The City of Panama City Building Services Division, part of Development Services at City Hall, 501 Harrison Avenue, issues building and trade permits inside city limits, and applications, plans, payments and inspections all run through Cloudpermit. A one- or two-family project is charged $4.10 per $1,000 of valuation ($40 minimum), and the city aims to start reviews within 24 business hours.
What requires a building permit in Panama City?
A permit must be issued before work begins to build, enlarge, alter, repair, move, demolish or change the occupancy of a building. The city’s own lists give the detail:
Permit required
- Remodels, decks and carports
- Sheds and accessory storage buildings, regardless of size
- Moving, removing or adding non-structural walls
- Water heater replacements
- New or extended electrical branch circuits or feeders
- Ductwork extensions
- Roofing, irrigation, insulation and structural work
- Electrical, mechanical and plumbing installations
No building permit
- Fences (a Development Order may still be needed)
- Repairs such as a broken fence rail
- Replacing appliances other than water heaters
- Painting your home
- Replacing or adding non-structural flooring
Some projects also need permits from other agencies, such as the Florida Department of Environmental Protection. Call 850-872-3025 before starting if you are unsure. To check that a property is inside the city, look up its Bay County tax area on qPublic: the City of Panama City is tax areas 16 and 31.
Panama City building department: who handles permitting
Building Services enforces the Florida Building Code: it reviews plans, issues permits for construction and building systems, inspects the work and grants certificates of occupancy. It works with Planning and Zoning (setbacks, easements and Development Orders), Engineering (stormwater review), Floodplain Management, the Fire Department and Environmental Compliance, all through the same Cloudpermit system.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Local office | Building Services, City Hall, 501 Harrison Avenue, Panama City, FL 32401 |
| Phone | 850-872-3025 |
| Payments and owner-builder affidavits | Development Services, City Hall Room 217 |
| Hours | City offices: Monday-Friday, 8 a.m.-5 p.m. |
| Apply | Cloudpermit (online or at the City Hall kiosk) |
Panama City permit types and online filing
Building Services issues building permits and separate permits for electrical, mechanical (HVAC), plumbing and gas work, plus roofing, demolition and mobile-home set-up permits. Apply online in Cloudpermit or at the public kiosk in the Building Services office, where staff can help. Hard copies and emailed plans are not accepted.
Contractor registration is free and done in Cloudpermit: upload the DBPR state licence, a driver’s licence or state ID, and liability and workers’ compensation certificates naming the City of Panama City, 501 Harrison Ave, as certificate holder (or a workers’ compensation exemption). Private provider registration is also free, and the use of a private provider must be stated on the application.
Owner-builders who own and occupy the property can get a permit under the state exemption, but must sign the owner-builder affidavit in person at Development Services, Room 217, and may only hire licensed subcontractors for licensed trades.
Panama City building permit cost
The city’s Permit Fee Schedule and Valuation Guide (updated September 23, 2026, under Resolution 20241008.7) sets fees as the greater of the minimum or the city valuation divided by 1,000 times the rate. For new construction the city works out valuation from the gross area under roof, the ICC Building Valuation Data figure and a city regional factor; remodels and repairs are valued on the actual work.
Not sure this scope needs a permit?
Get a free quote →| Project | Fee |
|---|---|
| One- or two-family new, addition, remodel or accessory | $4.10 per $1,000, $40 minimum |
| Residential plan review | $0.40 per $1,000, $40 minimum |
| Residential roof or re-roof | $40 flat |
| Commercial new, addition, remodel or roof | $5.50 per $1,000, $50 minimum |
| Commercial plan review | Half the permit fee |
| Mobile-home set-up | $100 |
| Demolition, no utilities | $50 for the first 2,000 sq ft, then $15 per 1,000 sq ft |
| Re-inspection | $50 |
| Failure to call for a required inspection | $50 |
| Contractor or private provider registration | $0 |
For example, a new home valued by the city at $300,000 has a permit fee of $1,230 and a plan review fee of $120, before trade permits and state surcharges. The state surcharges of 1% and 1.5% each carry their own $2 minimum. Work started before a required permit is charged double. The city’s older fee sheet listed minimums of $45 for residential and $55 for commercial permits; the September 2026 guide sets them at $40 and $50.
Once all departments have reviewed the application, the city emails an invoice that can be paid online by card, or by check or exact cash at City Hall, Room 217. Sewer impact fees for new construction are collected by the Utilities Division before the Development Order is approved.
Trade permits in Panama City
Electrical, mechanical (HVAC), plumbing and gas permits are issued by the Building Services Division. Under the 2026 guide:
| Permit | Fee |
|---|---|
| Plumbing, new, addition or alteration | $0.65 per $1,000, $40 minimum |
| HVAC, new, addition or alteration | $0.65 per $1,000, $40 minimum |
| Electrical, new, addition or alteration | $0.65 per $1,000, $40 minimum |
| Gas, residential | $40 flat |
| Gas, commercial up to 10 outlets | $40 flat |
| Mobile home electrical or split mechanical | $40 each |
Rather talk it over?
