In Gardena, building permits are issued by the Building & Safety Division of the Community Development Department, Room 101 at City Hall, 1700 West 162nd Street ((310) 217-9672). Applications and plans go in as PDF files by email, and the first plan check takes about 10 business days. Under the user fee schedule in effect since July 1, 2026, a $60,000 home project carries a $1,009 permit fee, the same again for plan check and a $72 issuance fee.
What requires a building permit in Gardena?
Gardena says most residential, commercial and industrial construction and demolition needs a building permit, whether new work, an addition, a remodel, a repair or an alteration. The city names signs and banners, fences, re-roofs, electrical and plumbing upgrades and window change-outs as examples, and it requires plans for all construction.
Permit required
- New buildings, additions, remodels, repairs, alterations and demolition
- Re-roofs and window change-outs
- Fences and block walls, with a shared fence or wall line agreement where neighbors share one
- Electrical and plumbing upgrades, and mechanical work
- Signs and banners, including temporary signs
- Landscape irrigation systems (planting itself needs no permit)
Common exceptions
- Decks and platforms under 30 inches high not attached to the house, open walkways and driveways
- Ceramic tile on floors and counters, and on walls up to 69 inches high outside showers and tubs
- Prefabricated pools no deeper than 24 inches or 5,000 gallons, without electrical or plumbing
- Cases, counters and partitions under 5 feet 9 inches
- Painting, papering and similar finish work
- One-story detached tool sheds and playhouses with a roof area of 120 square feet or less
Work in the sidewalk, alley or street needs a separate permit from the Public Works Engineering Division, and signs also go through Planning under Chapter 18.58 of the Gardena Municipal Code.
What Gardena decides and what the state holds
Gardena enforces the 2025 California codes through its own Building Official for applications filed from January 1, 2026, and it sets local design criteria: Seismic Design Category D unless a soils report shows otherwise, a basic wind speed of 100 mph at Exposure C for Category II buildings, and Climate Zone 8. The city also sets its own fees, its Property Information Report rule for sales, and programs for preapproved ADU plans and for legalizing ADUs built before 2020.
Gardena building department: who handles permitting
The Building & Safety Division reviews plans, issues permits, inspects construction and enforces the building codes for all of Gardena. Planning, Permits & Licenses and Building share the Community Development counter in Room 101. Plans are also routed to Planning, Public Works, the Los Angeles County Fire Department and the Los Angeles Unified School District, and some projects need Los Angeles County industrial waste or health approvals.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Building & Safety Division, Community Development Department, City Hall Room 101, 1700 West 162nd Street, Gardena, CA 90247 |
| Permit technicians | (310) 217-9672; building@cityofgardena.org |
| Community Development | (310) 217-9530 |
| Inspection line | (310) 217-9510 |
| City Hall hours | Monday to Thursday, 7:30 a.m. to 5:30 p.m.; Friday, 7:30 a.m. to 4:30 p.m. |
| Counter help | Deputy Building Official, Tuesday and Wednesday 8:00 a.m. to 5:00 p.m.; planners by appointment Monday to Thursday, 8:00 a.m. to noon |
The Building Services page says permits are issued Monday to Thursday between 8:00 a.m. and noon. Walk-ins are accepted, and appointments with Building & Safety can be booked by phone or email.
Gardena permit types
Gardena uses one permit application form for building, mechanical, electrical and plumbing work, but it does not offer a combination permit: a job that involves several trades gets a separate permit for each. Simple, properly documented jobs can be issued over the counter the same day, and typical over-the-counter permits such as fences and water heaters are usually turned around within three business days. Over-the-counter plan review covers fences, refuse enclosures, wall signs and similar small projects that need no other department’s review.
Residential permits
- Houses and additions follow the city’s residential plan check submittal guidelines: a completed application, state energy forms and structural documents, with owner-builder verification or the contractor’s pocket license and photo ID.
- Design professionals. A California-licensed engineer or architect designs new buildings and remodels, except single-story homes built to conventional light-frame rules. Soils reports, shoring for cuts over 5 feet, energy calculations and electrical services of 600 amps or more must come from a state-licensed professional.
- ADUs. The city preapproves detached ADU plans submitted by designers and builders, and an AB 2533 path lets owners permit ADUs or JADUs built before January 1, 2020, with a substandard-housing checklist completed by a licensed B contractor, architect or engineer.
