Skip to main content
Municipal GuideFloridaOrmond Beach · Volusia County

Ormond Beach, Florida Building Permit Guide

To get a building permit in Ormond Beach, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

How to get a building permit in Ormond Beach, FL - local filing, fees, trade permits, inspections and official municipal resources.

Authority: City of Ormond Beach Building DivisionCode: Florida Building Code, 8th Edition (2023)Phone: 386-610-0540
Authority
City of Ormond Beach Building Division22 South Beach Street, Room 104, Ormond Beach, FL 32174
Apply Online
Tyler EnerGov Civic Access
Inspections
Online schedulingBefore 4:00 p.m. for the next business day
Code
FBC, 8th Ed. (2023)Effective Dec. 31, 2023

The City of Ormond Beach Building Division, in City Hall Room 104 at 22 South Beach Street, issues building, electrical, gas, mechanical and plumbing permits for work inside city limits, and applications are filed in Tyler EnerGov Civic Access. Under Ordinance 2026-16 most permits now carry flat fees: a new single-family home is $2,750 and a new pool $635.

What requires a building permit in Ormond Beach?

A permit is needed to build, enlarge, alter, repair, move or demolish a building or change its occupancy, and for any regulated electrical, gas, mechanical or plumbing work. The city’s permit forms are organized by project:

Permit required

  • New homes, additions and interior remodels
  • Detached garages, carports and sheds over 50 sq ft
  • Patios, decks and driveways
  • Docks and seawalls
  • Re-roofs, windows, doors, shutters, siding and garage doors
  • Pools, spas and screen enclosures
  • Generators and solar systems
  • Water heaters, tub or shower replacements and A/C units
  • Demolition, partial or complete
  • Repainting a commercial building

No permit

  • Carpeting and wood flooring
  • Tile
  • Cabinet replacement
  • Residential painting
  • Manufactured sheds under 50 sq ft with no permanent base or slab

Sheds from 50 to 150 sq ft and up to 10 ft tall need a permit and must sit at least 7.5 ft from the side and rear property lines, never in the front yard. Sheds of 121–150 sq ft also need signed and sealed engineering or Florida manufactured building approval.

Ormond Beach building department: who handles permitting

The Building Division accepts applications, reviews plans, issues permits, carries out building, fire and engineering inspections, and processes Business Tax Receipts. All permit and development invoices come only from the Tyler permitting system; the city never asks for payment by wire transfer, so call 386-610-0540 before paying any emailed fee request.

Short on time to read all of this?

Get a free quote →
Ormond Beach permitting contact
DetailInformation
Local office22 South Beach Street, Room 104, Ormond Beach, FL 32174
Phone386-610-0540
Emailbponline@ormondbeach.org
HoursMonday-Friday, 8:00 a.m.-5:00 p.m.
Apply and payTyler EnerGov Civic Access

Ormond Beach permit types and forms

Each project type on the city’s Permit Forms page has its own document set, usually the Building Permit Application, the Required Submittal Documents list, the Owner’s Disclosure Statement and the Notice of Commencement. Depending on the job, the city also asks for:

  • A Roll Off Form for accessory structures, additions and demolitions
  • An ELU form for additions and demolitions
  • A Surface Water Management Plan for residential sheds over 150 sq ft, patios, decks and driveways
  • A Tree Removal Application or Non Tree Removal Form for larger accessory structures
  • Longshore and harbor notice forms for docks

Every application must list all contractors with their licence numbers, and a signed and notarized Permit Application Affidavit must be uploaded on every permit.

Ormond Beach building permit cost

Ordinance 2026-16 replaced the city’s valuation-based fees with fees built from the actual cost of administration, plan review and inspections. Most permit types now have a fixed total:

Not sure this scope needs a permit?

Get a free quote →
Ormond Beach permit fees (Ordinance 2026-16)
ProjectFee
New single-family home or townhome (includes trades)$2,750; homes over 2,000 sq ft at $0.25 per sq ft
Residential addition up to 300 sq ft$140 plus $55 per inspection
Residential addition over 300 sq ft$210 plus $55 per inspection
Residential interior modifications$250 plus $55 per inspection
Re-roof$80 plus $5 per square up to 25 squares, then $3 per square
Windows and doors$155, plus $5 per opening after 10
New pool or spa$635 ($745 with screen enclosure)
Screen enclosure$290
Deck$210
Residential generator$230
Residential solar$250
Complete demolition$345

State surcharges of 1% and 1.5% of the building permit fee are added. Fire and life safety plan review is $0.05 per sq ft under roof. A third or later plan submittal costs $60, and revisions after issuance cost $40 to $60 or $60 an hour for major changes. Starting work without a permit adds a penalty of $200 or 100% of the permit fee, whichever is higher. An expired permit can be renewed for $50 within 180 days; after that, or after a code change, a new application is needed. Single-family projects that use a private provider get an 80% reduction in plan review and inspection fees.

