Inside Corcoran’s city limits, building permits come from the Building Division of the Community Development Department at City Hall, 832 Whitley Avenue (559-992-2151), where Kevin J. Tromborg is the Building Official. Applications go by email to Buildingplanningpermits@cityofcorcoran.ca.gov. The division sorts work by complexity: trade repairs and reroofs are handled over the counter within about 24 hours, patio covers, garages and additions on fast tracks of 3 to 10 working days, and new homes and commercial buildings in general processing of 4 to 6 weeks.
What requires a building permit in Corcoran?
The Building Division enforces the state’s Title 24 building and energy codes, the Uniform Housing Code and city ordinances, and asks anyone unsure whether a project needs a permit to contact the division. Its “Do I Need a Permit?” list separates exempt work from the permit tracks.
No building permit
- Cosmetic work such as carpeting, painting, trim and wall coverings
- One-story detached sheds up to 120 square feet with no electrical or plumbing
- Platforms, walkways and driveways no more than 30 inches above ground, 10 feet from the curb face and not over a basement or lower story
- Window awnings projecting no more than 54 inches
- Like-for-like window and door change-outs
- Wood, chain link and wrought iron fences up to 7 feet, if they meet the zoning code
Permit needed
- Electrical, plumbing and mechanical upgrades and repairs, water heaters and HVAC change-outs
- Reroofing, both overlays and tear-offs
- Block or brick fences, and any fence over 7 feet (with Planning approval)
- Patio covers, decks, carports, garages, storage buildings and fireplaces
- Garage conversions, additions, second stories and ADUs
- Pools, spas, foundation repairs, solar, new homes, apartments and all commercial work
- Drilling or destroying a water well
Work in the city’s sidewalks, driveway approaches, curbs and gutters also needs an encroachment permit, which the division handles over the counter. Demolition projects must also meet the San Joaquin Valley Air Pollution Control District’s asbestos requirements, and the city posts the district’s asbestos clearance form and a construction and demolition waste management form with its building forms.
What Corcoran decides and what the state holds
The city adopts the state building codes by ordinance (Ordinance 651 is posted on the Building Division page), sets its own building and planning fees, runs its zoning ordinance, design guidelines and improvement standards, and requires a business license of every business in the city. Code enforcement covers building maintenance under Title 24, the state Health and Safety Code and the Uniform Code for the Abatement of Dangerous Buildings, as well as zoning. Contractor licenses come from the state, and the division links to the Contractors State License Board to verify them.
Short on time to read all of this?
Get a free quote →Corcoran building department: who handles permitting
The Building Division, part of the Community Development Department, reviews plans, issues permits and inspects construction inside the city limits. Kevin J. Tromborg serves as Building Official and as Community Development Director and City Planner, so building and planning questions go to the same department at City Hall. Public Works is at 750 North Avenue, and the city’s fire page points to Kings County Fire Station 11. Land outside the city limits is unincorporated Kings County, served by the county Community Development Agency; see the Kings County building permit guide.
| Office | Details |
|---|---|
| Building Division | City Hall, 832 Whitley Avenue, Corcoran, CA 93212; 559-992-2151; fax 559-992-2348 |
| Permit applications | Buildingplanningpermits@cityofcorcoran.ca.gov |
| Inspection requests / permit status | 559-992-2151 ext. 2104 / ext. 2102 |
| Community Development and planning | 559-992-2151 ext. 2110; Monday to Friday, 8:00 a.m. to 5:00 p.m. |
| Public Works | 750 North Avenue; 7:00 a.m. to 4:00 p.m. weekdays (6:00 a.m. to 3:00 p.m. in summer) |
| Fire | Kings County Fire Department, Station 11 |
Corcoran permit types
The Building Division posts separate applications for different work: a building maintenance permit application, a reroof permit application, a 2025 photovoltaic permit application, a commercial building permit application, an engineering (encroachment) permit application for right-of-way work, a new single-family dwelling, addition and conversion application, and a well application. Applicants also find a sample plot plan, the city’s building requirements for zoning and setbacks, the smoke and carbon monoxide alarm form, the refund policy and the 2017 improvement standards updated in 2024.
| Track | Typical projects |
|---|---|
| Over the counter, up to 24 hours | Electrical, plumbing and mechanical upgrades or repairs; reroofs; portable spas; fences over 7 feet with Planning approval; encroachment permits; patios using the city’s pre-approved plans |
| Fast track 1, 3 to 5 working days | Solar (photovoltaic); fireplaces; block fences; garage conversions, with a site plan and construction plans |
| Fast track 2, 5 to 10 working days | Garages, storage buildings, decks, carports, patio covers; home additions; mobile-home and tiny-home ADUs; minor structural and foundation repair; pools and spas; commercial tenant improvements |
| General processing, 4 to 6 weeks | Major alterations and structural upgrades; second-story additions; projects needing planning review of setbacks, heights or land use; new conventional wood-frame homes, detached ADUs, apartment complexes and commercial buildings (commercial may take longer) |
Not sure this scope needs a permit?
