Inside Port Hueneme, the Community Development Department’s Building and Safety Division, led by a certified Building Official, checks plans, issues permits and inspects construction from City Hall at 250 N. Ventura Road. All permit applications have gone through the city’s OpenGov portal since July 1, 2025. Under the master fee schedule effective November 2, 2026, plan check is 65% of the valuation-based building permit fee, and the city estimates up to 15 business days for a first review.
What requires a building permit in Port Hueneme?
Building and Safety handles plan check, permits and inspections for demolition, alteration and new construction of public and private buildings. Its fee schedule shows the range of permits it issues, from new buildings and additions priced by valuation to flat-fee permits for smaller jobs.
Building permits (valuation table)
- New homes, ADUs and commercial buildings
- Additions, alterations and tenant improvements
- Demolition of buildings
- Any work without a flat fee in the schedule
Flat-fee permits
- Re-roof of a single-family home ($145, two inspections)
- Service panels and sub-panels
- Water heaters and vents, sewer lines and water piping
- Garage doors, rooftop solar and EV chargers
The city does not post its own list of exempt work, so ask Building and Safety (805-986-6512) before skipping a permit. Work started without one is charged twice the permit fee. Grading or land clearing for development needs at least a Standard Erosion Control Plan, and a Detailed Erosion Control Plan when the Building Official finds slopes over 15%, a site next to a critical area such as a creek, more than one acre of disturbed soil, or other hazards.
What Port Hueneme decides and what the state holds
The city sets its own fees, zoning ordinance, Local Coastal Plan, landscape ordinance (updated December 18, 2023), business license tax and encroachment rules. It repealed its local ADU ordinance in 2024, so ADU and junior ADU applications are reviewed under state law alone. Fire inspection services come from the Ventura County Fire Protection District, and contractor licensing is a state matter.
Port Hueneme building department: who handles permitting
The Building and Safety Division issues building, electrical, plumbing and mechanical permits for work in the city and coordinates with architects, engineers, owners and the Contractors State License Board. Its Building Official also serves as the Rehabilitation Construction Specialist for the city’s Neighborhood Preservation Program and is the liaison to the Ventura County Fire Protection District, which provides fire inspections. Planning and Public Works review projects through the same portal. The city’s business license rule also covers vendors working on Naval Base Ventura County.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Building and Safety Division, City Hall, 250 N. Ventura Road, Port Hueneme, CA 93041 |
| Phone | 805-986-6512 (Community Development) |
| Counter | Walk-ins 8 a.m. to 1:30 p.m.; appointments 1:30 to 5 p.m.; closed every other Friday |
| Inspection line | 805-986-6515 |
| Community Development Director | Tricia Maier, 805-986-6520 |
| Public Works permits | Service Yard, 700B Hueneme Road (by appointment); pwpermits@cityofporthueneme.org; inspector 805-986-6507 |
| Business licenses | 805-986-6524; businesslicenses@cityofporthueneme.org |
| Portal | Port Hueneme OpenGov permit portal |
Port Hueneme permit types
Applications for planning, building and Public Works permits and for business licenses are filed, paid and tracked in OpenGov, and the Planning Division says in-person applications are no longer accepted. City staff help applicants who have trouble with the portal.
Residential permits
- ADUs and junior ADUs. Applications start in OpenGov with Planning, which checks feasibility before routing the plans to Building and Safety. Plans need a site plan with a project analysis table, floor plans and elevations, then utility, mechanical and Title 24 sheets and structural and energy reports. Outdoor mechanical equipment must be screened and stay under 50 decibels at the nearest property line. A junior ADU requires a recorded owner-occupancy deed restriction before the certificate of occupancy, and ADUs may be rented for periods of at least 30 days.
- Rooftop solar. Under the city’s AB 2188 streamlined process, licensed contractors can fax a residential solar application with plans, or use SolarAPP+ for standard systems; systems with main panel upgrades or battery storage are not eligible for SolarAPP+.
- Smaller jobs. Re-roofs, water heaters, service panels, sewer and water line work and garage doors have flat fees.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Commercial buildings and tenant improvements are priced from the valuation table, with plan check at 65% and outside consultant review billed at cost plus 15%. A commercial certificate of occupancy is $199 and a temporary one $376. Commercial solar is $1,000 for the first 50 kW.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Planning. The Planning and Zoning Division reviews zoning, design and conditions of approval, and charges $157 for planning plan check on a single-family home.
