Skip to main content
Municipal GuideCaliforniaLos Banos · Merced County

Los Banos, California Building Permit Guide

To get a building permit in Los Banos, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

The City of Los Banos Building Division, at 520 J Street under the Community and Economic Development Department, issues building and trade permits inside the city, with inspections carried out by the city’s contracted building services provider.

Authority: City of Los Banos Building DivisionImpact fees: 2026 adjusted schedulePhone: 209-827-7000 ext. 1300
Authority
City Building Division520 J Street
Hours
Mon–Fri 8–5losbanosbldg@losbanos.org
Solar
Symbium onlineEligible permits issue automatically
New house impact fees
$33,490.512026 adjusted, per unit

Inside the City of Los Banos, the Building Division reviews plans, issues building, electrical, plumbing and mechanical permits and inspects construction under the direction of Community and Economic Development Director Stacy Souza-Elms, with inspections provided through the city’s contracted building services provider. Staff work from 520 J Street, Monday to Friday, 8:00 a.m. to 5:00 p.m. (209-827-7000, ext. 1300). A new single-family home also pays the city’s 2026 adjusted development impact fees of $33,490.51 per unit.

What requires a building permit in Los Banos?

The Building Division says a permit may be required whenever a building or structure is constructed, enlarged, altered or remodeled, repaired, moved or demolished, and for many electrical, plumbing and mechanical installations; some minor projects are exempt. Its project table separates new installations from replacements.

Selected projects from the Los Banos permit table
ProjectNew installationReplacement
Deck over 30 inches highYesYes
Fence or screening over 6 feet; retaining wall over 3 feetYesYes
Pool, in-ground or above-ground over 5,000 gallonsYesYes
Roof or re-roof; patio cover or enclosure; skylightYesYes
Bedroom window, window or sliding glass doorYesYes
Air conditioning or heating unit (any type); wood or pellet stoveYesYes
Bathroom, kitchen or laundry exhaust fanYesOnly if the type changes or the rating increases
Water heater; sewer line; gas pipingYesYes
Dishwasher or water softenerYesOnly if no air gap exists
Garbage disposalYesOnly if plumbing changes (plumbing) or the rating increases (electrical)
Solar equipment (plumbing table)YesNo
Cooktop, oven or rangeYesOnly if switching gas and electric, or the rating increases
Service or sub-panel; spa or hot tub; new or extended wiringYesYes
Garage door openerOnly if adding an overhead outletNo
Switches and outletsYesOnly if the original wire is aluminum

Short on time to read all of this?

Get a free quote →

The table is a guide rather than a complete list, and the city asks owners to call before starting work so they avoid delays, extra costs or penalty fees. In commercial spaces, tenant improvements that need permits must be finaled before the city issues a business license, and exterior signs need Sign Review and sometimes a building permit.

What Los Banos decides and what the state holds

The city adopts the state building standards with its own building regulations in the municipal code, and sets its fees, impact fees, zoning, design standards and business license rules. Contractor licensing is a state matter; the city’s own role is the business license every contractor working in town needs.

Los Banos building department: who handles permitting

The Building Division enforces building codes inside the city through plan review, permitting and inspections. It sits in the Community and Economic Development Department, which also runs Planning, housing programs and business licensing; inspections are performed by the city’s contracted building services provider, which the city’s pages do not name. Unincorporated land around the city is permitted by Merced County’s Building and Safety Division.

Los Banos permit contacts
DetailInformation
Building Division520 J Street, Los Banos, CA 93635; 209-827-7000, ext. 1300; losbanosbldg@losbanos.org
Department headStacy Souza-Elms, Community and Economic Development Director
HoursMonday to Friday, 8:00 a.m. to 5:00 p.m.
Planning (zoning questions)209-827-2431; ZoningCheck portal on the Business Licenses page
City Hall main line209-827-7000
Solar and battery storageSymbium online permitting, linked from the Building page

The residential application packet still prints extension 2436 and a fax number for the Building Department; the Building page now gives extension 1300.

Los Banos permit types

The Building Division posts separate application packets for residential work, commercial work, accessory dwelling units and re-roofs, plus a revision application, an owner-builder notice, an AB 1236 checklist for electric vehicle charging equipment and a construction waste management form. Every building permit application must include the storm water pollution prevention acknowledgment.

