Inside Chamblee, building and trade permits are issued by the City’s Planning & Development Department at 3518 Broad Street, and applications and inspection requests go through the City’s iWorQ portal. The 2026 fee schedule charges $950 for the first $100,000 of building value plus $6 per $1,000 after that, with plan review adding 25% for a house, and the City aims to finish its internal review within 5 business days.
What requires a permit in Chamblee?
Chamblee Code section 18-11 requires a permit before constructing, enlarging, altering, repairing, moving or demolishing a building, changing its occupancy, or installing or changing regulated electrical, gas, mechanical or plumbing systems. The City’s Permit Required Checklist (January 2025) spells out common jobs:
Permit needed
- New buildings and changes of use
- Detached garages and accessory buildings over 200 sq ft
- New decks or structural deck repairs
- Interior remodels involving drywall, lighting or non-structural framing
- New electrical circuits or service work, and hardwired appliance replacement
- Furnace, air conditioner, ductwork and water heater replacement
- Gas piping, and plumbing fixtures that need piping changes
- Residential re-roofing and new siding, masonry or stucco
- Retaining walls 48 inches or taller, pools and spas, fireplaces and wood stoves
- New, replacement or repaired fences, including fence posts
- Driveways that are removed and replaced or enlarged
- Removing specimen trees or more than 5 trees a year
No permit
- Playhouses or tree forts up to 50 sq ft
- Plug-in appliance replacement
- Non-structural deck repairs
- Same-size window or door replacement
- Painting, tiling, carpet and trim work
- Garage door repair or replacement
- Minor roof covering or siding repairs
- Retaining walls under 48 inches
- Fence repairs that do not involve posts
- Removing fewer than 5 non-specimen trees on a residential lot
Commercial work also needs permits for fire alarm, sprinkler and hood suppression systems, commercial roofs, signs, tents and temporary sales. Work done without a permit is charged 200% of the original permit fee.
Chamblee building department: who handles permitting
Planning & Development handles building, trade, site and zoning permits and inspections. Plan review is shared between Planning and Zoning, Building, Engineering and right-of-way staff, with DeKalb County Watershed reviewing new homes and the DeKalb Health Department reviewing septic systems.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Authority | City of Chamblee Planning & Development |
| Phone | 770-986-5010 |
| Office | 3518 Broad Street, Chamblee, GA 30341 |
| chambleedevelopment@chambleega.gov | |
| Portal | iWorQ permit portal |
Chamblee permit types and filing
Chamblee lists separate residential permits for a new single-family home, additions, interior renovations, decks, tree removal, complete and interior demolition, accessory structures, EV chargers, siding, retaining walls and fences, and separate application packets for basement finishes, accessory structures, decks, fences, retaining walls, tree removal and demolition. Trade work has its own electrical, mechanical and plumbing applications (updated November 2025).
Supporting forms include the General Contractor Affidavit, the Homeowner Declaration Form, the Authorized Permit Agent Affidavit, an Owner Permission Affidavit and the Subcontractor Form. A homeowner acting as general contractor must live, or intend to live, in the home, and every plumbing, electrical and HVAC trade still files its own subcontractor form, even when the owner does the work. Site work uses the Land Disturbance Permit packet and pre-screen form, and larger projects can start with the City’s Pre-Application Form.
Permit costs and fees in Chamblee
Fees come from the Planning and Development Department Fee Schedule (2026). New construction is valued with the latest ICC Building Valuation Data table, and interior work at 50% of that value. Every application with a fee also pays a $25 technology fee, and plan review fees are due, non-refundable, when you apply.
Not sure this scope needs a permit?
Get a free quote →| Project | Fee |
|---|---|
| Value $1–$25,000 | $14 per $1,000 |
| Value $25,001–$50,000 | $350 plus $10 per additional $1,000 |
| Value $50,001–$100,000 | $600 plus $7 per additional $1,000 |
| Value $100,001–$500,000 | $950 plus $6 per additional $1,000 |
| Value $500,001–$1,000,000 | $3,350 plus $5 per additional $1,000 |
| Minimum permit fee | $150 residential, $200 commercial |
| Plan review | 25% of the permit fee for single-family ($100 minimum); 50% for other uses ($200 minimum) |
| Certificate of Occupancy | $50 new house; $100 new commercial; $25 renovation, addition or accessory structure |
| Re-roof / siding replacement | $100 residential roof ($200 commercial); $100 siding |
| Fence | $50 residential, $75 commercial |
| Stand-alone demolition | $150 house, $200 commercial building, $100 interior |
| Permit extension | $50 for the first 3 months, $100 for each later 3 months |
| Change of contractor | $200 |
| Work without a permit | 200% of the original permit fee |
For example, a house valued at $250,000 has a permit fee of $950 plus $900, or $1,850, plus $462.50 for plan review, the $25 technology fee and the $50 Certificate of Occupancy. Tree removal permits cost $50 to $75, and replacement recompense is $200 per inch of trunk diameter ($600 for specimen trees).
Electrical, plumbing, mechanical and gas work
Electrical, mechanical and plumbing permits are a flat $80 each under the 2026 schedule, and a temporary power letter is $50. Each trade contractor files the Subcontractor Form, and all subcontractor affidavits must be in before inspections can be scheduled. The inspection guide lists stand-alone trade inspections: gas-line test, mechanical rough and final, electrical rough and final, and plumbing rough and final.
Fire alarm, sprinkler and hood suppression systems need a separate fire plan review, at $150 per initial review for most systems ($225 for alarm and sprinkler systems in buildings over 12,000 sq ft). Second submittals are free; third and later reviews are charged again.