- Coastal zone. The city administers a Local Coastal Plan and keeps an interested parties list for coastal development projects and Local Coastal Program amendments.
- Public Works. Plans with a new water meter, a detached building over 750 square feet or an addition over 750 square feet go to Public Works, which may add fees; work in the street or a city easement, from driveways and sidewalk repair to utility trenches, needs a Public Works encroachment permit, with $1 million per occurrence and $2 million aggregate general liability cover, $1 million auto cover and, in the roadway, an approved traffic control plan.
- Oversize loads. Moving vehicles or loads larger than the Vehicle Code allows on city streets needs a single-trip or annual transportation permit, applied for online, and trucks must keep to the city’s designated truck routes.
- Clearances at issuance. ADU permits need Ventura County Fire Department Fire Prevention Bureau approval, proof of school fees paid to the Hueneme Elementary and Oxnard Union High school districts, and an Air Pollution Control District clearance.
Port Hueneme building permit fees
Fees come from the City of Port Hueneme Master Fee Schedule, effective November 2, 2026. The building permit fee is added to the $44 single permit issuance fee, plan check is 65% of the building permit fee, and the schedule applies a 7% technology fee and a 5% contractor administration fee to planning and building fees.
| Item | Fee |
|---|---|
| Single permit issuance | $44 |
| Valuation $10,001 to $25,000 | $240 plus $9.64 per $1,000 over $10,000 |
| Valuation $25,001 to $50,000 | $384 plus $9.59 per $1,000 over $25,000 |
| Valuation $50,001 to $100,000 | $624 plus $2.89 per $1,000 over $50,000 |
| Valuation $100,001 to $250,000 | $769 plus $3.55 per $1,000 over $100,000 |
| Plan check | 65% of the building permit fee |
| Fourth and later plan check reviews | $136 per hour |
| Re-roof, single-family home | $145, including two inspections |
| Service panel or sub-panel up to 400 amps | $72 |
| Water heater and/or vent | $72 |
| Residential solar up to 15 kW | $450, plus $15 per kW over |
| Reinspection | $72 |
| After-hours inspection | $217 minimum, two hours |
| Commercial certificate of occupancy / temporary | $199 / $376 |
| New address, single unit | $68 |
| Construction without a permit | Twice the permit fee |
| Renewing an expired permit | 75% of the original fee after the foundation inspection, 50% after framing |
Rather talk it over?
Call 1-855-478-4290 →Worked example: a $20,000 remodel falls in the $10,001 to $25,000 band, so the building permit fee is $240 plus 10 × $9.64, or $336.40. Plan check adds 65% ($218.66) and the issuance fee $44, for $599.06 before the 7% technology fee, the 5% contractor administration fee and any trade, school or state fees.
Refunds return 50% of the permit fee and 50% of the plan check fee, with restrictions, less a $90 processing fee. A report of building records costs $44.
Trade permits and who may pull them in Port Hueneme
The fee schedule prices common stand-alone trade jobs at flat fees, such as $72 for a panel or sub-panel up to 400 amps ($145 over 400), $72 for a water heater and $145 for a residential sewer, interior drain or water line. A $72 inspection clears an idle meter that the utility pulled from a vacant unit.
Every contractor working in the city needs an active Port Hueneme business license, and the ADU handout makes it a condition of the building permit. Licenses run on the fiscal year (July 1 to June 30) and must be renewed by July 31. General contractors with an A or B classification pay $100 when they apply between July and September, stepping down each quarter to $25, and C or D subcontractors pay $75 in the first quarter, each plus a $14 administrative fee and the $4 state fee.
Owner-builders file a Property Owners Package with the construction permit application and a smoke and carbon monoxide alarm self-certification. Work in the public right of way must be done by contractors holding a Class A, C-12 or C-34 license, with C-31 allowed for traffic control only.
Rather not deal with the building department?
Get a free quote →How to apply for a Port Hueneme building permit
Check that the property is inside city limits and note its zoning on the city zoning map; ADU applicants can ask Planning for an optional concept review.
Register on the city’s OpenGov portal; paper and in-person applications are no longer taken.
Upload the site plan, floor plans and elevations; once Planning finds the project feasible, OpenGov routes it to Building and Safety.