Trade permits in Ormond Beach

The Building Division issues electrical, gas, mechanical and plumbing permits; new single-family homes and townhomes include all trade fees. List every contractor and licence number on the Civic Access application.

Rather talk it over?

Call 1-855-478-4290 →
Ormond Beach trade permit fees (Ordinance 2026-16)
PermitFee
Electrical, residential minimum$105
Electrical alterations$6.60 per circuit for 1–10; $50 plus $3.30 per circuit for 11 or more
Temporary pole or early power$55
Mechanical, minimum$105
New mechanical units$50 plus $55 per unit
Gas, up to 5 fixtures$210
Residential water heater$105
Residential tub or shower replacement$165
Utility connection inside the city$120

How to get a building permit in Ormond Beach

1. Confirm scope and jurisdiction

Check the property is inside Ormond Beach city limits and find your project on the city’s Permit Forms page.

2. Prepare documents

Gather the application, required submittal documents, owner’s disclosure and any roll-off, ELU, stormwater or tree forms, plus the notarized Permit Application Affidavit.

3. Owner-builders apply in person

Owners using the exemption come to Room 104 with proof of ownership and sign the owner-builder affidavit before city staff.

4. Submit in Civic Access

Complete the application in full, listing every contractor and licence number, and upload the files.

5. Review and pay

Track reviewer comments in Civic Access, resubmit corrections, and pay the city invoice issued through the Tyler system.

6. Inspect and close out

Schedule the inspections listed on the permit placard online and pay any inspection fees before the final.

Rather not deal with the building department?

Get a free quote →

Inspections in Ormond Beach

The inspections each job needs are listed on the permit placard. Schedule them online with the permit number from the front of the permit; requests made before 4:00 p.m. are done the next business day, and inspectors may arrive from 7:00 a.m. Time requests are not guaranteed, but indoor inspections at occupied homes are prioritized. The city’s inspectors cover building, fire and engineering inspections.

Extra building inspections cost $55. A re-inspection is $55 the first time, $100 the second and $200 the third or later time for the same item. After-hours, weekend or holiday inspections are $200. All outstanding inspection fees must be paid before the final building inspection, and work covered before it is inspected must be exposed again at the owner’s cost.

Local Ormond Beach details

Owner-builders: the property must be titled to the owner, not a corporation or trust, and the building must be for the owner’s own use, not rented, leased or sold within a year of completion. Owners may build or improve a commercial building only if the cost stays at or under $75,000, and may be asked to speak with the Building Official.

Substantial improvement: the city’s local building code amendments add up repairs and improvements over a five-year period. If their combined cost reaches 50% of the building’s market value, the work counts as a substantial improvement, and any repair after substantial damage counts as one too.

Commercial repainting: repainting a commercial building needs a permit, with color samples and a $15 fee.

Florida building code

The Florida Building Code, 8th Edition (2023), has applied statewide since 31 December 2023; the Florida Building Commission has proposed the 9th Edition (2026) to take effect on 31 December 2026. Florida permit rules

Want this handled start to finish?

Get a free quote →

Ormond Beach permit search and official resources

These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.

Ormond Beach permit FAQ

Who issues building permits in Ormond Beach?

The City of Ormond Beach Building Division, Room 104, 22 South Beach Street. Call 386-610-0540.

How much is a building permit in Ormond Beach?

Most permits have flat fees under Ordinance 2026-16: $2,750 for a new single-family home, $155 for windows and doors, $80 plus a per-square charge for a re-roof, and $635 for a new pool.

Do I need a permit for a shed?

Not for a manufactured shed under 50 sq ft with no permanent base. Sheds from 50 to 150 sq ft need a permit and a 7.5 ft side and rear setback.

Inspections are where schedules slip.

Get a free quote →

Can a homeowner pull a permit?

Yes, under the owner-builder exemption, if the property is in your own name and the building is for your own use. You must apply in person at Room 104.

When is the inspection cutoff?

Inspections scheduled before 4:00 p.m. are performed the following business day.

What does it cost to start work without a permit?

A penalty of $200 or 100% of the permit fee, whichever is higher, on top of the permit fee.

Simplify Ormond Beach permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Florida. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Ormond Beach sooner?

Let Alliance prepare, file, and track your Ormond Beach permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Ormond Beach permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.