In Millbrae, building permits come from the city’s Building Division in Community Development, 621 Magnolia Avenue (650-259-2330). All applications and plans are filed in the city’s online permit portal, and plan check usually takes about 15 days once fees are paid. Fees follow the Service and Fee Schedule effective July 1, 2026: a valuation-based permit fee, plan review at 70% of it and several percentage add-ons, and new homes and larger ADUs also owe city impact fees and school fees.
What requires a building permit in Millbrae?
A building permit is required to build or alter a structure, to install, repair or modify electrical, plumbing or mechanical systems, or to demolish any construction, unless the work first needs a separate Planning application. The Building Division’s wording is broad: a permit is needed whenever a building or its systems are erected, enlarged, altered, repaired, moved, improved, removed, converted or demolished, with some exceptions. Property owners building on or remodeling existing structures need a permit from the city.
Permit needed
- New homes, ADUs and additions
- Kitchen and bathroom remodels
- Re-roofing
- Decks and retaining walls over 4 feet
- Pools, spas and pool demolition
- Water heaters, furnaces, air conditioners and panels
- Solar, batteries and EV chargers
- Sewer line work and demolition
No permit (city FAQ)
- Detached one-story sheds and playhouses up to 120 square feet
- Residential wood fences up to 7 feet
- Retaining walls up to 4 feet with no surcharge
- Replacing existing walks and driveways up to 30 inches high, not over a basement or part of an accessible route
- Painting, papering, tiling, carpeting, cabinets and countertops
- Above-ground prefabricated pools under 24 inches deep and up to 5,000 gallons
- Movable fixtures, racks and partitions up to 5 feet 9 inches
Minor electrical work such as replacing a breaker of the same rating in the same place, temporary decorative lighting and low-voltage wiring under 25 volts and 50 watts is also exempt. The city’s permits required and exempt work handout has the full list.
What Millbrae decides and what the state holds
Millbrae enforces the 2025 California building, residential, electrical, mechanical, plumbing, energy, fire, green building and Wildland-Urban Interface codes, which the city has amended with additional requirements. It sets its own fees, impact fees and planning rules, including its ADU ordinance (Ordinance 782). Its 2020 reach code (Ordinance 783, enforced from January 1, 2021) added energy, electrification, EV charging and commercial solar rules; the city has suspended enforcement of the all-electric requirements following the 2024 federal appeals court ruling on Berkeley’s gas ban. Contractors are licensed by the state.
Millbrae building department: who handles permitting
The Building Division issues building, plumbing, electrical and mechanical permits, routes plans to every department that must review them and inspects construction. Each department contacts you directly with its own comments and conditions, and permits from Public Works or the fire department may also be needed. ADU zoning questions go to Planning at 650-259-2341.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Building Division, Community Development, 621 Magnolia Avenue, Millbrae, CA 94030 |
| Phone | 650-259-2330 (permits and inspections) |
| Counter hours | Monday to Friday 9 a.m. to 4:30 p.m. |
| Inspection hours | Monday to Friday 9 a.m. to noon and 1 to 4:30 p.m. |
| Online | Online permit portal (eProcess360) |
| Planning (ADUs, zoning) | 650-259-2341 |
Millbrae permit types
Every permit is filed in the online portal; hard-copy applications are not accepted. After registering an account with your email, a new application has four pages: an information page on city requirements, a scope of work page where you choose the type of work, the application with the address and the people involved (owner, contractor, architect), and a submittals page for the documents staff need. Staff review the application, and once it is accepted you are invoiced for plan check; an incomplete application is returned for correction. Users can give architects or contractors access to their projects.
Residential permits
- Kitchen and bathroom remodels without structural changes, and rooftop solar, are reviewed in-house on a streamlined basis as time allows. The fee schedule prices a kitchen or bathroom remodel, including the trade work, at a flat $2,611.35, with $1,306.25 for each additional bathroom inspected at the same time.
- Re-roofs use the city’s roofing permit application ($614.03 for a house).
- Additions and new homes typically need plans, specifications, energy calculations and soils reports, and are priced by valuation. The city also posts guidance for decks, stairs and guards, retaining walls and pools.
- ADUs are submitted to the Building Division; ADUs may not be used as short-term rentals or as an extension of the main home. The city runs a pre-approved ADU review program for designers who want plans posted for reuse.
- Voluntary seismic retrofits using a prescriptive plan are a flat $614.03.
- Owner-builders complete the property owner-builder disclosure form, and the city posts the state’s caution to owner-builders.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
Commercial, industrial and multi-family projects use their own valuation table, with plan review at 70% and a 13% planning support fee. A certificate of occupancy for a new business with no construction costs $695.67, as does a temporary building permit for a tenant improvement.