Get a free quote →Residential permits
Most home projects fall in the faster tracks. Patio covers built from the city’s pre-approved plans can be issued over the counter, while custom patio covers, garages and additions go to fast track 2. Garage conversions need both a site plan and construction plans. Rooftop solar uses the city’s photovoltaic application, and the division posts instructions for SolarAPP+ automated solar permits. An ADU built from a mobile home or tiny home is on fast track 2, but a new detached ADU, like a new house, goes through general processing.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
Commercial tenant improvements are on fast track 2, and new commercial buildings and apartment complexes are in general processing, where the city warns that commercial projects may take longer than six weeks. Commercial projects use the commercial building permit application, and the city publishes commercial design guidelines and streetscape standards (Planning Division) and improvement standards (Building Division) for new development.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Planning approval. Projects that involve setbacks, heights or land use need planning review first. Planning’s forms include conditional use permit, administrative and sign review, temporary use, lot merger and lot line adjustment, parcel map and certificate of compliance applications, and a zoning verification request.
- Planning Commission. Seven residents appointed by the City Council meet on the third Monday of each month at 5:30 p.m. in the City Council Chambers, 1015 Chittenden Avenue, and either decide applications or recommend them to the Council.
- Right-of-way work. Sidewalks, driveway approaches, curbs and gutters need an encroachment permit on the engineering permit application.
- Air district. Demolitions need asbestos clearance under San Joaquin Valley Air Pollution Control District rules.
Corcoran building permit fees
Corcoran’s building fees are in a two-page schedule linked from the Building Division page. The file is titled as a 2024 update, but each page is headed “City of Corcoran Building Permit Fees, Effective 7/1/19” and cites Resolution No. 2968, approved May 28, 2019. Page 1 lists flat fees for common jobs, which must be paid in full when the permit is issued.
Rather talk it over?
Call 1-855-478-4290 →| Project | Fee |
|---|---|
| Minor electrical, mechanical, plumbing or encroachment work | $151 |
| Water heater replacement; swamp cooler; temporary power | $151 each |
| Electric service panel, 400 amps or less | $151 |
| HVAC replacement without ductwork / with ductwork | $151 / $261 (each additional unit without ductwork $55) |
| Re-roof, overlay / with sheathing | $151 / $261 |
| Residential solar electric, 13 kW or less; solar water heating | $395; $151 |
| Carport, patio cover, shed or pergola, with foundation / without | $261 / $151 |
| Block or brick fence; retaining wall over 4 feet; sewer line replacement | $261 each |
| Deck over 200 sq ft or more than 30 inches above ground; awning over 54 inches from the wall | $151 each |
| In-ground pool or spa / prefabricated pool, spa or hot tub over 24 inches deep | $560 / $151 |
| Demolition; maintenance permit (minimum); sign inspection after Planning approval; landscape irrigation compliance | $151 each |
Larger work such as new homes, additions and commercial buildings is charged on page 2 of the same schedule: a valuation table with a base cost plus an amount per $1,000, plan check as a percentage of the building permit fee (with a separate rate for tract homes of the same design), a training and continuing education fee ($10 on permits up to $250, 4% above that) and an internal technology fee ($5 up to $250, 3% above). Fees are doubled for work done without a required permit, and reinspections, services with no listed fee and extra plan review are billed by the hour; outside consultants are charged at actual cost. Ask the division (559-992-2151 ext. 2102) for the figures on a valuation-based permit. The division also posts a refund policy, and planning applications carry their own fees under the 2024 planning fee schedule.
Trade permits and who may pull them in Corcoran
Electrical, plumbing and mechanical upgrades and repairs are issued by the Building Division over the counter, usually within 24 hours; the fee schedule lists minor electrical, mechanical and plumbing work at $151. Solar installers use the city’s photovoltaic permit application or the SolarAPP+ process the division describes.
Rather not deal with the building department?
Get a free quote →- State licenses. The division links to the Contractors State License Board so owners can verify a contractor’s state license before hiring.
