In Suisun City, building permits are issued by the Building Division of Development Services at City Hall, 701 Civic Center Boulevard (707-421-7317; buildingpermit@suisun.com; the Building & Public Works office line on city forms is 707-421-7310). Applications go through the city’s online permit portal; the counter is open Monday and Wednesday, and Tuesday and Thursday by appointment. The newest fee schedule the city posts is the FY 2023–24 Master Fee Schedule (Resolution 2023-90), which sets flat fees such as $262 for a residential re-roof.
What requires a building permit in Suisun City?
The Building Division asks owners to consult it before starting alterations to a home, business or property, because it decides whether a permit is needed. Its fee schedule shows the residential work it permits: remodels, kitchens and baths, re-roofs, siding and stucco, sheds, patio covers and porches, decks, fireplaces and chimney repairs, demolition, solar and trade work such as air conditioners, furnaces, wall heaters, duct work and plumbing fixtures. New buildings, additions and conversions follow the full plan and inspection sequence in the city’s permit handout.
Permit commonly needed
- Additions, conversions and new buildings
- Kitchen, bath and other remodels
- Re-roofs, siding and stucco
- Sheds, patio covers, porches and decks
- Fireplaces and chimney repairs
- Air conditioners, furnaces and plumbing fixtures
- Demolition
Ask the Building Division first
- Small repairs or replacements you think may be exempt
- Work on a building listed as unreinforced masonry
- Projects that may need Planning review for zoning
Plans submitted for a permit may also go to the Planning Division to confirm they meet zoning rules. Construction and demolition projects, including additions and alterations, must divert at least 50% of their non-hazardous debris from landfill, and the city will not final the permit until that is documented.
What Suisun City decides and what the state holds
The Building Division administers and enforces the city’s building codes, fire codes and ordinances, including fire safety inspections. One local program is the Seismic Hazards Identification Program in Municipal Code chapter 15.60: state law and the code require the city to keep a list of unreinforced masonry buildings, and owners of listed buildings must take specific safety steps. Contractor licensing is a state matter; the city asks for a licensed contractor declaration with each permit and requires a city business license.
Short on time to read all of this?
Get a free quote →Suisun City building department: who handles permitting
Permits are issued by the Building Division, which the city describes as a permit technician, a contract inspector and contract plan check services. It handles plan review, permit processing, field inspections, fire safety inspections and public information on new construction, and it works with the Planning Division and the Public Works Engineering Division. The Development Services Director is Ricky Caperton. Land outside the city limits is unincorporated Solano County, permitted by the county’s Building & Safety Services.
| Detail | Information |
|---|---|
| Building Division | 707-421-7317; fax 707-429-3758; buildingpermit@suisun.com |
| Inspection requests | 707-421-7319 or the online portal |
| Office | City Hall, 701 Civic Center Boulevard, Suisun City, CA 94585 |
| Counter hours | Monday and Wednesday 9 a.m. to noon and 1 to 5 p.m.; Tuesday and Thursday by appointment; closed Friday to Sunday |
| Planning Division | planning@suisun.com; developmentservices@suisun.com |
| Business license safety inspections | Building & Public Works, 707-421-7310 |
Suisun City permit types
All building applications start in the city’s Tyler self-service permit portal, which the city supports with an account registration guide and a general application guide. Two forms go with most residential permits: the smoke and carbon monoxide self-certification and the licensed contractor declaration.
Residential permits
The city’s handout sets out what a homeowner’s plan set needs; plans do not have to come from a professional draftsman, but they must be electronic, to scale and show:
- a plot plan at 1/8 inch to the foot or larger, with the project’s position relative to existing buildings, property lines and utility easements;
- a foundation detail with footing type and size, matching the existing foundation type for additions;
- framing details for floor, wall and roof systems with coverings and insulation;
- a floor plan with walls, doors and windows, outlets, mechanical equipment, plumbing fixtures and smoke detectors;
- elevations, and Title 24 energy compliance documents.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Commercial and multifamily work is reviewed by the city’s contract plan check service and inspected by its contract inspector; new commercial buildings are charged by occupancy type and square footage under the new construction tables. A commercial business opening in the city also needs a safety inspection from Building & Public Works before its business license can be approved.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Planning: the Planning Division checks projects against the General Plan, zoning code and CEQA, and major proposals go to the Planning Commission or City Council.