Not sure this scope needs a permit?

Get a free quote →

Residential permits

  • Residential application: the form records the job address, parcel number, occupancy, square footage and valuation, and has a Planning block where staff confirm the zone and setbacks before the permit moves on. Water heater replacements are marked like-for-like or tankless, and tankless units need a gas or electric load calculation.
  • Solar and batteries: eligible residential solar and battery storage systems are permitted online through Symbium, which checks the design against state and local rules, verifies contractor and business license information and can issue qualifying permits automatically.
  • ADUs: ADUs use the city’s ADU residential building permit application, and the Building page points applicants to the state ADU handbook for the rules. The form’s Public Works checklist says an ADU needs no Public Works approval when all work stays on site, with no encroachment into the city right-of-way and no off-site utility connections.
  • EV chargers: residential and non-residential charger installations add the city’s AB 1236 checklist to the building permit application; once the checklist is deemed complete the permit is issued, unless the installation may have a specific adverse impact on public health or safety.
  • Re-roofs: a separate re-roof application packet is posted.

Commercial permits

Commercial projects use the commercial application packet, and the city provides the state-required disability access notice (Government Code 4469.5) with commercial permits. A business moving into a space with tenant improvements pays a one-time $26.71 tenant improvement business license fee, and new construction pays $115.12; fire or building reinspections for a business license cost $144.22 from the third inspection.

What comes before the building permit

  • Planning entitlements: site plan review, conditional use permits, variances, sign review and subdivisions go through Planning first. Planning applications must carry original signatures and the fee, and Planning does not accept electronic submittals.
  • Zoning check: the ZoningCheck portal shows where a use is allowed; confirm the result with a planner.
  • Stormwater: construction must use best management practices under the city’s small MS4 permit, and the acknowledgment records the project’s area of disturbance and threat to water quality.
  • Impact fees: new homes and non-residential buildings pay the city’s development impact fees, and the city asks applicants to contact a planner to confirm which apply.

Los Banos building permit fees

The application form lists the charges the Building Division collects: the building permit fee, plan check and a plan check deposit, Planning’s plan check, the state strong-motion (SMI) and SB 1473 green building fees, a general plan maintenance fee and plumbing, mechanical and electrical fees, with a note that additional fees may apply. The city’s pages publish no valuation table for the building permit fee itself, so ask the Building Division for an estimate.

Rather talk it over?

Call 1-855-478-4290 →
2026 adjusted development impact fees (per unit or per 1,000 square feet)
UseTotal
Single-family home$33,490.51 per unit
Multi-family$26,617.70 per unit
Age-restricted housing$18,126.13 per unit
Retail$20,768.92 per 1,000 sq ft
Office$11,109.63 per 1,000 sq ft
Institutional$6,711.19 per 1,000 sq ft
Industrial$4,541.79 per 1,000 sq ft

For a single-family home the total is made up of fire ($1,528.09), police ($2,859.42), parks and recreation ($8,536.91), water ($7,673.27), sewer ($5,887.65), storm drain ($3,593.09), traffic ($1,583.97), general government ($852.72) and a 3% administration charge ($975.40). The city also posts its AB 1600 development impact fee report dated November 18, 2025.

Selected planning and license fees (Resolution 6131, effective December 1, 2019; schedule revised December 6, 2023)
ItemFee
Site plan review$3,133.79 deposit, cost recovery contract
Conditional use permit$1,940.24 deposit
Variance$1,594.30 deposit
Administrative permit$720.98 deposit
Sign review / master sign plan$82 / $1,681.41
Temporary use permit, minor / major$230.42 / $311.14
Lot line adjustment or parcel merger$415.16
Minor subdivision or parcel map$1,024.15 deposit
Categorical exemption$197.75
Appeal$2,587.84
Commercial business license, first year (under 20,000 sq ft)$162.52 plus $1 state fee

Worked example: a 10,000-square-foot office building pays 10 times the office rate of $11,109.63, or $111,096.30, in development impact fees, on top of the building permit, plan check and state fees. Deposit-based planning items are billed against a cost recovery contract, so the final charge can exceed the deposit.

