Skip to main content
Municipal GuideCaliforniaRedlands · San Bernardino County

Redlands, California Building Permit Guide

Everything contractors, builders and developers need for a City of Redlands building permit — the Building and Safety Division, Title 24 and inspections.

Authority: Building and SafetyCode: Redlands (Title 24)Phone: 909-798-7536
Inland Empire city
About 74,000City is its own AHJ
One Stop Permit Center
Title 24 with city amendmentsBuilding and Safety Division
Historic design guidelines
Victorian and craftsman stockPlanning Division holds them
Airport influence area
Disclosure requirementsOn new subdivisions

Redlands is an Inland Empire city of about 74,000 residents at the foot of the San Bernardino Mountains, with a large stock of preserved Victorian and craftsman housing and a growing logistics fringe. Its Building and Safety Division, at the One Stop Permit Center on Cajon Street, is the sole building authority inside the city.

This guide covers the Building and Safety Division and One Stop Permit Center, the filing routes, and the historic and airport overlays that shape Redlands projects.

This guide covers work inside the City of Redlands limits. Unincorporated San Bernardino County and neighbouring cities are separate authorities.

🏜️

Redlands is only partly online, and new structures are not. Certain over-the-counter permits can be started through the online public portal, but payment must still be made in person before issuance and three hard-copy plan sets must be brought in where plans are required. All building permit applications for new structures must be submitted in person at the One Stop Permit Center, while fire plans are accepted electronically only.

What requires a building permit in Redlands?

Permit required

  • New commercial, multi-family and residential construction, additions and change of occupancy
  • Structural alterations, load-bearing changes, foundations, decks and retaining walls
  • Electrical work — services, panels, circuits, solar and EV charging — under the California Electrical Code
  • Plumbing under the California Plumbing Code
  • Mechanical and HVAC change-outs, and work affecting the Title 24 energy envelope
  • Re-roofing above the exempt scope, pools, signs, and demolition

Often exempt

  • Minor repairs and maintenance replacing materials in kind
  • Small accessory structures below the local threshold, where zoning allows
  • Painting, flooring, cabinetry and other finish work
  • Like-for-like fixture or appliance swaps with no alteration to wiring or piping

Local amendments and thresholds differ from one jurisdiction to the next, so an exempt list from a neighbouring city is not reliable — a project waved through in one place needs a full permit set in the next. An exemption from a building permit is never an exemption from zoning, the statewide energy or green-building codes, or an electrical or plumbing permit. Confirm scope with Building and Safety before work starts.

Short on time to read all of this?

Get a free quote →

The statewide layers that apply everywhere

Several parts of Title 24 apply on top of the base building code and routinely catch projects owners assume are exempt: the California Energy Code (Part 6); CALGreen (Part 11), California’s mandatory statewide green-building code; and the accessibility provisions in Chapters 11A and 11B. Seismic design is built into the code statewide, and in fire-prone areas the California Wildland-Urban Interface Code (Title 24, Part 7, in force since 1 January 2026) and Cal Fire defensible-space requirements (Public Resources Code 4291) add a further layer. In the City of Redlands, the Building and Safety Division regulates construction and occupancy of all residential, commercial and industrial buildings under Title 24 with city amendments, alongside historic design guidelines and airport influence area requirements.

California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments

Who handles permitting in Redlands?

The Building and Safety Division regulates construction and occupancy of all residential, commercial and industrial buildings in order to ensure life, fire and health safety.

Redlands permitting contact
DetailInformation
AuthorityCity of Redlands Building and Safety Division
ServesThe City of Redlands limits
Phone909-798-7536
CounterOne Stop Permit Center, 35 Cajon Street, Suite 15A; Monday to Thursday 8:00am to 4:30pm, closed alternate Fridays
CodeTitle 24 with Redlands city amendments
FilingNew structures in person; some permits started online
LicensingState CSLB license; city business licence on the application
RecordsThe division holds city permit records

The One Stop Permit Center houses Building and Safety alongside Land Use Engineering and Planning, opening to the public on a schedule that closes alternate Fridays. Front counter staff review the minimum plan check submittal checklist before a plan check submittal is accepted, and permit applications are not processed until payment has been made. The application records the city business licence number and expiry for the contractor.

