In Barstow, building permits come from the City’s Building and Safety Division in the Community Development Department, open Monday to Thursday, 8:00 a.m. to 5:30 p.m. Applications and plans are submitted as hard copies with original, wet signatures. Fees follow the Master Fee Schedule effective June 1, 2026, which the City Council approved on May 5, 2026: a $200,000 project pays $5,045.33 in building permit fees plus 65% for plan review.
What requires a building permit in Barstow?
Barstow’s Building and Safety Division enforces the building codes and standards adopted by the state and the City for residential and commercial structures, through permit processing, plan review and inspections. The City’s forms and its fee schedule show the permits it handles most often.
Common permits
- New buildings, additions and alterations (valued for the permit fee)
- Commercial tenant improvements
- Residential solar under 10 kW (expedited review) and larger solar
- EV charging stations
- Electrical, mechanical and plumbing work, including pools and spas
- Block walls and retaining walls (City specifications)
- Grading, by cubic yards moved
- Elevators, escalators and dumbwaiters
Related City permits
- Encroachment permits for driveways, sidewalks and curbs
- Erosion control, SWPPP and water quality plans
- Fire permits and open flame permits (Fire Protection District)
- Sign reface and temporary sign or banner permits
- Temporary use permits and site plan review
Failing to obtain a required fire permit is charged a double fee under the Fire Protection District’s schedule. Building & Safety also checks access for people with disabilities and inspects for compliance with state and local fire protection rules.
What Barstow decides and what the state holds
The City sets its own fees through the Master Fee Schedule and its development impact fees through the Nexus Study the Council approved with it. Contractor licenses are a state matter; the City’s part is the business license rate it charges contractors working in town.
Barstow building department: who handles permitting
The City of Barstow’s Building and Safety Division, part of the Community Development Department, issues building permits for property inside city limits. Unincorporated land around Barstow is permitted by San Bernardino County.
| Office | Contact |
|---|---|
| Building and Safety Division | Community Development Department; the Building & Safety page lists (760) 255-5169, (760) 255-5151 and (760) 255-5179 |
| Hours | Monday to Thursday, 8:00 a.m. to 5:30 p.m. |
| Fire plan review | Barstow Fire Protection District (fees in the City’s Master Fee Schedule; Fire Permit Application Form on the forms page) |
| Business licenses | City Business License page (application, out-of-town application, fee schedule, review form) |
| Fee schedule and studies | Finance Department, Master Fee Schedule page |
Short on time to read all of this?
Get a free quote →The page does not say which of the three numbers is the permit counter, so ask for Building and Safety when you call.
Permit types in Barstow
Barstow’s fee schedule follows the structure of the 1997 Uniform Administrative Code tables: a building permit priced by valuation, separate unit-fee permits for electrical, mechanical and plumbing work, and tables for elevators and grading.
Residential permits
Homes, additions and alterations take a building permit priced by valuation, with plan review at 65% of that fee. A builder repeating an approved single-family floor plan pays 35% for the second and later plan reviews, provided the permits are dated within three years of the original approval and fall in the same adopted code cycle. Rooftop solar under 10 kW has its own expedited review application, and residential solar up to 15 kW is $401 per structure, including up to two reviews and two inspections. The forms page also has an EV charging station application, block wall and retaining wall specifications, a smoke and carbon monoxide alarm self-certification and a substandard housing checklist.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
Commercial work uses the same valuation table. The City posts a commercial tenant improvement submittal sheet, an ADA compliance form and a site plan review application, and the Barstow Fire Protection District reviews the plans: $802 for new construction or building projects and $294 for a tenant improvement plan. Non-residential solar up to 50 kW is $711, plus $7 per kW from 51 to 250 kW and $5 per kW above that. The Wastewater Operations Department charges $490 for an initial industrial user permit.
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Planning. Site plan review and temporary use permits have their own applications on the forms page.
- Fire. The Fire Protection District charges $216 for a building and zoning compliance review, and its sprinkler, alarm and hood reviews are separate from the building plan check.
- Grading and stormwater. Grading is permitted by cubic yards, and the City Engineer reviews an erosion control plan ($500 for sites under 1 acre) or a SWPPP ($750 for 1 acre or more); a single-family water quality management plan review is $350.
- Right of way. An encroachment permit for a driveway costs the $76.35 issuance fee, $2.76 for Underground Service Alert and $77.50 for the driveway.
- Construction waste. A Construction Waste Management Plan application and worksheets are part of the City’s forms.
Barstow permit fees
Fees come from the City’s Master Fee Schedule effective June 1, 2026, posted on the Finance Department’s page with the note that the City Council approved the updated fees and the Nexus Study on May 5, 2026. The building tables print two columns, the old base rate and the FY27 adopted rate; the figures below are the FY27 adopted column, which roughly triples many building fees.
