The City of Monroe Code Department at 215 N. Broad Street issues building and trade permits, reviews plans and inspects construction inside city limits. Building permit fees are based on ICC valuation (a $250,000 house is $910), plan review adds half the permit fee, and a new single-family home also pays a $2,459 impact fee and utility tap fees before the permit is issued.
What requires a permit in Monroe?
Monroe’s Code Department processes building permits and inspects building sites for compliance with safety and building codes. The City publishes distinct applications for commercial/non-residential work, residential buildings, additions, renovations/remodels, accessory buildings and manufactured/mobile homes.
Electrical, gas, mechanical/HVAC and plumbing work each have their own application, and the City also publishes pool, sign, demolition and underground utility forms.
Monroe building department: who handles permitting
The Code Department receives and processes building permit applications, handles zoning and plan review, and inspects building sites. Permit applications are taken from 8:00 a.m. to 4:00 p.m.
| Detail | Information |
|---|---|
| Office | 215 N. Broad Street, Monroe, GA 30655 (P.O. Box 725) |
| Phone | 770-207-4674 |
| permits@monroega.gov | |
| Building inspector | 678-628-6783 |
| Payments | Municipal Online Payments (account.municipalonlinepayments.com) |
| Inspections | Online request form or inspections@monroega.gov |
Monroe permit types and filing
Download the application that matches the work from the Code Department permits page: commercial/non-residential, residential new building (with a residential information packet), residential addition, renovation/remodel, accessory building or manufactured/mobile home. Use the City’s Transmittal Form with submittals.
Short on time to read all of this?
Get a free quote →Separate applications cover pools, signs, demolition, special events and underground utility installation releases. A permit is void if work does not begin within 6 months of issuance, and a project not finished within a year must be renewed with the Code Department; renewing an expired permit costs 10% of the original fee.
Permit costs and fees in Monroe
Fees come from the Code Department Schedule of Fees, revised January 14, 2025. Valuation is the building’s square footage multiplied by the “average” value in the latest ICC Building Valuation Data table.
| Project | Fee |
|---|---|
| Valuation up to $3,000 | $25 |
| $3,000 to $50,000 | $25 plus $5 per additional $1,000 |
| $50,000 to $100,000 | $260 plus $4 per additional $1,000 |
| $100,000 to $500,000 | $460 plus $3 per additional $1,000 |
| Over $500,000 | $1,660 plus $2 per additional $1,000 |
| Plan review (when plans are required) | 50% of the building permit fee, paid at submittal |
| Certificate of occupancy / temporary CO | $75 / $50 |
| Re-inspection | $20 |
| Residential / commercial pool | $100 / $200 |
| Demolition | $150 |
| Land disturbance, single residential lot | $200 |
| New residential garbage fee | $65 |
For example, a house valued at $250,000 has a building permit fee of $910 and, if plans are reviewed, a $455 plan review fee. Impact fees adopted on September 9, 2025 are $2,459 for a single-family home, $3,292 per townhome or condo and $3,763 per apartment. Starting work before the permit is issued doubles the fees.
Not sure this scope needs a permit?
Get a free quote →Electrical, plumbing, mechanical and gas work
Monroe publishes separate electrical, gas-only, mechanical/HVAC and plumbing permit applications, each for commercial or residential work. Trade contractors need a current Georgia licence for their trade.
| Permit | Fee |
|---|---|
| Electrical, up to 400 A | $75 flat |
| Electrical, over 400 A | $100 plus $0.20 per amp over 400 |
| Plumbing | $50 plus $4.50 per fixture; $15 per water heater |
| Gas | $50 residential, $70 commercial |
| HVAC, one- and two-family | $50 per unit |
| HVAC, commercial | $50 plus $6.50 per 1,000 sq ft |
| Trade repairs | $25 |
Alliance handles electrical permit expediting for contractors here. More on this: who pulls the electrical permit.
Application documents and plan review
The Residential Building Permit Information Packet (revised June 2026) lists what goes with a new home application:
- A site plan drawn to scale, showing setbacks, the house footprint and driveway
- Building plans, including elevations
- The general contractor’s state and business licences
- Tap fees, arranged with the Utility Department, and the impact fee, both paid before the permit is issued
Lots in a Character District follow the building standards in Article 7 of the zoning ordinance; other lots follow Section 1010, with setbacks in Section 800, Table 6. Site and development work can need the City’s Commercial Development Packet and a Land Disturbance Permit Application, both on the Forms and Permits page.
