To get a building permit in Plumas County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

The Plumas County Building Department at 555 Main Street in Quincy issues building permits for unincorporated Plumas County, with applications and inspection requests filed in Cloudpermit since October 26, 2026; Portola, the only city, runs its own building department.

Authority: Plumas County Building DepartmentFiling: Cloudpermit (since Oct. 26, 2026)Phone: 530-283-7011
Authority
County Building DepartmentUnincorporated areas only
Office
555 Main Street, QuincyMon–Fri 8:00–5:00
Inspections
530-283-6001 (24/7)By 3:00 p.m. the working day before
Permit life
24 monthsFrom the date issued

In unincorporated Plumas County, building permits are issued by the County’s Building Department at 555 Main Street, Quincy (530-283-7011), open Monday to Friday from 8:00 a.m. to 5:00 p.m. Since October 26, 2026, applications, status updates and inspection requests run through Cloudpermit, and a complete submittal takes an average of two to four weeks. Inside the City of Portola, the city’s own building department issues permits.

What requires a building permit in unincorporated Plumas County?

The Building Department’s permits page lists the kinds of work that call for a permit and asks anyone unsure to call the department first. Mountain conditions shape several local rules: heavy snow loads, freezing temperatures that affect fire sprinkler piping, and fire-safe access for homes outside local fire response areas.

County list: permit needed

  • Changes to a building’s footprint involving several trades
  • Furnaces and air conditioners, including HVAC change-outs
  • Electrical work and gas water heaters
  • Roofs, decks, sheds and fences
  • Pools and signs
  • Sewer repair or replacement
  • Sidewalks, curb cuts and driveway approaches
  • Demolition

Related county permits

  • Fire Safe Driveway permit for homes outside Local Response Areas
  • Encroachment permit for any work in a County road right-of-way
  • Septic and well permits from Environmental Health
  • Temporary structures such as tents and membrane structures, under a County handout

An HVAC change-out, meaning new space-conditioning equipment or more than 40 feet of new ducts, needs a County permit and duct leakage testing by a certified HERS rater. New dwellings need automatic fire sprinklers, and the County’s checklist reminds designers to protect sprinkler piping from freezing.

What Plumas County decides and what the state holds

The County sets its own snow load policy, fire-safe driveway rules under County Code Section 8-14.02(g), zoning and onsite wastewater rules (Chapter 11 of Title 6 of the County Code), and its fees by Board of Supervisors resolution. Under a Building Department interpretation effective November 18, 2026, the County has found that the ASCE 7-22 snow load hazard tool does not fit local conditions; designers may use that tool or ask, through an Alternative Materials and Methods of Construction Request, to use the County’s legacy snow load table. Contractor licensing remains with the state.

Plumas County building department: who handles permitting

The County Building Department provides plan review and inspection for unincorporated Plumas County, including Quincy, Chester and Greenville, while the incorporated City of Portola permits work inside its limits. To check which side of the line a parcel falls on, use the County’s Parcel Query Tool and Map Portal, which answer whether a parcel is in the City of Portola or the County and which fire and school districts serve it.

Short on time to read all of this?

Get a free quote →
Who issues building permits in Plumas County
AreaPermitting office
Unincorporated Plumas CountyPlumas County Building Department, 555 Main Street, Quincy; 530-283-7011
City of PortolaPortola Building Department, City Hall, 35 Third Avenue, Portola; 530-832-4216
County offices for building projects
OfficeContact
Building Department555 Main Street, Quincy, CA 95971; 530-283-7011; fax 530-283-6134; Monday to Friday, 8:00 a.m. to 5:00 p.m.
Inspection request line530-283-6001, 24 hours
Plans examiner (design criteria, snow loads)530-283-6401
Planning Department555 Main Street, Quincy; counter Monday to Friday, 8:00 a.m. to 5:00 p.m.; Planning Director Tracey Ferguson, 530-283-6214
Environmental Health (septic, wells)270 County Hospital Road, Quincy; 530-283-6355
Public Works (encroachment, transportation)530-283-6268

Plans and applications can also be left in the after-hours drop boxes outside the Quincy Building Department office and the Chester Civic Complex; the Chester box is emptied only when an inspector is in the area, so call to confirm a drop-off has arrived.