Upload the full construction set and reports, pay the plan check fee, and answer comments from Building, Planning and Public Works in the portal.
Get Fire Department, school district and air district sign-offs as required, and make sure every contractor has a city business license.
Pay the remaining fees in OpenGov within 180 days of plan approval.
Review, corrections and what causes delay
The city estimates up to 15 business days for the first review of a new building permit in OpenGov and up to 10 business days for each resubmittal. The city’s instructions say an application is not accepted until staff find every required item included, and the city only sends project updates through OpenGov, so applicants must watch the portal and their email. A fourth and later plan check round is billed at $136 an hour. The city’s ADU instructions add that a permit must be pulled within 180 days of plan approval, that work and inspections must start within 180 days of issuance, and that inspections must take place at least once every 180 days or the permit may be canceled or expire.
Port Hueneme building inspections
Inspections are scheduled online in OpenGov; if a problem comes up, call the building inspection line at 805-986-6515. The fee schedule lists building inspections at $72 an hour (half-hour minimum), reinspections at $72, and an inspection outside business hours has a $217 two-hour minimum.
The smoke and carbon monoxide self-certification can be turned in at inspection. A certificate of occupancy is issued through OpenGov once all reviewing agencies approve the work, outstanding fees are paid and any junior ADU deed restriction is recorded. When a utility needs a new address before the final, the city issues a temporary certificate of occupancy, which expires after 180 days. New ADUs receive their own address letter at the certificate of occupancy for separate utility meters.
Encroachment work is inspected by Public Works: call 805-986-6507 three working days before starting, and call Underground Service Alert at 811 three working days before digging.
Want this handled start to finish?
Get a free quote →California building code in Port Hueneme
Building and Safety enforces the state energy and accessibility rules along with the city’s adopted building, electrical, plumbing, mechanical, fire, housing and dangerous-buildings codes, which are in the Port Hueneme Municipal Code. FEMA’s Community Status Book lists the City of Port Hueneme (community 065051) as participating in the National Flood Insurance Program, with a flood map dated January 29, 2021 that is marked as showing no base flood elevations.
California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
Port Hueneme permit search and official resources
OpenGov shows the status of applications filed since the portal opened, along with comments and fees. For older permits, Building and Safety prepares a report of building records for $44, and copies of city documents cost $0.50 a page ($0.10 a page under a public records request).
- Port Hueneme Building & Safety
- OpenGov permit portal
- Community Development Department
- Planning & Zoning Division
- ADU building permit instructions (February 2026)
- Master Fee Schedule, effective November 2, 2026
- Encroachment and transportation permits
- Residential solar fax application
- Business license information
- Business license tax and fee schedule
- FEMA Community Status Book, California
Inspections are where schedules slip.
Get a free quote →Port Hueneme building permit FAQs
Can I apply for a permit at the counter?
No. Since July 1, 2025 all permit applications go through OpenGov; counter staff can help with the portal.
How much does plan check cost?
65% of the building permit fee; a $20,000 job comes to about $599 with permit, plan check and issuance, before the technology and administration fees.
How long does review take?
Up to 15 business days for a first review and up to 10 business days for resubmittals.
Does Port Hueneme have its own ADU rules?
No. The city repealed its ADU ordinance in 2024 and reviews ADUs under state law, using its February 2026 instruction handout.
Do contractors need a city business license?
Yes, every contractor working in the city; a general contractor pays $100 in the first quarter of the fiscal year plus $18 in fees.
How do I book an inspection?
Online in OpenGov; call 805-986-6515 if there is a problem.
Do I need a permit to build a driveway approach or work in the street?
Yes. Public Works issues encroachment permits for any work in the city right of way or a city easement; call the inspector at 805-986-6507 three working days before starting.
What does a re-roof permit cost?
$145 for a single-family home, including two inspections, plus the $44 issuance fee.
Simplify Port Hueneme permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Port Hueneme sooner?
Let Alliance prepare, file, and track your Port Hueneme permits while your crew stays on the job.
More California permitting guides
Ventura County
Read guide →Santa Paula
Read guide →Simi Valley
Read guide →Porterville Building Permit Guide
Read guide →Poway Building Permit Guide
Read guide →Rancho Cordova Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Port Hueneme permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.