Building permits inside Glenwood Springs come from the City’s Building Department on the second floor of City Hall, 101 W. 8th Street (970-384-6450). Applications are accepted only through the online customer portal; paper and emailed applications are refused. Fees follow Table 1-A in the Municipal Code, with a plan review fee of 65% added, and small jobs have flat fees such as $80 for a re-roof. Electrical permits are the one exception: they are issued by the State Electrical Inspector.
What requires a building permit in Glenwood Springs?
The City’s rule is short: altering, repairing, moving or demolishing any building or structure inside city limits needs a building permit. Its 2026 permit guides add the thresholds for the commonest small jobs.
Permit required
- New homes, townhomes, duplexes, triplexes and fourplexes, and larger residential or commercial buildings
- Accessory structures over 120 sq ft
- Replacing more than 100 sq ft of roofing
- Replacing any exterior door or window, or an interior one that affects a required exit
- Replacing or altering a gas or electric water heater
- A deck, patio or porch that is over 200 sq ft, more than 30 inches above grade at any point, attached to the dwelling, serving a required exit door, or on a commercial property
- Solar panels
- Demolition
No permit needed
- Interior and exterior painting (the City limits exterior colors)
- New flooring, carpet or tile
- Swapping toilets, sinks and faucets without moving plumbing, walls or wiring
- Cabinets and countertops
- Replacing appliances and light fixtures
- Fixing a leaky pipe or a clogged drain
- One-story detached sheds and playhouses of 120 sq ft or less
- Fences not over 6 ft high
- Retaining walls not over 4 ft from the bottom of the footing
An exempt shed still has to respect the City’s placement limits, and an accessory building cannot be used for living or sleeping unless it is approved as an Accessory Dwelling Unit.
Who issues building permits in Glenwood Springs?
The Building Department is part of Community Development. It reviews plans, issues building and planning permits, licenses contractors, runs BEST Card testing and inspects construction. Victor Meraz is the Building Official. Staff speak Spanish.
| Detail | Information |
|---|---|
| Office | City Hall, 101 W. 8th Street, Second Floor, Glenwood Springs, CO 81601 |
| Permits and licences | 970-384-6450; building@cogs.us |
| Inspection hotline | 970-384-6432 |
| Building Official | Victor Meraz, 970-384-6410 |
| Applications | Online customer portal only |
| City Hall hours | Monday to Thursday, 7:30 a.m. to 5:30 p.m.; closed Fridays |
Short on time to read all of this?
Get a free quote →The City’s permits end at the city boundary; the permit guides tell applicants to check their address against it first. Unincorporated land around the city, including addresses with a Glenwood Springs postal address, is permitted by Garfield County’s Building Division, which happens to have its office in the city at 108 8th Street (970-945-8212).
Glenwood Springs permit types and the customer portal
Create an account in the online customer portal (people who already pay City utilities online may have one), choose the permit type and upload PDFs. The City posts step-by-step guides for creating an account, applying for a permit and applying for a contractor licence. All messages about the application go to the account’s email address.
- New Construction, 4 or Fewer Units. Covers a house, townhome, duplex, triplex or fourplex, in any combination up to 4 units.
- New Construction, 5 or More Units. Only for projects City Council has already approved. These start with a planner, a pre-application meeting requested in the portal, and minor or major architectural plan review.
- New Accessory Structure. For storage, hobby or play buildings over 120 sq ft.
- Roofing, deck, window and door, water heater and solar permits, each with its own guide and checklist.
- Demolition permit, filed online with the State health department’s Demolition Notification Application Form and the City’s Deconstruction and Diversion Agreement.
- Change of use, temporary sales use, food truck, ADU and vacation rental permits, also handled by this department.
Contractor licences. Anyone paid to build, alter, repair, move or demolish a structure, subcontractors included, must hold a City licence before a permit is issued. Licences go to individuals, not companies, and last 1 year: $200 for Class-AA Unlimited, $175 for Class-A Commercial Limited, $150 for Class-B Light Commercial, $125 for Class-C Homebuilder and $75 for Class-D Specialty or alarm installer. Each needs ICC certification or the matching BEST Card and insurance of $500,000 (Classes AA, A and B) or $300,000 (Classes C and D) naming the City as certificate holder.
Glenwood Springs permit fees
Building permit fees are in Table 1-A of Municipal Code Section 060.020.020, a section last amended by Ordinance 1-2026 in February 2026. The value used is the total value of the work, materials and labor, and the Building Official uses the higher of the applicant’s figure and the International Code Council valuation data. The City also offers an online Permit Fee Estimator.
| Valuation | Permit fee |
|---|---|
| $1 to $500 | $23.50 |
| $501 to $2,000 | $23.50 for the first $500 plus $3.05 per additional $100 or fraction |
| $2,001 to $25,000 | $69.25 for the first $2,000 plus $14 per additional $1,000 or fraction |
| $25,001 to $50,000 | $391.25 for the first $25,000 plus $10.10 per additional $1,000 or fraction |
| $50,001 to $100,000 | $643.75 for the first $50,000 plus $7 per additional $1,000 or fraction |
| $100,001 to $500,000 | $993.75 for the first $100,000 plus $5.60 per additional $1,000 or fraction |
| $500,001 to $1,000,000 | $3,233.75 for the first $500,000 plus $4.75 per additional $1,000 or fraction |
| $1,000,001 and up | $5,608.75 for the first $1,000,000 plus $3.15 per additional $1,000 or fraction |
Not sure this scope needs a permit?