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Planning approvals. Work that needs a Planning application gets it first. The fee schedule lists design review for new single-family homes and for additions reviewed by staff or the Planning Commission.
- Trees. A separate tree permit is not usually needed when landscaping plans are part of the building application.
- Stormwater. The forms page has stormwater checklists for small and large projects and an impervious surface worksheet.
- Flood zones. The forms page carries the FEMA elevation certificate and a substantial improvement worksheet for buildings in flood hazard areas.
- School districts. New buildings and additions over 500 square feet, and ADUs over 500 square feet of new floor area, pay developer fees to both the San Mateo Union High School District (650-558-2204) and the Millbrae Elementary School District (650-697-5693); you bring receipts from both before the permit is issued.
Millbrae permit costs and fees
The Service and Fee Schedule effective July 1, 2026 has two valuation tables: J-1 for one- and two-family homes, ADUs and accessory buildings, and J-2 for commercial, industrial and multi-family work. Plan review is 70% of the building permit fee, and the fees in effect when you pay are the ones that apply.
| Item | Fee |
|---|---|
| Valuation $1–$2,000 | $531.33 |
| Valuation $2,001–$10,000 | $531.33 plus $115.21 per $1,000 |
| Valuation $10,001–$25,000 | $1,452.99 plus $35.43 per $1,000 |
| Valuation $25,001–$50,000 | $1,984.32 plus $36.86 per $1,000 |
| Valuation $50,001–$100,000 | $2,906.00 plus $24.73 per $1,000 |
| Valuation $100,000–$500,000 | $4,142.55 plus $5.17 per $1,000 |
| Valuation $500,001–$1,000,000 | $6,213.83 plus $9.45 per $1,000 |
| Plan review | 70% of building permit fee |
| Planning support (single-family) | 10% of the J-1 fee |
| Technology and documentation fee | 7% of permit fee |
| General Plan maintenance (not solar) | 0.39% of valuation |
| Electrical / plumbing / mechanical with new work | $0.20 / $0.23 / $0.20 per sq ft |
| Re-inspection, extra plan review (after 3 resubmittals) | $291.55 per hour |
| Inspections outside business hours | $467.36, two-hour minimum |
Rather talk it over?
Call 1-855-478-4290 →Worked example: a house addition valued at $200,000 falls in the $100,000–$500,000 band, so the permit fee is $4,142.55 plus 100 × $5.17, or $4,659.55. Plan review adds 70% ($3,261.69), planning support 10% ($465.96), the technology fee 7% ($326.17) and the General Plan fee 0.39% of valuation ($780), for $9,493.37 before trade fees, state fees and any impact or school fees.
| Item | Fee |
|---|---|
| Kitchen or bathroom remodel, trade work included | $2,611.35 |
| Each additional bathroom inspected at the same time | $1,306.25 |
| Re-roof / spa or hot tub | $614.03 / $614.03 |
| Swimming pool | $1,843.23 |
| Stand-alone trade permit issuance | $141.43 |
| Water heater / furnace / EV charger | $154.08 each |
| Main panel up to 200 amps | $229.97 |
| Air conditioner, house or ADU | $614.03 |
| Residential solar up to 15 kW (plan review included) | $500, plus $15 per kW above |
| Battery energy storage | $141.01 |
Impact and planning fees
Citywide development impact fees for 2026 total $80,664.80 per new single-family home and $59,017.79 per multi-family unit, indexed each January (and July in the Millbrae Station Area Specific Plan area). ADUs under 750 square feet are exempt; larger ADUs pay a share in proportion to the main house, due before final inspection or occupancy, with a recorded lien agreement if paid at that point. The city’s ADU page still quotes the older $77,215.61 figure from January 2024. Planning fees include $8,643.54 for design review of a new single-family home or a Planning Commission addition, $5,761.98 for a staff-reviewed addition, $1,728.25 for a single-family variance and $287.47 for a fence exception.
Trade permits and who may pull them
Electrical, plumbing and mechanical permits are issued by the Building Division. Trade work that is part of a new building, addition or alteration is charged by floor area ($0.20 per square foot for electrical and mechanical, $0.23 for plumbing); stand-alone trade permits pay a $141.43 issuance fee plus item fees, and only one issuance fee is charged when several trade permits are issued together to one applicant.
Rather not deal with the building department?
Get a free quote →- Business license. All contractors working in Millbrae need a valid, current city business license, applied for or renewed through the city’s HdL portal ((650) 259-2321).
- Owner-builders sign the property owner-builder disclosure form with the application.
- Sewer laterals. Sewer line upgrades follow the city’s video inspection requirements; the fee schedule notes that sewer line service is moving to Public Works.