- Home businesses: a home occupation permit from Development Services is required before a home-based business license is issued.
- Regional agencies: the Planning Division works with the Bay Conservation and Development Commission, the Suisun Resource Conservation District, the Solano County Airport Land Use Commission and Solano County Resource Management on projects within their reach.
Suisun City permit costs and fees
The Fee Schedules page posts the FY 2023–24 Master Fee Schedule adopted June 27, 2023 by Resolution 2023-90; the city says fees are reviewed at least annually in the budget process. New construction is priced by occupancy and square footage, while common residential jobs have flat fees:
| Item | Fee |
|---|---|
| Residential remodel, under 300 sq ft | $641 |
| Kitchen or bath remodel, up to 300 sq ft | $769 each |
| Additional remodel area | $301 per 300 sq ft |
| Re-roof, residential | $262 |
| Re-roof, multifamily or commercial, up to 500 sq ft | $403 |
| Siding or stucco, up to 400 sq ft / each additional 400 sq ft | $291 / $159 |
| Shed, or covered or enclosed patio or porch | $319 |
| Wood deck / with railing | $198 / $230 |
| Residential demolition, up to 3,000 sq ft | $483 |
| Fireplace, pre-fabricated / masonry | $634 / $729 |
| Mechanical, plumbing or electrical permit issuance | $98 |
| Mechanical units (A/C, furnace, wall heater) and plumbing fixtures | $196 each |
| Standard hourly rate | $130 |
| General plan fee | $10 per permit |
Rather talk it over?
Call 1-855-478-4290 →A replacement job card costs $81, and commercial solar is $281 for the first 4 kW plus $103 per added kilowatt. New homes pay development impact fees; the 2023 rates in the schedule for a single-family unit are $1,008 for fire facilities, $108 for municipal facilities, $3,377 for OSSIP, $9,321 for park improvements and $862 for police facilities, and ADUs under 750 square feet are exempt. The posted schedule dates from 2023, and the city reviews its fees at least once a year, so a current invoice can differ from these figures.
Trade permits and who may pull them
Mechanical, plumbing and electrical permits are issued by the Building Division alongside building permits. Each carries a $98 issuance fee plus unit fees: $196 for each residential air conditioner, furnace, wall heater, air handler, duct system, vent fan or exhaust hood, and $196 per plumbing fixture; other mechanical inspections are $130 an hour.
- Contractors: applications include the licensed contractor declaration, and every contractor working in the city needs a Suisun City business license under Title 5 of the City Code, applied for online through the city’s business license portal.
- The declaration form: the same one-page form carries the owner-builder declaration (the owner, or employees paid wages only, doing the work on a structure not intended or offered for sale), the workers’ compensation declaration or certificate of exemption, the Division of Industrial Safety permit statement, a Bay Area Air Quality Management District Authority to Construct number where equipment may cause air pollution, and a hazardous materials certification that must be satisfied before a certificate of occupancy.
- Smoke and CO alarms: owners or contractors sign the city’s self-certification form.
- Fire safety: the Building Division enforces the fire code and carries out fire safety inspections; fire prevention fees are part of the Master Fee Schedule.
How to apply for a Suisun City building permit
Confirm whether the work needs a permit and whether Planning must review it.
Create an account using the city’s account registration guide.
Follow the Requirements to Obtain a Building Permit handout for plot, foundation, framing and floor plans.
Upload the licensed contractor declaration, the smoke and CO certification and Title 24 energy forms.
Contract plan check reviews the set; correct and resubmit as asked.
Pay the invoiced fees, then keep the inspection card on site.