Get a free quote →The plan review fee is 65% of the permit fee, is paid when the plans are submitted and is charged in addition to the permit fee. A $300,000 project therefore pays $993.75 plus 200 × $5.60, or $2,113.75, and a plan review fee of $1,373.94: $3,487.69 before use tax and system improvement fees.
| Item | Fee |
|---|---|
| Re-roof | $80. The code table sets $60 for one building, or $80 when two inspections are made; the City’s July 2026 roofing guide requires three (decking, dry-in and final), so the $80 rate is the one charged |
| Window or door replacement | $100 |
| Demolition or moved building | $60 |
| Lawn sprinkler system; excavation on private property | $60 each |
| Manufactured or mobile home, no permanent foundation | $200 |
| Solar panels | $50 per hour of review, up to $500 residential or $2,000 nonresidential; most are $100 |
| City sales and use tax | 4.2% of the cost of materials |
| Re-inspection | $100 per hour; $250 per hour for a second; $500 per hour for a third or later one |
| Inspection outside business hours | $100 per hour, 2-hour minimum |
| Work started without a permit | Investigation fee equal to the permit fee, on top of it |
| Temporary Certificate of Occupancy deposit | $1,000 commercial or multi-family; $250 residential; returned less $100 |
Do not buy materials before the permit is issued: each building permit carries a tax exemption number that vendors accept in place of City sales tax, because the City collects its 4.2% with the permit instead. New development also pays one-time system improvement fees for water, sewer, fire, schools and parks. The City’s own estimates are $21,400 for a single-family home with up to 4 bedrooms and 2 bathrooms and $5,300 for an accessory dwelling unit.
Rather talk it over?
Call 1-855-478-4290 →Electrical, plumbing and mechanical work in Glenwood Springs
Electrical. The Municipal Code makes the State Electrical Inspector the electrical inspector for the City and applies the National Electrical Code as adopted and amended by the State, which is the 2026 edition from August 1, 2026. No wiring may be altered or installed without a permit from the State, and power is not turned on until the State inspector has approved and tagged the installation. On a City application the electrical value is given as a separate figure.
Plumbing, mechanical and gas. These are City permits under the 2021 International Plumbing, Mechanical and Fuel Gas Codes. A plumbing permit is issued only to a plumbing contractor who is licensed by the State and registered with the City, which checks the licence before registering. The one exception is an owner working on a property that is their registered homestead and where they live. To change the plumber named on a permit, the original plumber, the general contractor and the new plumber each have to write to the Building Department. Inspectors ask to see the licence of anyone doing plumbing work and report unlicensed workers to the State.
Water heaters. A replacement needs a permit and 3 inspections: flue pressure test, plumbing rough and final. For an emergency replacement, call 970-384-6450 before starting; the permit is still required.
Submittal documents and plan review
The portal will not take an application until every required document is attached as a PDF.
New construction, 4 or fewer units
- Architectural plans
- Structural plans
- Civil plans
- Site plan and survey
- Soils or geotechnical report
- Drainage report or letter
- Landscape and irrigation plan
- Mechanical, electrical and plumbing plans
- Construction Management Plan and checklist
Small projects
- Roofing: manufacturer specifications, a roofing plan and a Construction Management Plan
- Deck, patio or porch: architectural plans, structural plans, a site plan with distances to property lines, and the Construction Management Plan checklist
- Accessory structure: architectural and civil plans, drainage report or letter, site plan and Construction Management Plan
- Solar: site plan and a structural engineer’s letter covering panel weight, truss capacity, roof snow load, roof age, wind rating and mounting hardware
Published review times: 3 to 7 business days for roofing, window and door, and water heater permits; an average of 14 business days for the first review of a deck, which may need more than one round; and 10 days for a complete solar application. The City gives no fixed time for new buildings. Plans for a deck do not need a stamp unless an architect prepared them.
Rather not deal with the building department?
Get a free quote →How to apply: 6 steps for Glenwood Springs
Confirm the address is inside city limits; outside them, apply to Garfield County instead.
Every contractor and subcontractor needs a City licence. A homeowner living in the home may do the work with no more than one helper at a time.
Work out material and labor costs and the square footage; wait for the permit’s tax exemption number before purchasing.
Create or sign in to your account, pick the permit type and upload each required PDF.
When staff approve the application you receive an email with the permit fee and use tax. Pay in the portal, in person at City Hall, or by mailed check quoting the invoice number.
Use the portal by 5:30 p.m. the day before, or the hotline before 7:00 a.m. on the day.