Call 1-855-478-4290 →All commercial water meters and residential irrigation meters need backflow protection under the city’s cross-connection control program, run by Environmental Compliance in Public Works.
Application documents and plan review
An issued Development Order from Planning and Zoning is required before building plan review starts, and review does not begin until every required document is in. Depending on the job, submittals include a survey, a site plan, a construction site staging plan, construction documents by a registered design professional where the law requires, a statement of special or threshold inspections, a geotechnical report and energy compliance forms. The site plan must be drawn from an accurate boundary survey and show distances to lot lines, street and finished grades, and any flood hazard areas, floodways and design flood elevations. Demolitions may also need confirmation that utilities are removed and an asbestos report.
The city does not publish a fixed review time but aims to begin reviews within 24 business hours of submission; completion depends on the type and complexity of the application. A preliminary site inspection may be required before a permit is issued.
Rather not deal with the Panama City building department?
Get a free quote →How to get a building permit in Panama City
Check the Bay County tax area (16 or 31) and list the building and trade permits the work needs.
Obtain any required Development Order from Planning and Zoning, and pay sewer impact fees for new construction.
Register as a contractor in Cloudpermit, or sign the owner-builder affidavit in Room 217, and assemble the digital plans and documents.
Apply online or at the City Hall kiosk; state any private provider on the application.
Answer review comments in Cloudpermit, then pay the emailed invoice online or at Room 217.
Record the Notice of Commencement where required, book inspections in Cloudpermit by 2:00 p.m., and request the certificate of completion or occupancy inspection to close the permit.
Inspections in Panama City
All inspections are scheduled in Cloudpermit, and the cut-off for next-business-day inspections is 2:00 p.m. Central Time. A complete, legible set of the approved permit documents must be on site in a weatherproof container for each inspection, and the permit copy should be posted facing the street. Occupied homes or businesses must have a representative aged 18 or older on site; unoccupied jobs need only provide access. Inspectors can generally reach a single-story roof; the contractor must provide access anywhere else.
Jobs with a direct contract price over $5,000 ($15,000 for HVAC replacements) need a Notice of Commencement filed with the Bay County Clerk of Court and posted on site before the first inspection. A permit is valid for 180 days after issue and lapses if work is not started, or is suspended, for 6 months; extensions must be requested in writing. To close a permit, request the Certificate of Completion or Occupancy inspection once every inspection has passed; a certificate of completion is used where no certificate of occupancy applies, such as a re-roof.
Florida building code
The Florida Building Code, 8th Edition (2023), has applied statewide since 31 December 2023; the Florida Building Commission has proposed the 9th Edition (2026) to take effect on 31 December 2026. Florida permit rules
Want this handled start to finish?
Get a free quote →Panama City permit search and official resources
These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.
- Florida Building Commission - current code
- Building Services Permit Fee Schedule
- City FAQs (permits and inspections)
- Permit application / online portal
- Building / permitting department
- Permit Fee Schedule & Valuation Guide, September 2026 (PDF)
- Building process and required submittals
- Permits, inspections and certificates
- Involved parties: zoning, engineering, floodplain and utilities
Panama City permit FAQ
Who issues building permits in Panama City?
The City of Panama City Building Services Division, part of Development Services at 501 Harrison Avenue, administers building permitting inside city limits. Call 850-872-3025.
How much is a building permit in Panama City?
For one- and two-family work, $4.10 per $1,000 of valuation with a $40 minimum, plus residential plan review at $0.40 per $1,000. A residential re-roof is a flat $40.
Inspections are where schedules slip.
Get a free quote →Do I need a permit for a fence in Panama City?
No building permit is needed for a fence, but you may need a Development Order; email planning@panamacity.gov to check.
Can a homeowner pull a permit?
Yes, an owner-occupant can use the owner-builder exemption, signing the affidavit in person at Room 217 in City Hall.
How long is a permit valid?
180 days after issue; request an extension in writing if you will not be ready for inspection in time.
What is the inspection cutoff?
Next-business-day inspection requests must be made in Cloudpermit by 2:00 p.m. Central Time.
Simplify Panama City permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Florida. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Panama City sooner?
Let Alliance prepare, file, and track your Panama City permits while your crew stays on the job.
More Florida permitting guides
Bay County
Read guide →Callaway
Read guide →Lynn Haven
Read guide →Parkland Building Permit Guide
Read guide →Pasco County Building Permit Guide
Read guide →Pembroke Pines Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Panama City permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.