Rather talk it over?
Call 1-855-478-4290 →How to apply: 6-step Monroe process
Check the parcel is inside Monroe city limits rather than unincorporated Walton County.
Identify building, trade, site/development, fire, zoning and specialty permits that apply to the actual scope.
Download the City application for the project type and each trade.
File the application with the Transmittal Form and pay through the City’s online payment portal.
Respond to City comments with complete revised documents.
Request each required inspection at the proper stage and complete final or occupancy requirements before use.
Monroe inspections
Request inspections by email to inspections@monroega.gov or through the City’s online Inspection Request form; the building inspector’s number is 678-628-6783. Before the first inspection, mark every property line clearly on site and install erosion control, which must be maintained daily.
The City’s order of residential inspections is:
Including under-slab plumbing, then the foundation wall if there is a basement.
Sheathing nailing, then the house wrap.
With rough electrical, plumbing and mechanical.
Before walls are closed.
Permanent power when the house is 90% complete, then the gas pressure test.
The $75 final inspection fee must be paid in advance; the house cannot be occupied until the certificate of occupancy or completion is approved.
Rather not deal with the building department?
Get a free quote →Each re-inspection costs $20. In newly developed subdivisions, street frontage sidewalks must be in before the first certificates of occupancy.
Local Monroe details that matter
Historic district: lots in a historic district need Historic Preservation Committee approval, with a separate application and fee, before any permit is issued; a Certificate of Appropriateness is $100. Demolishing a historic home costs $100 and a historic commercial building $200.
Zoning: a zoning verification letter is $50, signs are $100 each, and rezonings range from $300 to $600 depending on the district.
Moving and temporary structures: relocating a structure needs a $200 moving permit and the mover’s insurance certificate; tents can be permitted for up to 30 days at $30, with no more than 12 a year per lot.
Georgia building code
Georgia's State Minimum Standard Codes apply statewide: the 2024 International Building, Residential, Plumbing, Mechanical, Fuel Gas, and Swimming Pool and Spa Codes and the 2023 National Electrical Code, with Georgia Amendments, in force since 1 January 2026; the energy code is still the 2015 IECC with Georgia supplements. The Georgia State Minimum Standard Codes
Monroe permit search and official resources
These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.
Want this handled start to finish?
Get a free quote →- Georgia DCA current State Minimum Codes
- Monroe Forms and Permits
- Monroe Permit Portal & Payments and inspection requests
- Monroe Code Department permit applications and fee schedule
- Monroe Code Department
- Monroe Code Department fee schedule (January 2025)
- Monroe impact fees (adopted September 2025)
- Monroe residential building permit information packet
Monroe permit FAQs
Who issues building permits in Monroe?
The City of Monroe Code Department receives and processes building-permit applications and inspects sites for code compliance.
How much is a building permit for a new house in Monroe?
It depends on ICC valuation: $460 for the first $100,000 plus $3 per additional $1,000, so a $250,000 house is $910, plus 50% for plan review, a $2,459 impact fee and tap fees.
How much are trade permits?
Electrical is $75 up to 400 amps, plumbing $50 plus $4.50 per fixture, residential gas $50 and residential HVAC $50 per unit.
Inspections are where schedules slip.
Get a free quote →How do I request an inspection in Monroe?
Email inspections@monroega.gov or use the City’s online Inspection Request form. The final inspection fee of $75 is paid in advance.
How long is a Monroe permit valid?
It is void if work does not begin within 6 months; projects not finished within a year must be renewed.
Is Walton County the permitting authority inside Monroe?
No. Inside city limits the City’s Code Department handles building permits; check the parcel is inside Monroe first.
Simplify Monroe permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Georgia. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Monroe sooner?
Let Alliance prepare, file, and track your Monroe permits while your crew stays on the job.
More Georgia permitting guides
Walton County
Read guide →Athens-Clarke County
Read guide →Gwinnett County
Read guide →Monroe County Building Permit Guide
Read guide →Moultrie Building Permit Guide
Read guide →Mulberry Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Monroe permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.