Confirm the parcel is inside the city first; unincorporated San Bernardino County and the neighbouring cities file with different authorities under their own amendments.

Not sure this scope needs a permit?

Get a free quote →

In 2025, building permits issued in Redlands authorized 203 new privately owned housing units, all of them single-family homes, according to the U.S. Census Bureau Building Permits Survey.

Permit types

Residential permits

Residential work inside the city is permitted and inspected by the division under Title 24 and city amendments. Additions, ADUs, reroofs, pools, solar and EV chargers need permits, with a published checklist for electric vehicle supply equipment. Retaining walls at or under the published height are exempt unless supporting a surcharge, and flag poles above the published height on a residential lot need permits.

Commercial permits

Commercial and industrial work goes through division plan check against the California Building Code, the Energy Code and CALGreen, with city amendments. Historic architectural design guidelines apply where relevant, dumpster enclosure design standards are published, and new residential subdivisions inside the airport influence area carry signage and marketing disclosure requirements.

Licenses, trade classifications and design professionals

Practically, three credential layers appear on California projects: a CSLB license in the correct classification for the contractor pulling the permit; the specialty C-classifications for the electrical, plumbing and mechanical trades; and, on commercial and larger residential work, drawings stamped by a California-licensed architect or engineer. Confirm what Building and Safety requires for the specific building before filing.

Contractors are licensed statewide by the Contractors State License Board (Classes A, B, B-2 and C) for work of $1,000 or more or any permitted work; a city may also require a business licence or tax registration. Contractor licensing in California

Redlands permit costs and fees

Budget the city building permit and plan-check fees, separate trade permits, the state Building Standards and seismic surcharges, grading permit fees, and any development impact fees. The fee schedule is adopted by council resolution; confirm the version in force on your filing date.

Rather talk it over?

Call 1-855-478-4290 →
How Redlands permit fees are structured
Fee componentHow it works
Building permitBased on project valuation or square footage; set by the local schedule
Plan checkA percentage of the permit fee or a flat charge, at submittal
Trade permitsSeparate electrical, plumbing and mechanical fees
State surchargesBuilding Standards and seismic (SMIP) fees collected with the permit
Impact and school feesDevelopment impact and school-district fees in growth areas
Re-inspections and revisionsAdditional fees for failed inspections, revisions and expired permits

California layers two uniform state surcharges — the Building Standards Administration fee and the Strong Motion Instrumentation seismic fee — on top of the local charges (Health and Safety Code 18931.6; Public Resources Code 2705). The building and plan-check fees themselves are local and change, and California law limits them to the reasonable cost of providing the service, so a figure from a neighbouring city is not reliable — ask Building and Safety for the schedule in force on your filing date.

🧮

Need a real number for a specific Redlands project? Send us the scope, address and valuation and we will identify the authority having jurisdiction, the code edition in force and the fee categories that will apply.

Trade permits and who may pull them

Permit required

  • Service installations, panel upgrades, new circuits, solar PV and EV chargers
  • New plumbing, repipes, water heater change-outs, fixtures, backflow and gas piping
  • HVAC installation and change-out, ductwork, venting and commercial kitchen exhaust
  • Sprinkler, standpipe and fire alarm work on commercial and multi-family structures

Typically exempt

  • Replacing a fixture, switch, receptacle or light with no alteration to wiring or piping
  • Clearing a stoppage without replacing or rearranging concealed piping
  • Filter, thermostat and routine component service
  • Like-for-like appliance repair that does not alter the connection

Rather not deal with the building department?

Get a free quote →

Each trade follows its part of Title 24 and is done by a contractor with the matching CSLB licence (C-10 electrical, C-36 plumbing, C-20 HVAC), a Class B contractor where allowed, or an owner-builder. Trade licences in California

How to apply for a Redlands building permit

1. Confirm the parcel is inside the city

Only work within the City of Redlands limits files with the division.

