Skip to main content

Saline County, Arkansas Building Permit Guide

Saline County’s Road Department on Cynamide Road houses its subdivision review, stormwater and 911 addressing work; building permits come from the cities, led by Benton and Bryant.

County building permits: None on the county websiteCounty offices: Road Department, 5555 Cynamide RoadLargest city: Benton
Benton
501-776-5938Community Development
Bryant
501-943-0488iWorQ online portal
Planning Board
(501) 303-5690Subdivision rules
911 addressing
501-303-1586Addressing Coordinator

Saline County’s permit roles are subdivision review by its Planning Board, stormwater permits and 911 addressing. The Census Bureau lists seven incorporated places in the county: part of Alexander, Bauxite, Benton, Bryant, Haskell, Shannon Hills and Traskwood. By its 2025 estimates the most populous are Benton (38898), Bryant (22815), Shannon Hills (4829) and Haskell (4362), and 57473 people live in the unincorporated balance.

This guide covers the county’s subdivision, stormwater, addressing and septic routes and the offices of Benton, Bryant and Haskell. Shannon Hills’ website could not be checked, so contact the city directly. No county building permit page was found for unincorporated land, so ask the county before building there.

What requires a permit in Saline County?

Saline County issues stormwater permits for various construction activities under its 2015 Stormwater Quality Ordinance, and subdivisions fall under the county’s subdivision rules. Inside Benton and Bryant the city issues building permits. In Benton, even a fence repair or replacement needs a permit with drawings; Ordinance 44 of 2026 sets the fence permit fee at $25.

Short on time to read all of this?

Get a free quote →

Arkansas’s building code is the 2021 Arkansas Fire Prevention Code, adopted by the State Fire Marshal and in force statewide since 1 January 2023; building permits are issued locally where a city or county runs a permit program, and the plumbing, gas, mechanical, energy and electrical codes are adopted by separate state agencies. The Arkansas codes

Who handles permitting in Saline County?

Permit offices in Saline County
PlaceOfficeContact
Planning Board (subdivisions)Saline County Road Department, 5555 Cynamide Road, Benton(501) 303-5690
Stormwater permitsCounty Engineering Department (John Wofford)(501) 303-5690
911 addressingAddressing Office, Road Department, 5555 Cynamide Road, Benton501-303-1586
SepticSaline County Local Health Unit, 1612 Edison Ave., Benton(501) 303-5650
BentonCommunity Development Department, 410 River Street501-776-5938; Monday to Friday 7:00am to 6:00pm
BryantPlanning & Development, 210 SW 3rd St.501-943-0488; comdev@cityofbryant.com
HaskellCity Hall, 2520 AR-229, Benton(501) 776-2666

Not sure this scope needs a permit?

Get a free quote →

Saline County subdivision, stormwater and addressing

The Saline County Planning Board oversees the county’s subdivision rules and meets monthly on the 2nd Thursday at 5:30 p.m. in Courtroom #3 of the courthouse; its office is at the Road Department. Stormwater permits are run by the county Engineering Department under the 2015 ordinance. New 911 addresses are assigned by the Addressing Office at the Road Department.

Building permits in Benton, Bryant and Haskell

Benton

The Community Development Department processes building permits and does inspections. Permit forms are downloaded, filled in and emailed to permits@bentonar.gov. Front-yard fences may not exceed 3 feet, and fences must sit at least 5 feet from any street or public right of way.

Bryant

Planning & Development takes construction permit applications through the city’s iWorQ online portal. A right-of-way permit is $50.00.

Haskell

The city website shows a Planning Commission and zoning and subdivision regulations but no building department page, so ask City Hall.

Saline County permit costs and fees

Bryant: one- and two-family building permits cost $0.14 per square foot under roof, minimum $150.00 for a new building; commercial is $0.15 per square foot, minimum $200.00, plus a plan review fee of half the permit fee when valuation exceeds $100,000.00, capped at $5000.00. Starting work before permit issuance doubles the fee.

Rather talk it over?

Call 1-855-478-4290 →

Benton: since October 1, 2026, Ordinance 44 of 2026 sets a new house or manufactured home’s building permit at $0.10 per square foot under roof ($30 minimum), with the plumbing, electrical and HVAC permits at $0.10 per square foot each; commercial building permits are $0.12 per square foot. A fence permit costs $25, although the City’s older fence form says repairs carry no fee.

How to get a permit in Saline County

1. Find the city

Benton and Bryant issue building permits inside their limits.

2. Address

Get a 911 address from the county Addressing Office.

3. Stormwater and subdivisions

County stormwater permit for construction activities; Planning Board review for subdivisions.

4. Septic

Apply through the Arkansas Department of Health and the local Environmental Specialist.

5. File

Benton: email the forms to permits@bentonar.gov. Bryant: use the iWorQ portal.

A building permit carries a validity period set by the local building office; confirm the expiry on phased or delayed work before it passes. Permit validity in Arkansas

Rather not deal with the Saline County building department?

Get a free quote →

Inspections in Saline County

Benton’s Community Development Department does the city’s inspections. In Bryant, reinspections cost $35.00 ($50.00 for electrical) and will not be rescheduled until each failed trade’s reinspection fee is paid.

Official Saline County permitting resources

These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.

Want this handled start to finish?

Get a free quote →

Frequently asked questions

Does Saline County issue building permits?

No county building permit office appears on the county’s website. The county handles subdivision review, stormwater permits and 911 addressing; Benton and Bryant issue building permits.

How do I file a Benton building permit?

Download the form, fill it in and email it to permits@bentonar.gov.

What does a new house permit cost in Bryant?

$0.14 per square foot under roof, with a $150.00 minimum for a new building.

Simplify Saline County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Inspections are where schedules slip.

Get a free quote →
  • Confirm which city office, if any, issues the building permit for the parcel
  • Line up the county road, stormwater or addressing approvals and the Department of Health septic application
  • Prepare the city application and track it through review and inspections

Alliance Permitting is a permit documentation and submission company in Arkansas. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Saline County sooner?

Let Alliance prepare, file, and track your Saline County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Saline County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.