Not sure this scope needs a permit?
Get a free quote →| Project valuation | FY27 adopted building permit fee |
|---|---|
| $0 to $500 | $76.35 |
| $501 to $2,000 | $76.35 for the first $500, plus $9.91 per additional $100 |
| $2,001 to $25,000 | $224.90 for the first $2,000, plus $45.47 per additional $1,000 |
| $25,001 to $50,000 | $1,272.27 for the first $25,000, plus $32.79 per additional $1,000 |
| $50,001 to $100,000 | $2,090.69 for the first $50,000, plus $22.73 per additional $1,000 |
| $100,001 to $500,000 | $3,227.33 for the first $100,000, plus $18.18 per additional $1,000 |
| $500,001 to $1,000,000 | $10,407.53 for the first $500,000, plus $15.41 per additional $1,000 |
| Over $1,000,000 | $18,214.32 for the first $1,000,000, plus $11.87 per additional $1,000 |
Worked example. A $200,000 addition falls in the $100,001 to $500,000 band: $3,227.33 + (100 × $18.18) = $5,045.33 building permit fee. Add plan review at 65% ($3,279.46), the state strong motion fee for a one- to three-story residential building ($200,000 × 0.00013 = $26.00), the Building Standards Commission fee ($1 per $25,000, so $8.00) and the $15 technology fee, for $8,373.79 before trade, fire and impact fees. The printed bands do not chain exactly ($500,000 works out to $10,499.33 from the band below against $10,407.53 printed), so keep an estimate inside one band.
| Item | FY27 adopted fee |
|---|---|
| Plan review | 65% of the building permit fee |
| Repeat single-family floor plan, second and later reviews | 35% of the building permit fee |
| Re-inspection | $77 per hour |
| Re-inspection outside normal business hours | $309 per hour |
| Inspections with no listed fee; added plan review for revisions | $77 per hour |
| Temporary certificate of occupancy | $250 |
| Certificate of occupancy (no other permit, or after a temporary one) | $150 |
| Duplicate inspection card | $47 |
| Strong motion fee, commercial or over 3 stories | Valuation × 0.00028 (minimum $0.50) |
| Technology fee | $15 per permit |
| Credit card convenience fee | 4% |
Rather talk it over?
Call 1-855-478-4290 →Outside consultants used for plan check or inspection are billed at actual cost. Grading permits start at $76.35 for 50 cubic yards or less and $120.16 for 51 to 100 cubic yards, with separate grading plan review fees. Development impact fees are Section 100 of the same schedule and Lenwood-area development fees are Section 180; ask the City for the amounts that apply to a parcel.
Trade permits and who may pull them
Building and Safety issues electrical, mechanical and plumbing permits. Each has a $76.35 issuance fee (FY27 adopted), unit fees for the work, and plan review at 25% of the trade permit fee where plan review applies.
| Item | FY27 adopted fee |
|---|---|
| Electrical, new single- or two-family home | $0.181 per sq ft |
| Electrical, new multi-family (3 or more units built at once) | $0.163 per sq ft |
| Electrical service up to 200 amps / over 200 to 1,000 amps | $99.08 / $201.86 |
| Electrical, private in-ground pool | $160.80 |
| Temporary service pole | $76.35 |
| Furnace up to 100,000 Btu/h | $48.05 |
| Repair or addition to a heating or cooling system | $44.48 |
| Evaporative cooler | $34.58 |
| Plumbing fixture or trap, each | $31.81 |
| Water heater with vent | $39.96 |
| Building sewer / private sewage disposal system | $80.04 / $241.97 |
| Gas piping, 1 to 5 outlets | $19.96 |
| Private pool / private spa plumbing | $197.27 / $98.25 |
For a new 2,000-square-foot house, the electrical system fee is 2,000 × $0.181 = $362.00, plus the $76.35 issuance fee, or $438.35.
- Who signs. The City posts a Letter of Authorization for Contractor, a Letter of Authorization for Landowner, a Notice to Property Owner and a Subcontractor License Verification form for permits filed through a contractor or agent.
- Special inspection. Work that needs special inspection uses the City’s Special Inspection Authorization Form.
- Business license. The Master Fee Schedule sets annual business license rates for contractors: $100 for a Class A or B general contractor and $75 for each C specialty class listed, such as C-10 electrical, C-36 plumbing and C-20 HVAC, plus an administrative fee of $75 for a new license or $50 on renewal. Out-of-town businesses have their own application.
Rather not deal with the building department?
Get a free quote →How to apply for a building permit in Barstow
Make sure the parcel is in Barstow, and file a site plan review or temporary use permit first where the project needs one.
Use the building permit application, the plan submittal checklist and any project form (solar, EV charging, tenant improvements, walls).
Applications and plans must be hard copies with original, wet signatures, with authorization letters if a contractor or agent applies for the owner.