- Solar. Contractors can use SolarAPP+ for single-family rooftop systems, then finish the permit in the city’s Trakit portal; other systems need a regular permit.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
Tenant improvements follow their own submittal guidelines and add a hazardous materials disclosure form. Disabled access plans are required for additions, alterations and repairs to existing commercial buildings. Businesses with food, medical, auto, personal care or car wash uses may need Los Angeles County health or industrial waste clearance before the city issues the permit.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Planning. Projects needing Planning Commission or other zoning approval wait for it before plan check; site plan review costs $6,419, or $3,548 for administrative approval, and a variance $4,286.
- Public Works. Plans are checked against the master plan of streets and the condition of the abutting right-of-way, and street, alley or sidewalk work needs an Engineering permit.
- Fire and schools. Los Angeles County Fire and LAUSD review most plans.
- Construction waste. Larger projects file a waste management and recycling plan and pay a diversion deposit, from $5,000 for work valued at $50,000 to $99,999 up to $15,000 at $500,000 and above.
Gardena permit fees
Gardena’s adopted user fee schedule now in force took effect July 1, 2026. The city says the schedule recovers 41% of costs for FY 2025-26, that development fees under it began on August 1, 2025, and that allowable fees rise each fiscal year with the Los Angeles-area Consumer Price Index. Building permit and plan check fees are based on project valuation, covering construction, finish work, roofing, plumbing and permanent equipment; the Building Official sets the final valuation.
| Item | Fee |
|---|---|
| Residential permit, valuation $2,001 to $25,000 | $94 plus $20 per $1,000 |
| Residential permit, $25,001 to $50,000 | $554 plus $14 per $1,000 |
| Residential permit, $50,001 to $100,000 | $904 plus $10.50 per $1,000 |
| Residential permit, $100,001 to $500,000 | $1,429 plus $7.50 per $1,000 |
| Commercial permit, $100,001 to $500,000 | $1,479 plus $8 per $1,000 |
| Building plan check | 100% of the building permit fee |
| Building permit issuance fee | $72 |
| Energy plan check | 15% of the permit fee (5 forms or fewer); 25% (more than 5) |
| Electrical, mechanical or plumbing issuance fee | $70 each |
| Health and Safety Code continuing education | 4% of the plan check fee |
| Job fee | $1 per $1,000 of the building contract |
| Construction without a permit | Same as the building permit fee |
| Expired permit renewal | Same as the original permit fee |
| Grading, 1 to 100 cubic yards | $799 |
| Residential solar PV, 15 kW or less | $448 plus the state SB 1473 fee |
Rather talk it over?
Call 1-855-478-4290 →Worked example: a residential project valued at $60,000 is $904 plus 10 × $10.50, or $1,009, for the permit; plan check adds another $1,009 and issuance $72, for $2,090 before energy plan check, the job fee and state fees. The permit application form itself prints $188 for a residential PV system of 15 kW or less, while the adopted schedule lists $448; the schedule notes that some solar permits are processed through SolarAPP+, so ask staff which figure applies.
Trade permits and who may pull them in Gardena
Electrical, mechanical and plumbing permits each carry a $70 issuance fee plus item fees. Examples from the schedule: a residential branch circuit is $24, a service up to 200 amps $43, a temporary power pole $92, a forced-air unit or heater up to 10,000 BTU $70, a vent fan $40, and each general plumbing appliance, which includes toilets, sinks, showers and water heaters, $44.
- Contractors need a valid state license and a current Gardena business license. Out-of-city contractors pay a $150 business tax for an A or B license or $75 for a C or D specialty, plus a $4 state disability access fee, prorated at 50% from July 1 to November 30.
- Agents pulling permits for a contractor bring a notarized letter and a copy of the contractor’s state license card; contractors themselves need only a driver’s license and the card.
- Owner-builders sign the city’s declaration that they are doing the work themselves or with wage-paid employees and that the building is not intended for sale, or that they will hire only licensed contractors holding a current business license. Gardena’s page adds that an owner who sells must have lived in the home for a year after completion, and may improve only two properties in any three years.
- Workers’ compensation proof or a certificate of consent to self-insure must be on file before issuance, unless the job is under $500, the license carries an exemption, or the owner-builder certifies no employees.
Rather not deal with the building department?
Get a free quote →How to apply for a Gardena building permit
Complete both sides of the form, listing every trade item with its quantity.
Follow the residential or tenant improvement submittal guidelines; all plans and documents must be PDFs.
Send it to building@cityofgardena.org with the address and permit type in the subject line; split files over 30 MB or share a cloud folder.