Permit types in Plumas County

Cloudpermit sorts applications by type and category; small structures such as sheds and detached garages are filed as accessory structures. The department publishes requirements for photovoltaic systems, temporary structures, manufactured homes, EV charging stations and special inspections.

Residential permits

New homes need a fire sprinkler submittal that follows the County’s checklist, a design that meets the County’s snow load criteria and, outside Local Response Areas, a Fire Safe Driveway permit. Owners rebuilding after a wildfire must request PG&E service through PG&E’s project portal, and the County needs the PG&E service application number before it issues the building permit. For ADUs, the County offers four pre-designed plans of 705, 830, 990 and 1,200 square feet at no cost, already plan checked by the Building Department; a parcel-specific site plan still goes to Planning, and the County notes the sets were drawn under the previous code cycle and are awaiting an update to the 2025 code.

Commercial permits

Commercial and other non-residential projects follow the same Cloudpermit path, with Planning review for use permits and site development, Environmental Health review of water and sewage disposal, and Public Works review of grading, drainage, traffic and floodplain issues. The department also publishes a special inspections page for projects that need them.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Zoning. Planning confirms the zone, setbacks and height limits; its handouts cover minimum plot plan requirements and its applications include administrative use permits and site development permits.
  • Septic and wells. Environmental Health permits and inspects onsite wastewater systems and wells under the County’s OWTS rules; the Building Department does not schedule those inspections.
  • Fire-safe access. Since November 17, 2023, Fire Safe Driveway applications go straight to the Engineering Department, which approves construction and then makes a final inspection.
  • Road work. Any work in a County-maintained right-of-way, from driveway approaches and fences to utility connections, needs a Public Works encroachment permit, with 24 hours’ notice before work starts.

Plumas County permit fees

County fees are set by Board of Supervisors resolutions that amend the Master Fee Schedule and take effect 60 days after adoption. The Building Department’s pages give no building permit fee table, so the department quotes building permit and plan review fees for a project by phone (530-283-7011). Building permits can be paid by card at the counter or online through GovPayNet, which adds a service fee based on the permit amount.

Public Works posts its current fees from Resolution 24-8957, approved October 8, 2024 and effective December 7, 2024:

Public Works permit fees (Resolution 24-8957)
PermitFee
Encroachment, residential driveway$140
Encroachment, commercial driveway$183
Encroachment, utility connection$130
Encroachment, tree removal in right-of-way$140
Major utility project$500 deposit, billed at $85.79 per hour
Transportation permit, single trip / blanket$32 / $16
Technical report review (grading, drainage, geotechnical)$500 deposit, billed at $115.48 per hour (the Planning sheet lists a $1,000 Public Works deposit at that rate plus a $500 Engineering deposit at $96.35 per hour)

Rather talk it over?

Call 1-855-478-4290 →

Planning fees. The Planning & Building Services fee schedule (Resolution 07-7417, revised January 1, 2026) covers planning applications, and its fees include Engineering, Environmental Health and Public Works review where those apply: an administrative use permit is $193 (printed as the Public Works charge), a sign permit $101, a site development permit $1,465, a special use permit $1,301, a variance $1,360, a lot line adjustment $1,150 plus $73 per lot and a flood plain determination $25, with planner consultations over 15 minutes at $101 per hour. Building permit fees are not part of that sheet.

Environmental Health fees for septic and well permits are paid to Environmental Health, online or at its office; online card payments carry a 3% transaction fee. The Planning Department warns that it never asks applicants to wire application fees: emails demanding wire payments are a known phishing scam.

Trade permits and who may pull them

The Building Department permits electrical, plumbing and mechanical work along with building work: its permit list names electrical work, gas water heaters, furnaces, air conditioners and sewer repairs, and inspectors check electrical, heating, plumbing and framing rough-ins. HVAC change-outs need both the permit and a HERS rater’s duct leakage test.

Septic systems and wells are not Building Department trades: Environmental Health permits and inspects them. In wildfire rebuild areas, PG&E needs an electronic site plan to design new or restored electric service.

Contractor licensing and owner-builder rules follow state law, and the person who meets the inspector should be the contractor or a representative who knows the work.

