In Griswold, building, electrical, mechanical, plumbing and demolition permits come from the Town’s Building and Zoning Enforcement office on the first floor of Town Hall, 28 Main Street, Jewett City. Applications are filed on the Town’s OpenGov portal, while plans are dropped off in person. Under the department’s fee sheet, updated on January 21, 2026, a week after a Special Town Meeting approved a building fee change, the first $2,000 of value costs $50 and each further $1,000 costs $16, with the 26-cent state education fee and a $20 certificate fee added to every building permit.
The office handles both building and zoning enforcement, and its permits cover the Borough of Jewett City as well as the rest of the town. It is open Monday to Wednesday, 8:30 a.m. to 4 p.m., Thursday until 6 p.m. and Friday, 8 a.m. to 1 p.m.; call 860-376-7060, extension 2110 for building or 2112 for zoning. Septic and well approvals come from the Uncas Health District, which Griswold shares with Montville, Norwich and other nearby towns.
The Borough of Jewett City, with its own Warden and Burgesses at 2 North Main Street, sits inside the town. Its properties get building permits from this office; the Town’s new-home guide adds a Jewett City utilities step for them.
Online applications, paper plans. The office says permits are now only available online through OpenGov and that project plans must be dropped off in person; you can pay online by card or e-check, or come in with cash or a check. State law, section 29-263(a), lets an applicant file in person, by mail or by email in the manner the building official sets, so call 860-376-7060, extension 2110, if you cannot use the portal.
What requires a building permit in Griswold?
The office tells property owners that most changes to a structure or property need a building permit, a zoning permit or both, and says plan review is required for every proposed structure. Its OpenGov permit types and fee schedule show the range: building work, new construction, demolition, electrical, mechanical and plumbing permits, mobile home placements, and removal permits for small structures and pools.
Permit required
- New houses, multifamily, commercial and industrial buildings
- Additions, decks and garages
- Swimming pools, self-setting inflatable pools included
- Changes of use
- Electrical, heating, ventilation, air conditioning and plumbing
- Placing or replacing a mobile home
- Demolition, and removal of above-ground pools or small sheds, decks and porches
No building permit under the state code
- One-story detached sheds of 200 sq ft or less (the Land Use portal has a minor accessory structure permit for structures under 200 sq ft)
- Fences not over 7 feet; pool barriers still need a permit
- Retaining walls up to 3 feet holding back no surcharge
- Walks and patios on grade, not more than 30 inches above adjacent grade and not over any basement or story below
Short on time to read all of this?
Get a free quote →What the town decides and what the state holds
Chapter 127 of the Code of Ordinances adopts the State Building Code, now the 2022 Connecticut State Building Code for applications filed since October 1, 2022; the 2026 edition is delayed and will apply by filing date. The Town decides its fees by Town Meeting: on January 13, 2026, voters unanimously approved the repeal and replacement of section 143-1A(1) of the fee chapter, the building department fee change the Building Official had submitted and the Board of Selectmen sent to the meeting on December 23, 2025. The Town also sets the senior fee exemption, the zoning regulations and maps for the Town and the Borough, and its flood damage rules in chapter 151.
Connecticut has one State Building Code: the code itself sets which work needs a permit and which is exempt, every town’s building official is licensed by the State Building Inspector, and there is no county government. Connecticut rules
Griswold building department: who handles permitting
Building and Zoning Enforcement reviews plans, issues permits and inspects construction for the materials, structure and zoning compliance of buildings, and investigates building and zoning complaints. Its staff include the building and zoning enforcement officer and an assistant to the building official. Planning and Community Development handles the Planning and Zoning, Inland Wetlands and Aquifer Protection applications. The Fire Marshal’s office covers the Town and the Borough, reviewing plans for buildings of three or more families and commercial buildings and inspecting wood stoves.
| Detail | Information |
|---|---|
| Building and Zoning Enforcement | Town Hall, first floor, 28 Main Street, Jewett City, CT 06351 |
| Phone | 860-376-7060, ext. 2110 (building), ext. 2112 (zoning); fax 860-376-7070 |
| Hours | Monday to Wednesday 8:30 a.m. to 4 p.m.; Thursday to 6 p.m.; Friday 8 a.m. to 1 p.m. |
| Online filing | OpenGov (griswoldct.portal.opengov.com) |
| Fire Marshal | 860-376-7060, ext. 2107; Thursday 4 to 7 p.m., Saturday by appointment |
| Uncas Health District | 401 West Thames Street, Building 100, Norwich; 860-823-1189, ext. 113 |
Permit types
OpenGov splits building work into two applications. The Application for New Construction is for new single-family and multifamily houses and new commercial and industrial buildings; the Application for Building Permit covers all other work requiring a permit under the 2022 code. Electrical, mechanical (heating, ventilation and air conditioning) and plumbing permits, demolition, removal permits and, under Land Use, a minor accessory structure permit for structures under 200 sq ft are separate types.