Rather not deal with the building department?

Get a free quote →

Trade permits and who may pull them in Los Banos

Electrical, plumbing and mechanical permits are issued by the Building Division, and the permit table shows which replacements need them. The application asks for the contractor’s state license number, class and expiry date and the contractor’s City of Los Banos business license, because anyone engaging in business within city limits must hold one. Symbium also checks contractor and business license information on solar permits.

Owners can build as owner-builders. The city’s owner-builder notice, required by state law, explains the three roles: owner as worker, owner as contractor hiring licensed subcontractors, and owner as employer, which applies when an unlicensed person is paid for work valued over $500 and brings employer obligations. The application’s owner-builder declaration offers three choices: all work by licensed contractors, all work by the owner or the owner’s wage employees, or a mix of the two.

How to apply for a Los Banos building permit

1. Check zoning

Use ZoningCheck or call a planner at 209-827-2431, and get any site plan review or use permit approved first.

2. Pick the right packet

Download the residential, commercial, ADU or re-roof application; solar contractors start in Symbium instead.

3. Complete the forms

Fill in the licensed-contractor or owner-builder declaration, workers’ compensation section and the storm water acknowledgment.

4. Submit to the Building Division

Contact the division at 520 J Street or losbanosbldg@losbanos.org for the submittal method and plan sets your project needs.

5. Planning sign-off and plan check

Planning confirms zoning and setbacks on the application, then plan check runs and corrections go back on a revision application.

6. Pay and build

Pay the permit, plan check, state and impact fees, then schedule inspections with the division.

Review, corrections and what causes delay

Common holdups are a missing storm water acknowledgment, which the city requires with every application, a missing Planning approval for setbacks or zoning, and impact fees that were not budgeted, which the city asks applicants to confirm with a planner. Revisions to submitted plans use the city’s revision application.

Los Banos building inspections

Building inspections are carried out by the city’s contracted building services provider. Arrange inspections through the Building Division at 209-827-7000, ext. 1300, or losbanosbldg@losbanos.org once the permit is issued. Depending on the project, plans may need review before work begins and inspections may be required at several stages of construction.

Want this handled start to finish?

Get a free quote →

For commercial tenants, the business license process adds a fire and building inspection of the space, and the fee schedule charges $144.22 for each inspection from the third on. Tenant improvements must pass final inspection before the business license issues.

California building code in Los Banos

The city has adopted the California Building Standards Code, covering building, residential, electrical, plumbing, mechanical, energy and green building standards, and its building regulations are in the Los Banos Municipal Code. FEMA’s Community Status Book lists the City of Los Banos (community 060747) as participating in the National Flood Insurance Program and marks it as having no special flood hazard area mapped.

California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments

Los Banos permit search and official resources

For the permit history of a property, contact the Building Division at 209-827-7000, ext. 1300, or losbanosbldg@losbanos.org with the address. Zoning for a site can be checked in the city’s ZoningCheck portal.

Inspections are where schedules slip.

Get a free quote →

Los Banos building permit FAQs

Who issues building permits in Los Banos?

The city’s Building Division at 520 J Street, part of Community and Economic Development, with inspections by the city’s contracted provider.

How much are impact fees on a new house?

$33,490.51 per single-family unit under the 2026 adjusted schedule, plus building permit, plan check and state fees.

Do I need a permit to replace a water heater?

Yes. The city’s table requires a permit for new and replacement water heaters; tankless units also need a load calculation.

Do I need a permit for a fence?

Fences and screening over 6 feet need a permit, as do retaining walls over 3 feet.

Can I get a solar permit online?

Yes. Eligible residential solar and battery systems go through Symbium, which can issue qualifying permits automatically.

Does a contractor need a city business license?

Yes. The application asks for the contractor’s City of Los Banos business license, and anyone doing business in the city needs one.

Can I file planning applications by email?

No. Planning applications need original signatures and the fee, and Planning does not accept electronic submittals.

Simplify Los Banos permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Los Banos sooner?

Let Alliance prepare, file, and track your Los Banos permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Los Banos permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.