- Business license. Every business in Corcoran needs a city business license. Under the Resolution No. 1792 rate sheet (updated July 10, 2018), licensed contractors pay $19 a quarter or $76 a year, a figure that includes a $4 state fee per renewal. Applications are available at City Hall or on the city website and are mailed to 832 Whitley Avenue with the fee (checks payable to the City of Corcoran); questions go to ext. 2002, and home-based businesses add a home occupation form.
- Well drilling and destruction. The Building Department issues well permits on its well application, which asks for the contractor’s state license number and workers’ compensation expiry and a site plan showing each well and boring. Only a contractor with an active C-57 water well license may destroy a well, and copies of monitoring or remediation well applications go to the Kings County Environmental Health Department’s Hazardous Materials Unit.
How to apply for a Corcoran building permit
Review the city’s building requirements for zoning and setbacks, and call Community Development (ext. 2110) if the project needs planning review.
Use the building maintenance, reroof, photovoltaic, commercial, engineering or new-home application that fits the work.
Draw a plot plan using the city’s sample, and add construction plans for garage conversions, additions and new buildings, or use a pre-approved patio plan.
Send the application and plans to Buildingplanningpermits@cityofcorcoran.ca.gov.
Call ext. 2102 for the status of a permit while it moves through its processing track.
Pay the fees the division calculates, collect the permit and keep it on site for inspections.
Review, corrections and what causes delay
The city stresses that review times depend on the backlog and on the quality of the plans, and that the posted times are approximate and can run longer. Projects that need planning review move into the slower general processing track, and fences over 7 feet need Planning approval before the building permit. Garage conversions need both a site plan and construction plans before they can go on fast track 1, and a demolition needs the air district’s asbestos clearance.
Inspections in Corcoran
Request inspections by calling 559-992-2151 ext. 2104, the building inspection request line; the division posts a revised 2026 inspection schedule on its page. For the status of a permit or inspection, call ext. 2102. The building forms include a smoke and carbon monoxide alarm installation compliance form.
Want this handled start to finish?
Get a free quote →Well destructions follow their own inspection sequence: before any work starts, after the casing is cut off 6 feet below grade to show it is clear, to verify the fill level of inorganic material, and after filling to verify the 1-foot concrete cap before the excavation is backfilled. A state well completion report must reach the Building Department within 30 days of finishing.
California building code in Corcoran
Corcoran adopts the state building codes by ordinance; Ordinance 651, adopting the building code, is posted on the Building Division page. The division enforces Title 24, including the energy standards, and the Uniform Housing Code. FEMA’s Community Status Book lists Corcoran (community 060663) as participating in the National Flood Insurance Program, with flood maps effective June 16, 2009 that FEMA marks as showing no flood elevations.
California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
Corcoran building permit FAQs
Who issues building permits in Corcoran?
The city’s Building Division at City Hall, 832 Whitley Avenue, where Kevin J. Tromborg is the Building Official.
How much is a permit for a water heater or reroof in Corcoran?
The fee schedule effective July 1, 2019 lists $151 for a water heater replacement and for a re-roof overlay, and $261 for a re-roof with sheathing.
How do I submit an application?
Email it with your plans to Buildingplanningpermits@cityofcorcoran.ca.gov.
How long does a permit take?
About 24 hours over the counter for trade repairs and reroofs, 3 to 10 working days on the fast tracks, and 4 to 6 weeks for new homes and major work.
Do I need a permit for a shed or fence?
Not for a one-story shed up to 120 square feet without electrical or plumbing, or a wood, chain link or wrought iron fence up to 7 feet that meets zoning. A block or brick fence needs a permit, listed at $261.
Do I need a permit to replace windows?
Not for like-for-like window and door change-outs, according to the Building Division.
How do I schedule an inspection?
Call 559-992-2151 ext. 2104.
When does the Planning Commission meet?
On the third Monday of each month at 5:30 p.m. in the City Council Chambers, 1015 Chittenden Avenue.
Inspections are where schedules slip.
Get a free quote →Corcoran permit search and official resources
To find the status of a permit, call the Building Division at 559-992-2151 ext. 2102. The Community Development Department at City Hall is open Monday to Friday, 8:00 a.m. to 5:00 p.m.
- Corcoran Building Division, forms and fee schedule
- Community Development Department
- Planning Division and planning applications
- City forms and documents
- Planning Commission
- Business license
- Code Enforcement
- Public Works
- Fire services
- City staff contacts
Simplify Corcoran permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Corcoran sooner?
Let Alliance prepare, file, and track your Corcoran permits while your crew stays on the job.
More California permitting guides
Kings County
Read guide →Hanford
Read guide →Lemoore
Read guide →Corona Building Permit Guide
Read guide →Coronado Building Permit Guide
Read guide →Costa Mesa Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Corcoran permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.