Orinda, California Building Permit Guide

To get a building permit in Orinda, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Orinda contracts with Contra Costa County for building services: the City’s Planning Department approves most projects through its online submittal portal, then the County issues the building permit and does every inspection.

Authority: Contra Costa County DCD (City contract)City review: Orinda Planning, 22 Orinda WayPhone: (925) 655-2700
Building permits
Contra Costa CountyPermit Center, 30 Muir Road, Martinez
City review first
Orinda PlanningOnline portal; 925-253-4210
City plan check
$394 per permitPlus 10% and 3% surcharges (Res. 28-26)
Inspections
County only(925) 646-4108

The City of Orinda does not have its own building department. Building permits for Orinda addresses are reviewed, issued and inspected by the Contra Costa County Department of Conservation and Development under contract, but nearly every project must first be approved by the Orinda Planning Department, which takes submittals only through its online portal. Under the City’s FY 2026-27 fee schedule (Resolution 28-26), the Planning plan check is $394 per building permit before surcharges, and the City adds a building inspection surcharge equal to 50% of the County’s fee.

What requires a building permit in Orinda?

Orinda’s building permit page states the rule broadly: a permit is needed before anyone erects, constructs, enlarges, alters, repairs, moves, improves, removes, converts or demolishes a building or structure. The City links the County’s list of work that does not need a building permit, and the City’s own question is a second one: whether Planning must approve the job before the County will take it.

Needs Orinda Planning approval first

  • Additions, new homes and any new floor area
  • Exterior changes, new or larger windows and doors, and relocated pool equipment
  • Interior remodels that add a kitchen or a bedroom
  • Elevated decks and decks that change footprint or height
  • Retaining walls 4 feet or taller and grading
  • Re-roofs that trigger the waste management plan (most re-roofs of 1,000 square feet or more)

County permit only, no City review

  • Re-roofs under 10 squares and overlays
  • Flush-mounted roof solar of any size
  • Generators, battery storage, EV chargers and panel upgrades
  • Interior remodels with no new floor area, kitchen or exterior change
  • Skylights and windows or doors kept the same size or made smaller
  • Pool and spa repairs, temporary power poles, in-kind deck and siding repair, termite and foundation repair

The exempt list comes from the City’s “Projects Exempt from Planning Review” sheet. Those jobs still need the County building permit, and any work in the street or public right-of-way still needs an encroachment permit from Orinda Public Works.

What Orinda decides and what the County and state hold

The City controls zoning, design review, elevated deck permits, exceptions and variances, creek setbacks, tree removal, hillside grading review, the construction waste rules and its business registration program. The County applies the building code: Orinda’s page notes that from January 1, 2026 the County requires the 2025 California Building Code on every permit approval. Fire review is the Moraga-Orinda Fire District’s, and septic systems are approved by Contra Costa Environmental Health.

Short on time to read all of this?

Get a free quote →

Orinda building department: who handles permitting

The City is explicit that “only Contra Costa County Building Department issues building permits” and that Planning approval is not a building permit. Planning checks site plans, floor plans, elevations, sections, grading and landscape plans for zoning; it does not review Title 24 energy, electrical, mechanical or structural sheets, which go to the County. The Planning Department also does not route plans to other agencies, so the applicant carries the approved set to each one.

Orinda permit contacts
OfficeRoleContact
Contra Costa County DCD Permit CenterBuilding and grading permits, plan check, inspections, permit records30 Muir Road, Martinez, CA 94553; (925) 655-2700; inspection line (925) 646-4108
Orinda Planning DepartmentZoning and design approval of building plans, waste management plan, ADUs22 Orinda Way, 1st Floor, Orinda, CA 94563; 925-253-4210; counter by appointment Monday–Thursday 1–3 p.m.
Orinda Public Works and EngineeringEncroachment and transportation permits, creek setback checks253-4231 (925 area code)

Orinda permit types

Orinda’s Planning approval comes in two forms: a plan check stamp on a building permit application for projects that meet the code outright, and discretionary entitlements for projects that need design review, an elevated deck permit or an exception. Either way the stamped plans and the signed Orinda Permit Application Form go on to the County, and City holds can be placed on the County permit.

