In South Pasadena, building permits come from the city’s Building Division in the Community Development Department at City Hall, 1414 Mission Street ((626) 403-7224, permittech@southpasadenaca.gov). Applications, invoices and payments run through the South Pasadena OpenGov permit portal, and permits are issued Monday to Thursday, 7:30 a.m. to 6:00 p.m. The Building Division posts the Los Angeles County Public Works building fee schedule effective July 1, 2026 as its plan check and permit fees, starting with a $41.35 issuance fee.
What requires a building permit in South Pasadena?
The Building Division reviews plans and issues permits for building, altering, demolishing and moving buildings and structures, and inspects the work done under them. The Building Division page gives no list of exempt work; the questions that most often decide a South Pasadena project are whether Planning or the Cultural Heritage Commission must approve it first.
Building Division permits
- New buildings, additions and alterations
- Demolition and moving of buildings
- Electrical, plumbing and mechanical work, including EV chargers and service equipment (city checklist)
- Exterior work on listed historic properties, once the Cultural Heritage Commission has approved it
- Construction and demolition projects that must file the city’s waste management form
Design or historic review first
- Any alteration, demolition, relocation or new construction affecting a property on the Inventory of Historic Properties, a landmark or a historic district
- Residential additions over 500 square feet or 25% of the house, or visible from the street
- New single-family homes and multi-family projects (Planning Commission)
- Exterior changes that change a building’s architectural style
- Work that could affect protected trees on private property
What South Pasadena decides and what the state holds
Locally, South Pasadena sets its review rules for design and historic properties (its review authority chart was rewritten after Ordinances 2394 and 2395 changed the design review process), its ADU rules in Zoning Code section 36.350.200, its construction hours, a separate set of construction regulations for the Southwest Monterey Hills, and its tree protection rules. Fire and life safety plan check is done by the city’s own Fire Prevention Bureau. The Building Division also points out that some work, such as electrical work in a multi-family building, can only be permitted to a licensed contractor.
South Pasadena building department: who handles permitting
The Building Division of the Community Development Department issues building permits, reviews construction documents and inspects permitted work for property inside the city. The department, led by Community Development Director Erika Ramirez, also runs Planning, Housing and code enforcement and staffs the Planning Commission, Cultural Heritage Commission, Public Art Commission and Design Review Board. The South Pasadena Fire Department’s Fire Prevention Bureau handles fire and life safety plan check, fire permits and fire inspections, and Public Works handles trees and work in the street.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Building Division, Community Development, City Hall, 1414 Mission Street, South Pasadena, CA 91030 |
| Phone / email | Building Official and permit technician (626) 403-7224; inspector (626) 403-7226; permittech@southpasadenaca.gov |
| Permit issuance | Monday to Thursday, 7:30 a.m. to 6:00 p.m. (the department’s public counter is listed Monday to Friday, 8:00 a.m. to 4:00 p.m.; appointments are highly recommended) |
| Plan checker | In person on Mondays and virtually on Wednesdays from 1:30 p.m., by appointment (the pages give 4:30 and 5:00 p.m. as the end time) |
| Planning | (626) 403-7220; askplanning@southpasadenaca.gov |
| Fire Prevention | Fire permits (626) 403-7300; inspections (626) 403-7304 |
| Public Works (trees) | 1414 Mission Street, Room 201, (626) 403-7240 |
South Pasadena permit types
Permits and plan checks are applied for in the OpenGov portal, which also issues invoices; the city warns that it never asks for payment by email or wire transfer, so a payment request outside the portal should be checked with Community Development at (626) 403-7200. Each applicant signs either the city’s Contractor’s Declaration or its Owner-Builder Declaration, which include workers’ compensation and authorization-of-entry statements.
Residential permits
- Additions. Under the 2025 review chart, a residential addition of no more than 500 square feet or 25% of the house (whichever is less) that is not visible from the street or above the first floor is approved by the Community Development Director. Larger additions, any addition visible from the street and style-changing exterior work go to the Planning Commission Chair, and new single-family homes to the Planning Commission.
- Historic properties. For a property on the Inventory of Historic Properties, the Cultural Heritage Commission or its Chair reviews the work. Re-roofing in a material comparable to the existing or original, and windows or doors replaced in the same material, form, color and location, are treated as work that does not change exterior features.