Not sure this scope needs a permit?
Get a free quote →Residential permits
For a new house, one full-size set of construction plans still has to be dropped off in person. The Town’s new home guideline sheet lists what goes with it: a driveway apron bond posted with the Building Department, with a copy of the street card; Uncas Health District approval; an energy compliance report; foundation, framing and floor plans with room uses; uplift anchoring and hold-downs; window and door sizes; joist, rafter and beam sizes and spans; licenses and liability insurance for each contractor; and copies of any planning, zoning or wetlands approvals. Specially designed floors, beams or rafters need a sealed and signed engineer’s or architect’s sheet. In the Borough of Jewett City, a letter from the Jewett City Department of Public Utilities confirming sewer buy-in and water tie-in fees are approved and paid replaces the Uncas step.
Additions, decks, garages, pools and changes of use need Uncas Health District approval before the application is filed; the district gives out its application at 860-823-1189, extension 113. Self-setting inflatable pools need a building permit and the district’s approval too.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
Commercial, industrial and multifamily buildings use the new construction application with two full-size sets of plans, one for the building official and one for the Fire Marshal, dropped off in person. The Fire Marshal reviews plans for buildings of three or more families and commercial buildings, and asks for a week’s notice before its services are needed. The fee sheet says values are worked out with the International Code Council’s building valuation data and use groups.
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning: setbacks are checked by the zoning side of the same office; if they cannot be met, a Zoning Board of Appeals variance comes first. A $20 zoning fee applies to new structures.
- Wetlands: work within 75 feet of a wetland or waterway may need an inland wetlands permit.
- Health: Uncas Health District approval for additions, decks, garages, pools and changes of use.
- Driveway apron: a $1,000 bond and a $50 inspection fee; the bond is refunded once the apron is approved.
Rather talk it over?
Call 1-855-478-4290 →Griswold permit costs and fees
The building department’s posted fee sheet rounds the estimated value up to the next thousand and charges $50 for the first $2,000 and $16 for each further $1,000. The state education fee of 26 cents per $1,000 is added to every permit, and a $20 certificate of occupancy or approval fee is added to every building permit. The codified chapter 143 on the code website, current only through July 2024, still shows the 2017 schedule of $16.26 per $1,000 and a $5 certificate fee. The January 13, 2026 Town Meeting replaced section 143-1A(1); its notice and minutes do not print the new amounts, and the posted sheet is the one the office applies.
| Item | Fee or rule |
|---|---|
| First $2,000 of value (minimum fee) | $50 |
| Each further $1,000, value rounded up | $16 |
| State education fee | 26 cents per $1,000, on every permit; never waived |
| Certificate of occupancy or approval | $20 on every building permit |
| Zoning fee, new structures | $20 |
| Mobile home or trailer placement | $25.26 per $1,000 of value |
| Demolition | $16 per $1,000 of assessed value, minimum $50 |
| Removal permit (small structures, pools, mobile homes outside a park) | $50 |
| Re-inspection | $50 each time |
| Work done without a permit / work under way without a permit | $250 / $200, on top of the permit fee |
Worked example. A $25,000 kitchen remodel falls on the fee sheet’s $24,001 to $25,000 line: $418 for the Town and $6.50 for the state, $424.50, plus the $20 certificate of approval fee, for $444.50 in all.
No Town fee is charged for a permit for work on the roofing, siding, windows, or electrical or heating system of an owner-occupied single-family home where one owner of record is 62 or older, with proof of age; the state education fee is still due when the application is submitted.
Rather not deal with the building department?
Get a free quote →Trade permits and who may pull them
Electrical, mechanical and plumbing permits are separate OpenGov applications charged on the same value-based schedule, and the new home guide asks for current licenses and liability insurance for each contractor or tradesperson the permit covers. A gas pressure test and rough electrical, plumbing and mechanical inspections are part of the required list.