Residential permits

  • Additions and new homes. Residential design review is decided by the Zoning Administrator or the Planning Commission, with fees that rise with the square footage of the project; homes in the Wilder area carry their own design review fee. An optional Conceptual Development Review costs $170 for an addition and $520 for a new home outside Wilder.
  • Elevated decks. A separate Elevated Deck Permit is required, and the permit later carries a Planning final hold.
  • Accessory dwelling units. ADUs that meet the standards in Orinda Municipal Code section 17.3.4 are processed as a ministerial building permit with no discretionary review. Streamlined units (most detached ADUs under 800 square feet and conversions of existing space) need no added parking but cannot be used as short-term rentals.
  • Re-roofs. A re-roof that needs Planning review only requires the City’s building permit application form, with no plans.

Commercial permits

Commercial and other non-residential design review is charged at $765 plus $1.95 per square foot of exterior surface at the Zoning Administrator level, or $1,533 plus the same rate at the Planning Commission, and commercial Conceptual Development Review costs $1,394. A new business in the downtown zoning district may need a use permit first. Every business operating in the City needs an Orinda business registration certificate unless an exemption applies.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Planning approval through the Application Submittal Portal, or an in-person plan check by appointment (do not also file online).
  • Creek setbacks. Work inside a creek setback needs an Exception Permit. If your lot may be near a creek, a Creek Setback Request brings Public Works out to locate the top of bank before you design.
  • Hillside grading is reviewed by the City under section 17.7.7 of its code.
  • Trees. Removing trees covered by the City’s tree rules (Orinda Municipal Code Chapter 17.21), heritage trees included, needs a tree removal permit.
  • Encroachment. Driveways, dumpsters or debris boxes, street closures, overnight equipment parking, frontage landscaping, water or sewer lateral work and fences along the right-of-way all need a City encroachment permit. Meet the Public Works Inspector on site first so the inspection hours and fee can be set; newly paved streets carry a three- or five-year trenching moratorium.
  • Other agencies. Central San for sewer connections, Environmental Health for septic properties and the Moraga-Orinda Fire District where fire review applies. The County will not process the building permit until each agency has signed off.

Orinda permit costs and fees

Orinda’s City fees are set by the Adopted Master Fee Schedule for FY 2026-27, Resolution No. 28-26, effective July 1, 2026. Fees marked with a plus sign in the schedule, which include the plan check and most planning permits, carry a 10% General Plan Update surcharge and a 3% permit technology surcharge. The County’s own building permit and plan check fees are charged separately by DCD.

Rather talk it over?

Call 1-855-478-4290 →
City of Orinda fees on building projects (Resolution 28-26)
ItemFee
Project intake and plan check (per building permit)$394
Building inspection surcharge50% of the fee charged by Contra Costa County
State green building surcharge$4 per $100,000 of valuation, minimum $1
City final inspection site visit / re-inspection$55 / $150
Major / minor modification to a prior plan check$336 / $61 per resubmittal
ADU ministerial permit (non-state-exempt) / ADU pre-approval plan check$347 / $742
Residential design reviewZoning Administrator $765, or Planning Commission $1,533, each plus $1.95 per sq ft; new homes capped at $9,785
Elevated deck permit$694 alone; $479 with another application
Exception or variance with another application$975
Tree removal permit$197 first tree; $63 each additional
Standard encroachment permit$508
Business registration$61 initial; $41 renewal; plus $4 state fee

Worked example from the schedule: the $394 plan check plus the 10% surcharge ($39.40) and the 3% technology surcharge ($11.82) comes to $445.22 per building permit, before the County’s fees and the 50% building inspection surcharge on them. Payment to the City is made by card online or by check after Planning emails an invoice, and the stamped plans are released only once it is paid.

ADUs under 750 square feet pay no impact fees under the City’s ADU rules, and the City’s ADU page offers a fee calculator for project estimates.

Trade permits and who may pull them

Electrical, plumbing and mechanical permits for Orinda addresses are County permits. Stand-alone trade work with no new kitchen and nothing outside the existing structure, such as a water heater, HVAC change-out, meter relocation, rewiring or pool equipment replacement, skips City Planning review and goes straight to DCD. A permanent home back-up generator needs a County building permit but no Planning review, according to the City’s FAQ.