- Special inspections are arranged with the city’s special inspection and testing agreement.
How to apply for a Millbrae building permit
If the project needs design review, a variance or another Planning approval, get it first. ADU questions go to Planning at 650-259-2341.
Create an account with your email in the online permit portal and read the city’s quick guide for new submittals.
Fill in the scope of work and application pages and upload plans, energy calculations, soils reports and the waste management plan.
Once staff accept the application, they invoice the plan check fee and review begins.
Departments comment directly; upload resubmittals and revisions using the portal’s resubmittal and deferred or revision guides.
Bring receipts from both school districts where developer fees apply, pay the permit fees and download the permit.
Review, corrections and what causes delay
The Building Division asks applicants to allow 15 days for all plan check activity; streamlined jobs such as solar and non-structural kitchen and bath remodels are reviewed in-house as time allows. Applications with missing documents are returned, and plan review beyond three resubmittals is billed at $291.55 an hour. If the Community Development Director finds that a request will cost the city substantially more than the listed fee, it can be billed on time and materials; that decision can be appealed to the City Manager within three business days.
Inspections in Millbrae
Building inspections are carried out Monday to Friday from 9 a.m. to noon and 1 to 4:30 p.m. Schedule them by calling 650-259-2330 or emailing the Building Division permit technician.
- Waste management. A construction waste management plan is required before the permit is issued, and a completed one before final inspection.
- Construction site management. The city’s construction site management handout sets expectations for active job sites.
- Smoke and carbon monoxide alarms must meet the requirements in the city’s alarm handout.
- Re-inspections for work not corrected are billed at $291.55 an hour, and inspections outside business hours at $467.36 with a two-hour minimum.
- Impact fees on ADUs are due before final inspection or the certificate of occupancy.
Want this handled start to finish?
Get a free quote →Local details in Millbrae
- Flood zones. Millbrae participates in the National Flood Insurance Program; its current flood map is dated April 5, 2019.
- Station area. Multi-family and commercial impact fees are higher in parts of the Millbrae Station Area Specific Plan area than the citywide figures.
California building code in Millbrae
California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
Millbrae lists the 2025 editions it enforces, including the Wildland-Urban Interface Code, and notes that the city has amended them with additional requirements; complex design questions should go to an architect or engineer.
Millbrae building permit FAQs
Who issues building permits in Millbrae?
The city’s Building Division at 621 Magnolia Avenue (650-259-2330), open weekdays 9 a.m. to 4:30 p.m.
Can I submit a paper application?
No. Millbrae requires all permit applications to be filed in its online permit portal and does not accept hard copies.
How long does plan check take?
Allow about 15 days. Solar and kitchen or bath remodels without structural changes are reviewed in-house on a streamlined basis.
How much does a permit cost?
For a $200,000 addition, the July 1, 2026 schedule gives a $4,659.55 permit fee and $3,261.69 in plan review, about $9,493 with the percentage add-ons. A kitchen or bathroom remodel is a flat $2,611.35.
Do I need a permit for a fence?
Not for a residential wood fence up to 7 feet. Other fences and walls over the exempt limits need a permit.
Are there school fees?
Yes, for new buildings and additions over 500 square feet. You pay both the San Mateo Union High School District and the Millbrae Elementary School District and bring receipts before the permit is issued.
Do ADUs pay impact fees?
ADUs under 750 square feet do not. Larger ADUs pay a proportional share of the single-family fee ($80,664.80 for 2026) before final inspection.
Does a contractor need a Millbrae business license?
Yes. All contractors working in the city need a current Millbrae business license, available through the city’s HdL portal.
Millbrae permit search and official resources
Track your own applications and permits in the online portal. Copies of older permits and plans are requested through the city’s page on copies of Millbrae building permits and plans, using the plan duplication request form.
Inspections are where schedules slip.
Get a free quote →- Millbrae building permit and online portal
- Building Division
- Online permit portal
- Forms and other handouts
- Permits required and exempt work
- Developer fees for school facilities
- Accessory dwelling units
- Sustainable reach codes
- Finance Department (fee schedule)
- Service and Fee Schedule, effective July 1, 2026
- Development impact fees
- 2025 California Title 24 building standards
- FEMA Community Status Book, California
Simplify Millbrae permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Millbrae sooner?
Let Alliance prepare, file, and track your Millbrae permits while your crew stays on the job.
More California permitting guides
San Mateo County
Read guide →Redwood City
Read guide →San Bruno
Read guide →Milpitas Building Permit Guide
Read guide →Mission Viejo Building Permit Guide
Read guide →Modesto Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Millbrae permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.