Sevier County, Arkansas Building Permit Guide

Sevier County issues no building permits, but the County Judge permits work in county road rights-of-way and a 1992 ordinance requires a development permit in mapped flood hazard areas.

Authority: Sevier County JudgeCounty rules: Road right-of-way and flood ordinancesPhone: 870-642-2425
Road right-of-way permit
$15 from the County Judge
Addresses
911 Coordinator, 870-642-4292
Flood rule
Development permit in flood zones
De Queen trade licence
$75 a year

Sevier County’s ordinances set up no building code or building permit for unincorporated land. What the county does regulate is digging and other work in county road rights-of-way, which needs a $15 permit from the County Judge (870-642-2425), and development in mapped flood hazard areas, which needs a development permit under its flood damage prevention code. Inside De Queen, the Fire Department/Code Enforcement Department handles electrical, plumbing and HVAC permits and the Office of Code Enforcement issues certificates of occupancy.

Who issues building permits in Sevier County?

The County Judge’s office is at 115 North 3rd Street, De Queen, open 8:00 a.m. to 4:30 p.m. on weekdays. The Judge runs the county road system and administers the ordinances the Quorum Court passes; those ordinances can be searched in the Arkansas County Document Search. Census Bureau Vintage 2025 populations are in brackets.

Who permits building work in Sevier County
PlaceWho permits building work
De Queen (6,045)Fire Department/Code Enforcement Department for electrical, plumbing and HVAC permits; building permits approved by the building official under the Land Use & Development Book; City Hall, 220 North 2nd St., (870) 584-3445
Lockesburg (596)The City Council approves each numbered building permit, from fences and sheds to new houses and mobile homes; City Hall, 110 E. Main St., (870) 289-3261
Horatio (907), Gillham (155), Ben Lomond (137)The published sources do not say; ask the town hall
Unincorporated Sevier CountyNo building permit; County Judge for road right-of-way work, development permit in flood zones

Short on time to read all of this?

Get a free quote →

De Queen: electricians and plumbers must first hold a City of De Queen licence, which costs $75 a year and needs photo ID, a $10,000 surety bond and the state licence. Each electrical, plumbing or HVAC permit is then requested from the Fire Department/Code Enforcement Department, and the price depends on the project. The City’s Land Use & Development Book requires a scale plan, in duplicate, with every building permit application, and new construction may not be occupied until the Office of Code Enforcement inspects it and issues a certificate of occupancy. A variance or zone change costs $500 plus any publication charges above that amount, and usually takes 6 weeks to 2 months.

Lockesburg: under Ordinance 2015-1, plumbing inspections cost $20 per trip (the rough-in, one trip for fixtures and connections, and the final certificate), a return trip caused by the plumber costs another $20, and a homeowner may get a permit to plumb his or her own single-family house. Under Ordinance 2017-2, moving a mobile home into town needs a moving permit approved by the City Council, with a $100 nonrefundable application fee and an inspection by the Mayor or a designee first; the City will not connect water or sewer until the rules are met.

Not sure this scope needs a permit?

Get a free quote →

What Sevier County requires outside the towns

County Judge permit

  • Installing, repairing or enlarging water lines, sewers, drainage structures or other utilities that cut into a county road right-of-way
  • Any other work within a county road right-of-way
  • $15 fee, plus a cash or surety bond of 50% of the value of the work posted with the County Treasurer
  • Proof of at least $100,000 of liability insurance

Other county rules

  • Development permit for building in a special flood hazard area
  • A 911 address from the county’s uniform numbering system
  • No signs or objects placed in or on county road easements
  • Septic permit through the Arkansas Department of Health

Road, flood and address rules in Sevier County

County road rights-of-way: Ordinance 160, dated December 21, 1983, lets the County Judge add conditions such as warning signs and barricades. Roads the Judge designates as primary roads may not be cut open; lines must be bored or drilled under them, and any other cut must run at right angles to the center line. The Judge can waive the permit when a landowner does the work on their own land without cutting or digging into a road surface. Violations carry a fine of up to $250 a day.

Flood hazard areas: Ordinance 237, passed December 30, 1992, adopts the county’s flood damage prevention code, which requires a development permit and says no structure or land may be located, altered or change use in a flood hazard area without full compliance. The code is filed with the County Clerk, and each day of a violation can bring a fine of up to $100. FEMA lists Sevier County, De Queen, Gillham, Horatio and Lockesburg as participating National Flood Insurance Program communities; the county’s current map is dated April 1, 1988.

Rather talk it over?

Call 1-855-478-4290 →

Addresses: a 1995 ordinance set up the county’s uniform numbering system for houses and buildings. For a new address, call the 911 Coordinator at 870-642-4292.

Septic systems: the Arkansas Department of Health reviews onsite wastewater permit applications for systems under 1,500 gallons per day, working with its local environmental specialists.

Building on rural land in Sevier County, step by step

1. Confirm the jurisdiction

De Queen and Lockesburg permit work inside their limits; outside the towns, the county rules above apply.

2. Check the flood map

A lot in a special flood hazard area needs the county’s development permit before you build.

3. Get the septic permit

Apply through the Department of Health for an onsite system.

4. Get a road right-of-way permit if needed

Driveway, water line or utility work in a county road right-of-way needs the County Judge’s permit, bond and insurance first.

5. Call for an address

The 911 Coordinator assigns the address used for utilities and emergency services.

Rather not deal with the Sevier County building department?

Get a free quote →

Arkansas building code

Arkansas’s building code is the 2021 Arkansas Fire Prevention Code, adopted by the State Fire Marshal and in force statewide since 1 January 2023; building permits are issued locally where a city or county runs a permit program, and the plumbing, gas, mechanical, energy and electrical codes are adopted by separate state agencies. The Arkansas codes

Sevier County permit FAQs

Do I need a county building permit in Sevier County?

No. The county’s ordinances create no building permit for unincorporated land, but you may still need the County Judge’s right-of-way permit, a flood development permit and a Department of Health septic permit.

How much is a county road right-of-way permit?

$15, with a bond of 50% of the value of the work and proof of $100,000 of liability insurance.

Who issues electrical and plumbing permits in De Queen?

The Fire Department/Code Enforcement Department, after the electrician or plumber has a $75 yearly City licence.

How do I get a building permit in Lockesburg?

Apply at City Hall, 110 E. Main St. (870-289-3261); the City Council votes on each permit at its meeting.

Who assigns addresses in Sevier County?

The 911 Coordinator, at 870-642-4292.

Is Sevier County in the flood insurance program?

Yes. The county and De Queen, Gillham, Horatio and Lockesburg all participate.

Want this handled start to finish?

Get a free quote →

Official Sevier County permit resources

Inspections are where schedules slip.

Get a free quote →

Simplify Sevier County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Arkansas. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Sevier County sooner?

Let Alliance prepare, file, and track your Sevier County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Sevier County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.