Contractors are licensed by the state CSLB, not by Orinda; the City’s business registration is a separate yearly certificate, renewed by January 1, that most businesses working in Orinda must hold. Businesses with less than $10,000 a year in gross receipts from Orinda work, and public agencies and their contractors, are among those exempt. Owners may build on their own property as owner-builders under state law and sign the licensed-or-exempt declaration on the County application. The City says it keeps no list of approved architects, contractors or design professionals.

Rather not deal with the building department?

Get a free quote →

How to apply for a building permit in Orinda

1. Check whether Planning must review it

Compare the job with the Projects Exempt from Planning Review sheet; if it is exempt, go straight to step 5. Planners offer 30-minute appointments by Zoom, phone or in person for questions before you file.

2. Submit online to Orinda Planning

Upload the Orinda building permit application, plan set checklist items and any neighbor consent form as PDFs on sheets at least 11 by 17 inches through the Application Submittal Portal; email submittals are refused.

3. Answer the planner’s comments

The assigned planner emails comments; incomplete applications go back to the applicant until every comment is resolved.

4. Pay the City invoice

Once the plans comply with the Orinda Municipal Code, the City emails an invoice; after payment the stamped plans are emailed to you.

5. Clear the other agencies

Take the plans to Central San, Environmental Health or the Moraga-Orinda Fire District where needed.

6. Apply to the County

File the building or grading permit in the County’s ePermits Center with the City-stamped plans and pay the County fees.

Review, corrections and what causes delay

Planning works through submittals in the order received and asks applicants to allow at least 2 weeks before calling for a status update. Two City holds are often placed on County permits: a waste management plan hold, and a Planning final hold on projects that went through design review, an elevated deck permit or an exception. If you cannot tell which holds apply, the City suggests checking the Planning-stamped plans and the signed permit application form, or calling Planning.

Inspections in Orinda

Every building inspection is done by the County. Schedule online in the ePermits Center as a project contact, or call the automated line at (925) 646-4108; the County posts inspection time frames after 8:45 a.m. on weekdays. Where Planning placed a final hold, City staff make a site visit before the County final; that visit is billed at $55, with $150 for each return visit.

Projects covered by the waste management plan must divert at least 65% of construction and demolition debris and report it in the free Green Halo system: residential additions or alterations affecting 1,000 square feet, valued at $50,000 or more, or adding conditioned area or volume, and any demolition that needs a permit. Planning places a “WMP hold” on the County permit when it is issued.

Want this handled start to finish?

Get a free quote →

California building code in Orinda

Orinda relies on the County to enforce the building code, and the City notes that the County applies the 2025 California Building Code to permit approvals from January 1, 2026. The Moraga-Orinda Fire District is designated a wildland-urban interface community, and the City says many parts of Orinda are high fire hazard severity zones. FEMA’s Community Status Book lists the City of Orinda (community 060722) as participating in the National Flood Insurance Program, with maps effective June 16, 2009.

California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments

Orinda permit search and official resources

The City of Orinda keeps no copies of building permits. Anyone can look up a property’s permit history in the County’s ePermits Center, while documents and payments are limited to the project’s registered contacts; copies of plans and older permit records are requested from the County on its Records Research Request Form.

Inspections are where schedules slip.

Get a free quote →

Orinda building permit FAQs

Does Orinda have its own building department?

No. The City contracts with Contra Costa County, which reviews, issues and inspects all building permits for Orinda addresses.

Can I email my plans to Orinda Planning?

No. Planning accepts submittals only through its online portal, or at an in-person plan check booked in advance.

What does the City charge on a building permit?

$394 per permit for intake and plan check plus 10% and 3% surcharges ($445.22), and a building inspection surcharge of 50% of the County’s fee.

Do I need Planning approval for rooftop solar?

Not for flush, roof-mounted solar on a home, but the County building permit is still required.

Why does Planning review my re-roof?

Because most re-roofs reach the waste management plan thresholds; partial re-roofs under 1,000 square feet and overlays that create no debris do not need Planning approval.

Can I build near a creek?

Possibly, within the setbacks; work inside a creek setback needs an Exception Permit, and Public Works can visit the site to locate the top of bank.

Where do I get copies of old building permits?

From Contra Costa County, through the ePermits Center lookup or its records request form; the City does not keep them.

Simplify Orinda permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Orinda sooner?

Let Alliance prepare, file, and track your Orinda permits while your crew stays on the job.