Rather not deal with the Suisun City building department?
Get a free quote →Review, corrections and what causes delay
Plan check is handled by the city’s contract plan check service, and the permit handout lists the drawings and Title 24 energy documents every set must include; plans may also be routed to the Planning Division for a zoning check. Counter help is limited to Monday and Wednesday, with Tuesday and Thursday appointments, so email buildingpermit@suisun.com for questions on other days. A construction and demolition waste management plan is needed for projects subject to the 50% diversion rule, and the permit will not be finaled without the diversion records.
Inspections in Suisun City
Every permit needs at least one inspection during or at the end of the work, and scheduling is the permit holder’s job: call 707-421-7319 or request it in the online portal. The inspection card must be on site. Work may not go past any inspection point without approval, and nothing may be covered until it has been inspected, including reinforcing steel, framing, wiring and plumbing.
- New buildings, additions and conversions need, at minimum, foundation, underfloor, underfloor insulation, shear nailing, frame, insulation, sheetrock nailing and final inspections.
- In slab foundations, plumbing and electrical must be in place and tested at the foundation inspection.
- The frame inspection comes after roof, framing, fire blocking, windows, doors, siding or lath and rough trades are complete, before insulation.
- The final inspection is made when the work is complete and ready for occupancy.
California building code in Suisun City
Suisun City enforces the state codes together with its own building, fire and seismic hazard ordinances. FEMA’s Community Status Book lists Suisun City (community 060372) as participating in the National Flood Insurance Program, with a current flood map dated August 3, 2016.
California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
Suisun City building permit FAQs
Who issues building permits in Suisun City?
The city’s Building Division at City Hall, 701 Civic Center Boulevard (707-421-7317), for property inside the city limits.
When is the permit counter open?
Monday and Wednesday, 9 a.m. to noon and 1 to 5 p.m.; Tuesday and Thursday by appointment; closed Friday through Sunday.
Want this handled start to finish?
Get a free quote →How much is a re-roof permit?
The FY 2023–24 schedule lists $262 for a residential re-roof and $403 for multifamily or commercial roofs up to 500 square feet.
How do I book an inspection?
Call 707-421-7319 or request it in the online portal, and keep the inspection card on site.
Do I need professional drawings for a small addition?
The city does not require a professional draftsman, but the electronic plans must include the plot, foundation, framing and floor plans, elevations and Title 24 forms.
Do contractors need a city business license?
Yes. All businesses and contractors working in Suisun City need a city business license under Title 5 of the City Code.
Can a homeowner pull the permit?
Yes, by signing the owner-builder declaration on the city’s form, which applies when the owner or wage-paid employees do the work and the building is not intended or offered for sale.
What does a kitchen remodel permit cost?
$769 for a kitchen up to 300 square feet under the FY 2023–24 schedule, plus trade fees where wiring, plumbing or mechanical work is added.
Suisun City permit search and official resources
Permit holders follow their applications in the online portal. The Building Department’s permit history page posts monthly lists of issued permits for 2022; for other records, contact the Building Division.
Inspections are where schedules slip.
Get a free quote →- Suisun City Building Department
- Online permit application portal
- Get a building permit
- Requirements to obtain a building permit (PDF)
- General application guide for the portal (PDF)
- Smoke and carbon monoxide self-certification (PDF)
- Licensed contractor declaration (PDF)
- City fee schedules
- Master Fee Schedule FY 2023–24, Resolution 2023-90 (PDF)
- Business licenses
- Planning Division
- Unreinforced masonry building information
- Building permit history
- California Building Standards Code (Title 24)
- FEMA Community Status Book, California
Simplify Suisun City permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Suisun City sooner?
Let Alliance prepare, file, and track your Suisun City permits while your crew stays on the job.
More California permitting guides
Solano County
Read guide →Vacaville
Read guide →Vallejo
Read guide →Sunnyvale Building Permit Guide
Read guide →Susanville Building Permit Guide
Read guide →Sutter County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Suisun City permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.