Glenwood Springs inspections and closeout
The contractor, owner or owner’s agent has to request each inspection; photographs do not count, and covered work may have to be opened up at your expense. Requests made in the customer portal must be in before 5:30 p.m. on the day before the inspection. Requests left on the Inspection Hotline, 970-384-6432, must be in before 7:00 a.m. on the day itself, with the permit number, address, type of inspection and an on-site contact’s name and phone number. A date and time are not final until the inspector phones that morning to confirm someone will be on site.
- Roofs: decking, dry-in at the mid-point, and final.
- Decks: footing before concrete, structural, and final, plus roof decking and dry-in if the deck is covered. Exterior electrical work adds a State inspection.
- Windows and doors: shimming and insulation before drywall and trim, then final. Working smoke and carbon monoxide detectors are required for the final.
- Solar: the bracketing before installation, then final.
A permit is issued for 180 days and each passed inspection extends it by another 180. The Building Official can grant at most two written extensions of up to 180 days each, and no permit runs beyond 4½ years from issue. A temporary Certificate of Occupancy lasts no more than 180 days; each extension costs $50 for a residence or $100 for a commercial or multi-family building.
Local Glenwood Springs details that matter
Wildfire code citywide. The City adopted the Colorado Wildfire Resiliency Code by Ordinance 4-2026 in March 2026, and every address in Glenwood Springs falls under its Class 2 requirements. New roofs and re-roofs must be Class A, deck materials must be Class A or ignition-resistant, gutters must be noncombustible and the first 5 ft around a structure must be noncombustible ground cover. When work replaces only part of a building the code applies to that part, unless the footprint grows by 500 sq ft or more.
Want this handled start to finish?
Get a free quote →Home fire sprinklers. The City’s amendment to the residential code requires an automatic sprinkler system in new one- and two-family dwellings of 2,000 sq ft or more, and in some smaller ones with unprotected I-joist floors or difficult access. Accessory dwelling units, and additions or alterations to homes without sprinklers, are excepted.
Snow and frost. Decks are designed for a snow load of at least 40 psf, with more for hot tubs. The frost line is 36 inches. Roofs must be designed so that snow does not shed onto gas or electric meters, exit doors, patios or decks.
Construction Management Plan. Most permits need the City’s checklist showing dumpsters, off-site parking and material storage. Storing anything in the public right-of-way needs a separate permit from the Engineering Department, and toilets must be provided for workers until the Certificate of Occupancy.
BEST Card. Building officials in the Roaring Fork Valley share a contractor test, the BEST Card. Glenwood Springs holds the open-book exam at City Hall, up to 4 seats a day; the test fee runs from $125 for Class-AA down to $60 for Class-C Homebuilder, the pass mark is 75% and the card is valid for 3 years.
Owner-builders. A homeowner may take out only one single-family building permit in any 12 months, and building more than one residence in 3 years requires a contractor licence.
Colorado building code
Colorado has no statewide building code for private buildings: each city and county decides whether a code applies and which edition, while the state sets electrical and plumbing rules, a minimum energy code on any update, and a wildfire code for the mapped wildland-urban interface. Building codes in Colorado
Inspections are where schedules slip.
Get a free quote →Official Glenwood Springs permit resources
- City of Glenwood Springs Building Department
- Glenwood Springs building permits: what needs a permit and required documents
- Glenwood Springs online customer portal
- Glenwood Springs Municipal Code, Title 060: building codes and fee table
- Glenwood Springs permit guides: roof, deck, window, water heater, wildfire code
- Glenwood Springs contractor licensing
- BEST Card certification
- Glenwood Springs solar panel permits
- Glenwood Springs system improvement fees
- Glenwood Springs planning forms, permits and applications
- Garfield County building permits (outside city limits)
Glenwood Springs building-permit FAQs
Does Glenwood Springs accept paper or emailed building applications?
No. Building permits and contractor licences are applied for only through the City’s online customer portal.
How much is a building permit in Glenwood Springs?
It follows Table 1-A in the Municipal Code. A $300,000 project pays a $2,113.75 permit fee and a $1,373.94 plan review fee, plus 4.2% use tax on materials. A re-roof is $80 and a window or door replacement $100.
Does a small shed need a permit?
Not if it is a one-story detached storage shed or playhouse of 120 sq ft or less, but the City still limits where it can go.
Do I need a permit for a deck in Glenwood Springs?
Yes if it is over 200 sq ft, more than 30 inches above grade at any point, attached to the house, or serves a required exit door.
Who issues electrical permits?
The State Electrical Inspector. Plumbing and mechanical permits come from the City.
Can a homeowner do the work without a licensed contractor?
Yes, on the home they live in, with no more than one helper at a time. An owner is limited to one single-family building permit in any 12 months.
How do I schedule an inspection?
In the customer portal by 5:30 p.m. the day before, or on the Inspection Hotline, 970-384-6432, before 7:00 a.m. the same day.
How long does review take?
The City quotes 3 to 7 business days for roofing, window and water heater permits and about 14 business days for a first deck review.
Simplify Glenwood Springs permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Colorado. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Glenwood Springs sooner?
Let Alliance prepare, file, and track your Glenwood Springs permits while your crew stays on the job.
More Colorado permitting guides
This guide is provided by Alliance Permitting for general information about Glenwood Springs permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.