- ADUs follow state law as set out in Zoning Code section 36.350.200; a two-story ADU in front of the main house goes to the Planning Commission Chair.
- EV chargers use the city’s Electric Vehicle Charger and Service Equipment Checklist.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Commercial and industrial exterior changes and additions up to 500 square feet that keep the building’s style are approved by the Director; 500 to 3,000 square feet by the Planning Commission Chair; and over 3,000 square feet by the Planning Commission. Fire and life safety plans for new construction go to the Fire Prevention Bureau as PDFs through the plan submittal portal after the permit counter has opened the application and taken the plan review fee. Businesses also get annual fire inspections.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Planning. A 30-minute appointment with a planner can be booked by email, and Planning confirms the zoning before a business license is issued. Conditional use permits, variances and major hillside development permits go to the Planning Commission.
- Trees. Public Works asks owners planning a new home, addition, pool or other work near trees to talk to it early, because tree permits, Natural Resources and Environmental Commission review or CEQA review may follow.
- Southwest Monterey Hills. Projects there follow the city’s separate construction regulations handbook.
- Waste. Construction and demolition projects file the C&D Waste Management Form.
South Pasadena permit fees
The fee document linked from the Building Division page is the Los Angeles County Public Works building code fee schedule (Title 26), effective July 1, 2026, for unincorporated county territory. Its valuation table gives the plan check and permit fee for each $1,000 of valuation, with separate columns depending on whether energy and disabled-access checks apply and whether the building is a residence.
| Item | Fee |
|---|---|
| Permit issuance | $41.35, added to all building permit fees |
| $20,000 residential job, energy check only | Plan check $540.62; permit $638.63 |
| $20,000 residential job, no energy or access check | Plan check $491.48; permit $580.81 |
| New house and attached garage (combined permit) | 1.6 times the building permit fee |
| Plan maintenance | 2% of the building permit fee, $14.82 minimum, $631.04 maximum |
| Plan review beyond the second check | $164.02 per hour |
| Preliminary plan review | $328.04 for two staff hours (no fee for 15 minutes or less) |
| Demolition inspection | $244.88 |
| Pool barrier inspection | $137.95 |
| Change of occupancy inspection, Group R or U | $327.58 |
| Certificate of occupancy / temporary | $151.50 / $227.54 |
| Work without a permit | Equal to the permit fee, at least $504.47 ($252.23 for an owner-builder’s one- or two-family home) |
Rather talk it over?
Call 1-855-478-4290 →Worked example from the posted table: a $20,000 residential alteration that needs an energy check pays $540.62 in plan check and $638.63 in permit fees, plus the $41.35 issuance fee, for $1,220.60; the 2% plan maintenance fee comes to less than its minimum, so $14.82 is added, giving $1,235.42 before electrical, plumbing or mechanical permits and Planning fees. Electrical plan check, where required, is 70% of the electrical permit fee. Planning, fire and business license fees are set separately by the city; the city’s 2025 fee notes mention a technology fee of 10% of the base fee on Planning applications and a $336 notice publication fee where notice is required.
Trade permits and who may pull them in South Pasadena
Electrical, plumbing and mechanical permits are issued by the Building Division through the same portal, priced under the trade sections of the posted schedule. The Building Division notes that some trade work, such as electrical work in a multi-family residence, can only be permitted to a licensed contractor who obtains the electrical permit.
- Owner-builders. The city says homeowners may get their own permits as owner-builders but should know the legal obligations, and links the state’s owner-builder risk guidance; owners sign the Owner-Builder Declaration.
- Contractors sign the Licensed Contractor’s Declaration with their license type, number and expiry, plus the workers’ compensation declaration.
- Business license. Everyone doing business in South Pasadena needs a city business license, including contractors, consultants, architects and designers based outside the city. Apply online or by phone at (626) 360-1493 after Planning confirms the use is allowed; most licenses run one year.
How to apply for a South Pasadena building permit
Look up the address on the Inventory of Historic Properties and read the city’s review authority chart to see who approves the design.
Book a planner by email and file any design, hillside or historic application before building plans.
Do this early if the work is near a tree, including a neighbor’s.
Submit the permit or plan check application with plans and the signed contractor or owner-builder declaration.
The permit counter opens the application and invoices plan review; fire plans then go to the Fire Prevention Bureau as PDFs.
Answer plan check comments, pay the invoiced permit fees in the portal and have the issued permit on site.
Rather not deal with the building department?