How to apply for a building permit in Plumas County

1. Confirm County jurisdiction

Use the Parcel Query Tool to confirm the parcel is outside Portola and to see its fire district and State Responsibility Area status.

2. Check zoning, septic and access

Ask Planning about setbacks and use permits, Environmental Health about septic and well approvals, and Engineering about a Fire Safe Driveway permit if the home is outside a Local Response Area.

3. Call before submitting

The department asks applicants to call 530-283-7011 before submitting plans; designers can confirm site design criteria and snow loads with the plans examiner at 530-283-6401.

4. Create a Cloudpermit account

Register with an email address, create a project, choose the County as the municipality, locate the property and pick the application type.

5. Upload a complete submittal

Include all required documents, engineering, signatures and zoning approvals, plus any snow load AMMR request, sprinkler plans or PG&E service number.

6. Answer corrections and pay

Respond to plan check comments, then pay the permit fees at the counter or through GovPayNet.

Rather not deal with the Plumas County building department?

Get a free quote →

Review, corrections and what causes delay

A complete submittal takes two to four weeks on average, depending on workload, and corrections or revisions add time; how quickly your designer responds matters. Common holdups are incomplete engineering or zoning approvals, a missing PG&E application number on a wildfire rebuild, a snow load design that uses the wrong criteria, and sprinkler plans that do not address freezing. Once issued, a permit is valid for 24 months.

Inspections in Plumas County

Request inspections in Cloudpermit or on the 24-hour inspection line, 530-283-6001, with the permit number, address, requested date and the name and phone number of the person who will meet the inspector. Requests must be in by 3:00 p.m. on the working day before; requests left on a weekend are scheduled for the following Tuesday, and those left on a County holiday for the second day after it. The inspection calendar is finalized at 8:30 a.m., and arrival times are estimates within an hour either way.

The contractor or a representative who knows the project must be on site with the stamped approved plans, the permit card, earlier correction notices and any special inspection or engineering reports; without the approved plans, no inspection is done. The County lists footings, sewer and water connections, electrical, heating, framing and plumbing rough-ins, sidewalk forms and the final. A re-roof needs an ice dam underlayment inspection, a nailing inspection if decking is replaced and a final. Work that is not ready can bring a reinspection fee, and inspectors may be unable to reach areas such as Bucks Lake and LaPorte once winter road closures begin, so plan those inspections before the roads close.

Building code in Plumas County

Plumas County’s local building policies include its snow load interpretation effective November 18, 2026, its fire-safe driveway requirement and its onsite wastewater code. Flood insurance: FEMA lists unincorporated Plumas County as a participating community in the National Flood Insurance Program, with a current flood map dated March 2, 2005.

California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments

Want this handled start to finish?

Get a free quote →

Frequently asked questions

Does Plumas County issue building permits in Portola?

No. The County Building Department covers unincorporated areas. Portola, the county’s only incorporated city, has its own building department at City Hall, 35 Third Avenue.

How do I apply for a building permit in Plumas County?

Since October 26, 2026, apply online through Cloudpermit, where you can track the application and request inspections. Call the department at 530-283-7011 before submitting plans.

How long does a permit take?

A complete submittal averages two to four weeks, depending on workload. Corrections and revisions add time.

Who handles septic and well permits?

The Environmental Health Department, 270 County Hospital Road in Quincy (530-283-6355), permits and inspects septic systems and wells.

Which snow load do I design for?

Under the County’s interpretation effective November 18, 2026, designers may use the ASCE 7-22 hazard tool or request approval to use the County’s legacy snow load table through an Alternative Materials and Methods request. The plans examiner (530-283-6401) confirms site criteria.

Do I need a permit to replace a furnace?

Yes. HVAC change-outs need a County permit and duct leakage testing by a certified HERS rater.

How long is a building permit valid?

24 months from the date it is issued.

Plumas County permit search and official resources

Applicants track permits and inspection results in their Cloudpermit account, and the department’s inspection calendar shows each day’s route.

Inspections are where schedules slip.

Get a free quote →

Simplify Plumas County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Plumas County sooner?

Let Alliance prepare, file, and track your Plumas County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Plumas County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.