Alliance handles electrical permit filing for contractors here. More on this: who pulls the electrical permit.
Rather talk it over?
Call 1-855-478-4290 →Application documents and plan review
At submittal
- One digital PDF of the plans (50 MB maximum per file)
- Completed building permit application
- Georgia Residential Energy Code Compliance Certificate
- Right-of-way encroachment form, if needed
- Plan review fee
Before the permit is issued
- Remaining fees, including NPDES fees for over 1 acre of disturbance
- Sewer capacity letter or evaluation form (new homes)
- General Contractor Affidavit or Homeowner Declaration
- Contractor’s Georgia business licence and state licence
- Government ID for the contractor or agent, and the Authorized Permit Agent Affidavit
- Erosion control bond, if needed
- Final plan set as one PDF
Review times: internal City reviews take up to 5 business days, and resubmittals up to 3; DeKalb Watershed, DeKalb Health and, on request, FAA reviews run at the same time but can take longer. Comments arrive by email in a Code Compliance Letter, and each resubmittal needs a new PDF and a response letter. The City emails a stamped plan set, which must be printed and kept on site. An application is complete only once fees are paid and the required City, county and state approvals are in.
How to apply: 6-step Chamblee process
Confirm the parcel is inside Chamblee and whether the job needs a permit.
Use the City permit packet; include the plan PDF, energy certificate and any right-of-way form.
Submit in iWorQ or in person and pay the plan review and technology fees.
Respond to comments with a revised PDF and response letter; resubmittals take up to 3 business days.
Pay the remaining fees, file the affidavits and licences, and print the stamped plans for the site.
Book inspections in iWorQ, pass site, building and zoning finals, and request the Certificate of Occupancy or Completion within 2 business days.
Rather not deal with the building department?
Get a free quote →Chamblee inspections
Schedule inspections in iWorQ with the permit number and your access code: a contractor’s state licence number, a business licence number for those not required to be licensed, or the street number for a homeowner doing their own work. Requests submitted before 4:00 p.m. Monday–Thursday are scheduled for the next business day; Friday requests must be submitted before 11:00 a.m. Late or holiday requests move to the second business day.
The fee schedule charges $50 for a third re-inspection and $100 for each one after that. Inspections outside normal hours cost $75 per hour with a 2-hour minimum. At the end of the job the City needs a site final, a building final and, for new homes, a zoning final, plus a GDOT final for work in state right-of-way, before it issues the Certificate of Occupancy or Completion.
Local Chamblee details that matter
Posting: permits and the stamped plans must stay on site during construction.
Construction hours: 7:00 a.m.–7:00 p.m. Monday–Friday and 9:00 a.m.–5:00 p.m. Saturday, with no construction on Sundays or City holidays.
Third-party review: the City allows approved third-party inspectors and plan reviewers (application fee $25 each), but fire-safety and erosion-control inspections are excluded.
Trees: removing specimen trees, or more than 5 trees a year on a residential lot, needs a tree removal permit, and every tree removal on commercial property does.
Closeout: request the Certificate of Occupancy or Completion within 2 business days after all final inspections are approved.
Georgia building code
Georgia's State Minimum Standard Codes apply statewide: the 2024 International Building, Residential, Plumbing, Mechanical, Fuel Gas, and Swimming Pool and Spa Codes and the 2023 National Electrical Code, with Georgia Amendments, in force since 1 January 2026; the energy code is still the 2015 IECC with Georgia supplements. The Georgia State Minimum Standard Codes
Chamblee permit search and official resources
These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.
Want this handled start to finish?
Get a free quote →- Georgia DCA current construction codes
- Residential permit inspections guide
- Chamblee iWorQ permit portal
- Planning & Development applications and forms
- Commercial building permit packet
- Chamblee Code, Chapter 18 (buildings)
- Chamblee Planning and Development Fee Schedule (2026)
- Chamblee Permit Required Checklist
- Chamblee residential building permit packet
- Chamblee Homeowner Declaration Form
Chamblee permit FAQs
Inspections are where schedules slip.
Get a free quote →Does Chamblee issue its own building permits?
Yes. The City Planning & Development Department administers building permits and inspections.
How much is a building permit in Chamblee?
It depends on value: $950 for the first $100,000 plus $6 per additional $1,000 up to $500,000, with a $150 residential minimum. Single-family plan review adds 25%, plus a $25 technology fee.
How long does plan review take?
Internal City reviews take up to 5 business days, and resubmittals up to 3; county and state reviews run alongside.
Do I need a permit to replace a water heater or air conditioner?
Yes. Water heaters, furnaces, air conditioners and ductwork all need permits; trade permits are a flat $80.
Do I need a permit for a fence or a shed?
Fences need a permit ($50 residential). Accessory buildings need one if they are over 200 sq ft.
What are the next-day inspection cutoffs?
Before 4:00 p.m. Monday–Thursday and before 11:00 a.m. Friday.
Does Chamblee allow third-party inspections?
Yes, under its approved third-party program, but the ordinance excludes fire-safety and erosion-control inspections.
Simplify Chamblee permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Georgia. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Chamblee sooner?
Let Alliance prepare, file, and track your Chamblee permits while your crew stays on the job.
More Georgia permitting guides
DeKalb County
Read guide →Brookhaven
Read guide →Clarkston
Read guide →Charlton County Building Permit Guide
Read guide →Chatham County Building Permit Guide
Read guide →Chattooga County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Chamblee permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.