street, Reidsville · 912-557-4335

The Planning and Zoning Department administers the Zoning Ordinance, reviews site plans, coordinates rezonings, conditional uses and variances, and inspects sites as part of that review. Through Code Enforcement it also handles property maintenance, zoning violations and nuisances.

Cities: Tattnall County has five municipalities: Cobbtown, Collins, Glennville, Manassas and Reidsville. The County’s electrical permit rules apply only to unincorporated land; inside those city limits, electrical permits come from the city building inspector or another city representative.

Tattnall County permit fees

The County code says building permit fees are set by the Board of Commissioners, and a permit for a lot that needs a new 911 address includes the 911 sign and post. The figures written into the mobile home chapter (Sec. 42-29) are:

Fees in Tattnall County Code Sec. 42-29
PermitFee
Mobile home location or relocation permit application$75
Fee on a property with an existing 911 address$100
Fee on a property needing a new 911 address (includes 911 sign and post)$100
Exit permit to move a mobile home out of the County or to a dealer$5

Building without a required permit brings a fine based on the value of the work:

Not sure this scope needs a permit?

Get a free quote →
Fines for building without a permit (Sec. 18-1)
Value of constructionFine
$1,000–$4,999.99$25
$5,000–$9,999.99$50
$10,000–$49,999.99$100
$50,000–$99,999.99$200
Over $100,000$500

The electrical connection permit fee is set by the Board of Commissioners and is not listed in the code.

Electrical connection permits

No utility may provide new electrical service to a building in unincorporated Tattnall County, by meter or by a feed or cord from another building, until the County has issued an electrical connection permit. Existing service locations are pre-approved and can change hands without a new permit, unless the County has put them on its “out of compliance” list. A relocated mobile home always needs a new electrical permit.

The application lists the landowner, the 911 address, the tax map and parcel number, the use and the electric provider, and comes with:

  • A copy of the current year’s paid tax receipt
  • The health department’s approved septic inspection
  • A copy of the location or building permit
  • For a manufactured or modular home, the installer’s certificate that it was set up to state rules or the manufacturer’s instructions

A county official inspects the building before the permit is issued. A dealer or installer can get a temporary electrical permit to set up and test a home. A self-contained travel trailer or motor home with no on-site sewage can be connected without a septic permit, under a written agreement with the County.

Rather talk it over?

Call 1-855-478-4290 →

How to get a permit in Tattnall County: 5 steps

1. Check the location

Make sure the parcel is outside Cobbtown, Collins, Glennville, Manassas and Reidsville, and settle any zoning question with Planning and Zoning.

2. Get a 911 address

Request it from the County emergency services center.

3. Get septic approval

Have the health department issue a septic permit or re-inspect an existing tank.

4. Apply at the Tax Assessor’s office

Apply for the building permit or mobile home location permit and pay the fee; the electrical connection permit follows once the County has inspected.

5. Call Code Enforcement

When the work is done and the address is posted, schedule the inspection and get the occupancy permit.

Inspections and occupancy

The code sends applicants to Code Enforcement for the inspection that leads to an occupancy permit. For mobile, manufactured and modular homes the County checklist covers:

  • At least 30 feet of frontage on a public or private road
  • Working metal or wood exterior doors, sound floors and glass in every window
  • Intact siding with no rust or damage showing
  • Working hot and cold water, toilet, sinks, tub or shower, and certified heating and cooking appliances
  • No exposed wiring or plumbing, with wiring in conduit from the service pole panel to the home
  • Full skirting of masonry, concrete, stucco, masonite, metal or vinyl, with no roofing tin
  • The installer’s certificate fixed inside the panel box door

Rather not deal with the Tattnall County building department?

Get a free quote →

Homes built before July 1976, or not meeting the HUD standard, cannot be placed anywhere in the unincorporated county. Only a state-registered hauler and installer may move and set up a home once the location permit is issued.

Local Tattnall County rules

Floodplains: Chapter 30 of the code requires a development permit before any development in a flood hazard area, and names the county engineer as the administrator.

Mobile home decals: every manufactured, modular or mobile home must show the current tax decal from the Tax Commissioner, visible from the road, and a home being moved needs the current decal and the relocation permit fixed to it.

Out-of-compliance list: the County can list existing locations that break a County ordinance or owe taxes; after 30 days’ notice the list goes to the power companies, and a listed location needs a new electrical permit before service is restored.

Georgia building code

Georgia's State Minimum Standard Codes apply statewide: the 2024 International Building, Residential, Plumbing, Mechanical, Fuel Gas, and Swimming Pool and Spa Codes and the 2023 National Electrical Code, with Georgia Amendments, in force since 1 January 2026; the energy code is still the 2015 IECC with Georgia supplements. The Georgia State Minimum Standard Codes

Tattnall County permit search and official resources

These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.

Want this handled start to finish?

Get a free quote →

Tattnall County permit FAQs

Who issues building permits in Tattnall County?

The County code places building permits, mobile home location permits and certificates of occupancy with the Tax Assessor’s office in Reidsville (912-557-4010). Code Enforcement carries out the occupancy inspection.

When do I need a building permit in Tattnall County?

For new construction, or a substantial improvement to an existing building, with a wholesale value of $1,000 or more, whether private or commercial.

Inspections are where schedules slip.

Get a free quote →

How much does it cost to place a mobile home?

The code lists $75 for the location or relocation permit application and a $100 fee, which includes the 911 sign and post where a new address is needed. Moving a home out of the County needs a $5 exit permit.

What happens if I build without a permit?

The County charges a fine based on the value of the work, from $25 for $1,000–$4,999.99 up to $500 for work over $100,000.

Can the power company connect a new building without County approval?

No. New service in the unincorporated county needs a County electrical connection permit, which requires the septic approval, the paid tax receipt and the building or location permit.

Does the County handle permits in Glennville or Reidsville?

The County’s electrical permit rules do not apply inside Cobbtown, Collins, Glennville, Manassas or Reidsville; there the city building inspector or another city representative handles electrical permits.

Simplify Tattnall County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Georgia. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Tattnall County sooner?

Let Alliance prepare, file, and track your Tattnall County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Tattnall County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.