Permit technicians check completeness and email you if anything is missing.
You are notified through Microsoft Teams and pay by card; review starts after payment.
Plans return with comments from each division; once approved, a permit technician contacts you to pay permit fees.
Review, corrections and what causes delay
Building & Safety’s first plan check takes about 10 business days and resubmittals about 5, unless the project needs Planning Commission or other special approval. If no Teams notice arrives within 48 hours of submitting, call (310) 217-9672, but not earlier. Clearances from county agencies, special districts, the state or federal agencies are the applicant’s job, and plans are reviewed first come, first served.
Inspections in Gardena
Call the inspection request line at (310) 217-9510 and say your name, a call-back number, every permit number, each inspection type and the date and time you want. Next-day inspections may be possible but are not promised, and a request for a Monday inspection cannot be met if it is left after 2:00 p.m. on Thursday or between Friday and Sunday. The office does not return calls asking to confirm an inspection; it calls back only if it cannot meet your request. The daily inspection list is posted on the city’s inspections page.
Morning inspections run from 8:30 a.m. to noon and afternoon inspections from 1:00 to 4:30 p.m. Building inspectors check each phase of construction or grading against the approved plans.
The newest permit page says a permit is valid for 180 days, or for as long as work is active and progressing; the older Building Services page gives one year without substantial progress, so plan on keeping inspections moving. An expired permit is renewed at the original permit fee.
California building code in Gardena
Gardena’s code notice says permit applications submitted on or after January 1, 2026 must meet the 2025 codes, while work permitted or in plan review under the 2022 codes stays under them as long as the application or permit does not expire. FEMA’s Community Status Book lists Gardena (community 060119) as participating in the National Flood Insurance Program, with a current map dated September 26, 2008 that shows no base flood elevations.
Want this handled start to finish?
Get a free quote →California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
Gardena building permit FAQ
Can I apply for a Gardena permit by email?
Yes. Email the completed application and PDF plans to building@cityofgardena.org, up to 30 MB per message, or share them in a cloud folder. Fees are invoiced through Microsoft Teams.
How much is a building permit in Gardena?
It is based on valuation. A $60,000 residential job is $1,009 for the permit, $1,009 for plan check and $72 for issuance under the schedule effective July 1, 2026, plus energy plan check and state fees.
Do I need a permit for a fence or a shed?
Fences need a permit. A one-story detached shed or playhouse with a roof area of 120 square feet or less is exempt.
How long does plan check take?
About 10 business days for the first review and 5 for resubmittals; simple over-the-counter permits are usually done within three business days.
Do contractors need a Gardena business license?
Yes, including contractors based outside the city. The business tax is $150 for A and B licenses and $75 for C and D specialty licenses, plus $4.
How do I schedule an inspection?
Call (310) 217-9510 with your permit numbers, inspection types and preferred date; Monday requests must be in by 2:00 p.m. Thursday.
What is required when I sell a property in Gardena?
A Property Information Report, requested at least 30 days before the sale closes, unless the buyer files a waiver at least 20 days before escrow closes. Condominium units do not need one.
Gardena permit search and official resources
To check whether a permit was issued for an address, ask Community Development with the site address and unit number; the city also posts monthly lists of permits issued. A copy of building records costs $125. Older multi-family, commercial and industrial plans are kept on microfiche, and copies need written permission from the designer of record and the current owner. For a sale, the Property Information Report costs $150 for the interior inspection and $531 for the exterior, takes 15 business days and cannot be expedited.
Inspections are where schedules slip.
Get a free quote →- Gardena Building Services
- Community Development: Building & Safety
- Permit information and instructions
- Community Development forms
- Permit application BLD-100 (PDF)
- Electronic plan review procedures (PDF)
- Inspections and daily inspection list
- Fee schedule page
- User fee schedule effective July 1, 2026 (PDF)
- 2025 code update notice (PDF)
- Business license, incl. out-of-city contractors
- Unpermitted ADUs and JADUs (AB 2533)
- Residential solar (SolarAPP+)
- Property Information Report (truth in sales)
Simplify Gardena permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Gardena sooner?
Let Alliance prepare, file, and track your Gardena permits while your crew stays on the job.
More California permitting guides
Los Angeles County
Read guide →Glendora
Read guide →Lynwood
Read guide →Gilroy Building Permit Guide
Read guide →Glendale Building Permit Guide
Read guide →Goleta Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Gardena permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.