Deliver the paper set to the Division Monday to Thursday, 8:00 a.m. to 5:30 p.m., with the construction waste management plan and fire permit application where needed.
Plans are reviewed for the 65% plan review fee; added review for changes or revisions is billed at $77 per hour.
Pay the permit, trade, technology and state fees, then schedule inspections with Building and Safety as the work progresses.
Review, corrections and what causes delay
Because plans must be paper originals, a missing wet signature or an unsigned authorization letter sends a submittal back. The City’s forms still cite the 2022 codes, so confirm the code edition with the Division before drawing. Projects also wait on Fire Protection District reviews, which charge $123 for second and later re-submittals of sprinkler plans, on erosion control or SWPPP review by the City Engineer, and on encroachment permits for work in the street. For solar, the third and later reviews or inspections are billed at actual cost, with a $100 minimum due at the third submittal.
Inspections in Barstow
Building and Safety inspects the work under each permit and also inspects for state and local fire protection rules and disability access. A duplicate inspection card costs $47. The fee schedule charges $77 per hour for a re-inspection and $309 per hour for a re-inspection outside normal business hours, and an inspection with no specific fee is billed at $77 per hour.
The Barstow Fire Protection District inspects fire systems separately; for its sprinkler reviews, site re-inspections after the eighth inspection are $176 each, and for its general inspections the first re-inspection is free and later ones are $176. A temporary certificate of occupancy is $250 on request while the final certificate is pending, and a certificate of occupancy is $150 where no other permit is needed or after a temporary certificate.
Building code in Barstow
Barstow’s Building & Safety page links Ordinance 1021-2023, which adopted the 2022 California Building Code, and its application form says plans are reviewed under the 2022 codes from January 1, 2024. Those City pages have not been updated for the 2025 edition, which applies statewide to applications filed since January 1, 2026. Flood insurance: FEMA lists Barstow as a participating community in the National Flood Insurance Program, with a current flood map dated September 2, 2016.
Want this handled start to finish?
Get a free quote →California builds on one statewide code, Title 24, whose 2025 edition took effect on 1 January 2026; the editions in effect when the application is submitted apply, and cities and counties may adopt local amendments only with findings filed with the state (new residential amendments are largely frozen until June 2031). Title 24 and local amendments
Frequently asked questions
Does Barstow issue its own building permits?
Yes. The City’s Building and Safety Division in Community Development issues permits and inspects work inside city limits; San Bernardino County handles unincorporated land.
How much is a building permit in Barstow?
Under the schedule effective June 1, 2026 (FY27 adopted rates), a $200,000 project pays $5,045.33, plus 65% plan review, state fees and a $15 technology fee: $8,373.79 in all.
Can I apply online?
No. The City requires hard-copy applications and plans with original, wet signatures.
When is the Building and Safety office open?
Monday to Thursday, 8:00 a.m. to 5:30 p.m.
Is there a faster permit for home solar?
Yes. Residential solar under 10 kW has an expedited review application; residential solar up to 15 kW is $401 per structure, including two reviews and two inspections.
Do contractors need a Barstow business license?
The fee schedule sets annual rates for contractors: $100 for Class A or B and $75 for each listed C class, plus a $75 administrative fee for a new license.
Who reviews fire sprinklers and fire alarms?
The Barstow Fire Protection District, for example $449 for a residential NFPA 13D or 13R sprinkler system under 10,000 square feet and $604 for an alarm system.
Barstow permit search and official resources
For the status of a permit or copies of permit records, contact Building and Safety; the fee schedule charges $3 per sheet for copies of building plans 11 by 17 inches or smaller and $5 for larger sheets, and applications and forms are free.
Inspections are where schedules slip.
Get a free quote →- Barstow Building & Safety
- Building forms and publications
- Building permit application (PDF)
- Plan submittal checklist (PDF)
- Residential solar under 10 kW, expedited review (PDF)
- EV charging station permit (PDF)
- Commercial tenant improvement submittals (PDF)
- Construction waste management plan (PDF)
- Special inspection authorization form (PDF)
- Subcontractor license verification (PDF)
- Letter of authorization for contractor (PDF)
- Letter of authorization for landowner (PDF)
- Fire permit application form (PDF)
- Master Fee Schedule page
- Master Fee Schedule effective June 1, 2026 (PDF)
- Barstow Nexus Study (PDF)
- Ordinance 1021-2023 (PDF)
- Business license
- California Building Standards Code (Title 24)
Simplify Barstow permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in California. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Barstow sooner?
Let Alliance prepare, file, and track your Barstow permits while your crew stays on the job.
More California permitting guides
San Bernardino County
Read guide →Chino
Read guide →Chino Hills
Read guide →Beaumont Building Permit Guide
Read guide →Bell Building Permit Guide
Read guide →Bell Gardens Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Barstow permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.