Griswold papers
- License and liability insurance for every contractor on the permit
- Demolition insurance of at least $100,000 / $300,000 bodily injury and $50,000 / $100,000 property damage
- Uncas Health District approval where required
State licensing
- Trade licenses: Department of Consumer Protection
- Home improvement and new home construction registrations: Department of Consumer Protection
The office reminds homeowners that they are responsible for every permit and approval needed for work on their property, whether they or a contractor do the work, and for having it inspected, final inspection included.
How to apply for a Griswold building permit
Ask the zoning side about setbacks, variances and work within 75 feet of wetlands.
Uncas Health District approval, or in Jewett City the utilities department letter for a new home.
For a new driveway apron, post the $1,000 bond and $50 inspection fee.
Pick the new construction or building permit application, or the trade permit.
Bring the full-size plan sets to Town Hall.
Pay online or at the office, then call 24 hours ahead for each inspection.
Review, corrections and what causes delay
The office warns that a project’s start may be delayed without the right approvals in hand before the application. Missing Uncas approval, a needed variance, a wetlands permit, plans not yet dropped off, or contractor licenses and insurance not attached are the common causes. State law requires a permit to be issued or refused within 30 days of the application date.
Demolition needs a certificate of insurance written for demolition with the statutory limits, naming the Town as held harmless. When a structure is removed under a removal permit, call the office straight away so it can be released from further taxation.
Want this handled start to finish?
Get a free quote →Inspections in Griswold
Every permit needs inspections, requested 24 hours ahead and made first come, first served; failing to call for an inspection is grounds to revoke the permit. The required list is footings and forms, foundation waterproofing and drains before backfill, rough framing with anchoring and hurricane tie-downs, the chimney smoke chamber, rough plumbing, electrical and mechanical before insulation, the gas pressure test, insulation, sheetrock before taping, and the final for the certificate of occupancy or compliance. Coordinating the Fire Marshal, the zoning enforcement officer, the sanitarian and the Town Planner is up to the person requesting the inspection.
A permit must have an inspection at least every 180 days to stay valid. If it lapses, you apply to reinstate it and pay again at the current fee rates. Re-inspections cost $50 each, and an inspection asked for outside a permit, such as an older wood stove or pool, is $50 on written request.
Griswold permit search and official resources
Building records are public, and the office keeps them open for viewing during its hours at Town Hall; OpenGov holds the records for permits filed there. Griswold and the Borough of Jewett City take part in the National Flood Insurance Program separately, both with flood maps dated August 1, 2023, and under chapter 151 the Building Official reviews every new building or substantial improvement for flood safety.
- Griswold Building and Zoning Enforcement
- Griswold OpenGov permit portal
- Griswold building department permit fees (2026)
- Griswold Special Town Meeting minutes, January 13, 2026
- Griswold new home construction permit guidelines
- Griswold required inspections list
- Griswold Code of Ordinances (chapters 127, 143 and 151)
- Griswold Planning and Community Development
- Griswold Fire Marshal
- Uncas Health District
- Borough of Jewett City
- FEMA Community Status Book for Connecticut
- Connecticut Department of Consumer Protection: licenses and registrations
Inspections are where schedules slip.
Get a free quote →Griswold building permit FAQ
Who issues building permits in Griswold and Jewett City?
The Town’s Building and Zoning Enforcement office at Town Hall, 28 Main Street, Jewett City; call 860-376-7060, extension 2110.
How much is a building permit in Griswold?
$50 for the first $2,000 and $16 for each further $1,000, plus 26 cents per $1,000 and a $20 certificate fee. A $25,000 job pays $444.50.
Can I apply on paper?
The office takes applications online through OpenGov, with plans dropped off in person; call if you cannot use the portal.
Do seniors pay permit fees?
Not the Town fee for roofing, siding, windows, electrical or heating on an owner-occupied single-family home with an owner aged 62 or over; the state fee still applies.
Does an inflatable pool need a permit?
Yes. A self-setting inflatable pool needs a building permit and Uncas Health District approval.
How often must a permit be inspected?
At least every 180 days, or the permit expires and must be reinstated at current fees.
Simplify Griswold permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Connecticut. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Griswold sooner?
Let Alliance prepare, file, and track your Griswold permits while your crew stays on the job.
More Connecticut permitting guides
New London County
Read guide →Colchester
Read guide →East Lyme
Read guide →Groton Building Permit Guide
Read guide →Guilford Building Permit Guide
Read guide →Hamden Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Griswold permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.