2. Use the right filing route for the scope

New structures are submitted in person; some permits start online.

3. Prepare three hard-copy plan sets

They are required at issuance where plans are required.

4. Check the historic design guidelines

They apply across much of the older housing stock.

5. Check the airport influence area position

New residential subdivisions carry disclosure requirements.

6. Pay before processing

Permit applications are not processed until payment has been made.

Review, corrections and what actually causes delay

In California, the first cause of delay is uncertainty over jurisdiction — filing with the county when a city should have it, or missing a local amendment on top of Title 24. After that come Title 24 energy and CALGreen documentation, a CSLB classification that does not match the scope, and, in fire or coastal areas, defensible-space or coastal-zone requirements that were not addressed up front. Build the plan-check time into the schedule and confirm the checklist with Building and Safety before filing.

A building permit carries a validity period and can expire if work does not start or stalls between inspections; confirm the expiry with Redlands on phased or delayed work. Permit validity in California

Inspections in Redlands

Where a permit is required, standard checkpoints include footing and foundation, framing, rough-in electrical, plumbing and mechanical, insulation and Title 24 energy, CALGreen measures, fire systems on commercial work, and final, with a certificate of occupancy before use. Inspections can be scheduled through the city website, and the division publishes who may pull a permit and what identification is required.

California inspections are made against the code editions in effect when the permit application was submitted (Health and Safety Code 18938.5), so the approved plans and any energy and green-building documentation need to be on site for the inspector to check against. Confirm the notice Building and Safety needs and schedule around its inspection windows.

Want this handled start to finish?

Get a free quote →

Do not cover work before the required inspection has been approved. Keep the issued permit, the approved plans, product listings, Title 24 energy documentation and your correction responses available on site.

Redlands permit search and official resources

Permit records in California sit with the local authority that issued them. Where the City of Redlands Building and Safety Division is the authority for the City of Redlands limits, it holds the building permit, the inspection history and the certificate of occupancy. If you are buying, refinancing or renovating, confirm that past work was permitted rather than assuming it was — and confirm the code edition that was in force.

🔍

Confirm the authority having jurisdiction and the local amendments first. California enforces one statewide code, Title 24, but each city and county adds its own amendments and fee schedule, so the requirements that apply vary by parcel. Confirm current requirements, fees and review turnaround for your filing date.

These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.

Frequently asked questions

Who issues building permits in the City of Redlands?

The Building and Safety Division, at the One Stop Permit Center on Cajon Street; unincorporated San Bernardino County and neighbouring cities are separate authorities.

Inspections are where schedules slip.

Get a free quote →

Can I file online?

Only partly. Some over-the-counter permits can be started through the online public portal, but payment must be made in person before issuance and three hard-copy plan sets are required where plans apply. New structures are submitted in person.

How are fire plans submitted?

Fire plans are accepted electronically only, through the fire department, separately from the building submittal.

Do I need a local contractor registration?

California licenses contractors statewide through the CSLB; a city may still require a business licence or tax registration. The application records the city business licence number and expiry.

Are there historic requirements?

Yes. The city publishes historic architectural design guidelines through the Planning Division, and they apply to work on much of the older housing stock.

What is the airport influence area?

An overlay under the municipal code carrying signage and marketing disclosure requirements for new residential subdivision development inside it.

Simplify Redlands permitting with Alliance Permitting

Redlands rewards knowing which parts of the process are online and which are not. The split routing here catches out contractors used to fully electronic cities.

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Trusted by leading builders, developers, and national contractors — 21+ years of filing in the jurisdictions we write about.

Contractors and builders choose Alliance for Redlands because the work is done by people who have stood at the counter:

  • We confirm the parcel is inside the city and route it to the division.
  • We match the filing route to the scope of work.
  • We prepare hard-copy plan sets in the required count.
  • We apply historic design guidelines where they bite.
  • We check airport influence area disclosure obligations.

Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Redlands sooner?

Let Alliance prepare, file, and track your Redlands permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Redlands permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.