Get a free quote →Review, corrections and what causes delay
The city does not publish a plan check turnaround. Plan review fees cover the first and second check; further checks needed because of changes, errors or omissions are charged at $164.02 an hour. Questions on corrections can be taken to the plan checker by appointment on Monday in person or Wednesday by video; appointments are not meant for detailed plan reviews and may be limited to one 30-minute slot per person per day. Design and historic review, tree review and, on some projects, CEQA review all come before plan check.
Inspections in South Pasadena
Building inspections are conducted Monday to Thursday between 9:00 a.m. and 4:00 p.m. and on Fridays between 9:00 a.m. and noon, and are requested through the inspection form linked from the Building Division page; the inspector’s line is (626) 403-7226. Fire and life safety inspections are made by the Fire Prevention Bureau ((626) 403-7304).
Work may only take place during the city’s construction hours: 8:00 a.m. to 7:00 p.m. on weekdays, 9:00 a.m. to 7:00 p.m. on Saturdays and 10:00 a.m. to 6:00 p.m. on Sundays and city holidays, with different rules in the Southwest Monterey Hills. At the end of the job the posted schedule charges $151.50 for a certificate of occupancy and $227.54 for a temporary one, and inspections outside normal hours are $147.02 an hour.
California building code in South Pasadena
South Pasadena enforces the state code through its own Building Official, with fire and life safety review by its own fire department. FEMA’s Community Status Book lists the city (community 065061) as participating in the National Flood Insurance Program, with no special flood hazard area mapped. The Fire Department runs an annual brush clearance program that requires owners to clear dry or dangerous vegetation away from buildings anywhere in the city.
California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
South Pasadena building permit FAQ
How do I apply for a building permit in South Pasadena?
Through the South Pasadena OpenGov permit portal, which handles applications, plan check, invoices and payments. Questions go to the permit technician at (626) 403-7224 or permittech@southpasadenaca.gov.
Want this handled start to finish?
Get a free quote →My house is historic. What changes?
If the address is on the Inventory of Historic Properties, the Cultural Heritage Commission or its Chair must approve any alteration, demolition, relocation or new construction affecting it before the building permit. Like-for-like re-roofs and window replacements are treated as minor.
How much does a building permit cost?
Using the county schedule the city posts, a $20,000 residential job with an energy check pays $540.62 plan check, $638.63 permit and a $41.35 issuance fee, plus a $14.82 plan maintenance fee.
Can a homeowner pull a permit?
Yes, as an owner-builder, with the signed Owner-Builder Declaration. Some work, such as electrical work in a multi-family building, must be done under a licensed contractor’s permit.
Do out-of-town contractors need a South Pasadena business license?
Yes. The city requires a business license from contractors, consultants, architects and designers based outside the city who work in South Pasadena.
When are inspections done?
Monday to Thursday from 9:00 a.m. to 4:00 p.m. and Friday from 9:00 a.m. to noon, requested through the city’s online inspection form.
What are construction hours?
Weekdays 8:00 a.m. to 7:00 p.m., Saturdays 9:00 a.m. to 7:00 p.m., and Sundays and city holidays 10:00 a.m. to 6:00 p.m., with separate rules in the Southwest Monterey Hills.
South Pasadena permit search and official resources
Applicants follow their permits and invoices in the OpenGov portal. Older permit records are handled by the Building Division at (626) 403-7224, and the Planning Division’s maps and historic inventory show a property’s zoning and historic status.
Inspections are where schedules slip.
Get a free quote →- Building Division
- South Pasadena OpenGov permit portal
- Building plan check and permit fees (effective July 1, 2026)
- Owner-Builder Declaration
- Contractor’s Declaration
- Community Development Department
- Planning Division
- Project review authority flowchart (2025)
- Inventory of Historic Properties
- Trees and construction projects
- Southwest Monterey Hills construction regulations
- C&D waste management form
- Fire Prevention Bureau
- Business license
- California Building Standards Code (Title 24)
Simplify South Pasadena permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in South Pasadena sooner?
Let Alliance prepare, file, and track your South Pasadena permits while your crew stays on the job.
More California permitting guides
Los Angeles County
Read guide →Temple City
Read guide →Walnut
Read guide →South San Francisco Building Permit Guide
Read guide →Stanislaus County Building Permit Guide
Read guide →Stanton Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about South Pasadena permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.