Skip to main content
Municipal GuideArkansasHempstead County

Hempstead County, Arkansas Building Permit Guide

Hempstead County publishes no county building permit; Hope’s Building Services office permits and inspects construction in the city, and rural addresses come from the county’s 911 office.

Authority: Hempstead County JudgeHope permits: Building Services, 870-722-2505Phone: (870) 777-6164
Incorporated places
11
Hope review time
5–7 business days, residential
County flood program
NFIP member since 2007
Rural addresses
Online 911 address request

Hempstead County’s government publishes no building permit, inspection program or building ordinance for unincorporated land; its departments cover roads, records, taxes and emergency services. Inside Hope, the City’s Building Services office (870-722-2505) handles all building permits and inspections and takes applications through an online portal. In the rest of the county, the OEM/911 Coordinator assigns addresses and the Arkansas Department of Health permits septic systems.

Who issues building permits in Hempstead County?

The County Judge’s office (870-777-6164) runs the county road system and administers the Quorum Court’s ordinances; county mail goes to PO Box 1420, Hope. Census Bureau Vintage 2025 populations are in brackets.

Who permits building work in Hempstead County
PlaceWho permits building work
Hope (8,445)City Building Services, Public Works, 1603 W. 3rd St.; 870-722-2505; online iWorQ portal
Blevins (282), Perrytown (222), Fulton (111), Washington (92), Oakhaven (63), Patmos (57), McCaskill (56), Ozan (49), McNab (28)The published sources do not say; ask the town hall
Emmet (16 residents in Hempstead County)Most of Emmet is in Nevada County; the published sources do not say who permits
Unincorporated Hempstead CountyNo county building permit; 911 address from the OEM/911 Coordinator

Short on time to read all of this?

Get a free quote →

Hope: the Building Official issues building permits, makes building inspections and works with the Planning and Zoning Commission on rezoning cases, while the Code Enforcement Officer makes the plumbing, electrical, HVAC and gas inspections. The City enforces the 2021 Arkansas Fire Prevention Code (fire, building and residential volumes), the 2018 Arkansas Plumbing and Fuel Gas Codes, the 2021 Arkansas Mechanical Code, the 2014 Arkansas Energy Code and the 2020 National Electrical Code.

What a Hope building permit application needs

Applied for online

  • New houses and commercial buildings
  • Additions
  • Remodels
  • Mobile homes
  • Commercial accessory buildings

With the application

  • A drawing or sketch of the work and a site plan
  • A copy of the deed and a survey
  • Estimated cost, building dimensions and square footage
  • Names and licence numbers of the building, plumbing, electrical and heat and air contractors

Not sure this scope needs a permit?

Get a free quote →

Hope reviews residential applications within 5 to 7 business days; commercial plans take longer. The City works out the fee once it has the full application, and it must be paid before the permit is issued. Plumbing, electrical and HVAC permits are separate and are issued to the licensed trade contractors, who also request their own inspections. Hope Water & Light reviews the electric and water connections.

Addresses, flood zones and septic systems in the county

911 addresses: the county’s OEM/911 Coordinator manages the 911 dispatch center and takes new address requests online through the county’s address request link. The county’s main line is (870) 777-7800.

Flood insurance: FEMA’s Community Status Book shows Hempstead County joined the National Flood Insurance Program on October 1, 2007, with flood maps dated April 4, 2011, so building in its mapped flood hazard areas is subject to the county’s floodplain rules. Hope, Fulton and Emmet also participate. Blevins (listed by FEMA as “Blevens”), Perrytown and Washington are among the communities not in the program, and FEMA does not list McCaskill, McNab, Oakhaven, Ozan or Patmos.

Rather talk it over?

Call 1-855-478-4290 →

Septic systems: lots without sewer need an onsite wastewater permit; the Arkansas Department of Health reviews applications for systems under 1,500 gallons per day with its local environmental specialists.

Steps for building in Hempstead County

1. Confirm whether the lot is in Hope

Inside Hope, apply through the City’s online portal; in the smaller towns, call the town first.

2. Check the flood map

The county and Hope both take part in the flood insurance program, so mapped flood zones carry building rules.

3. Line up the septic permit

Rural lots without sewer need Department of Health approval for the onsite system.

4. Request the 911 address

Use the county’s online address request so utilities and emergency services can find the site.

5. Book the trade permits

In Hope, each licensed plumber, electrician and HVAC contractor pulls a separate permit and calls for inspections.

Rather not deal with the Hempstead County building department?

Get a free quote →

Arkansas building code

Arkansas’s building code is the 2021 Arkansas Fire Prevention Code, adopted by the State Fire Marshal and in force statewide since 1 January 2023; building permits are issued locally where a city or county runs a permit program, and the plumbing, gas, mechanical, energy and electrical codes are adopted by separate state agencies. The Arkansas codes

Hempstead County permit FAQs

Does Hempstead County issue building permits?

No county building permit or inspection program is published. Hope permits and inspects construction inside its limits.

How long does a building permit take in Hope?

Hope reviews residential applications within 5 to 7 business days; commercial applications take longer because of plan review.

What do I need to apply for a house permit in Hope?

A sketch of the work, a site plan, a copy of the deed and a survey, the estimated cost and your contractors’ licence numbers.

Who assigns a new address in rural Hempstead County?

The county OEM/911 Coordinator, through the online address request. The county’s main line is (870) 777-7800.

Is Hempstead County in the flood insurance program?

Yes, since October 1, 2007, along with Hope, Fulton and Emmet.

Want this handled start to finish?

Get a free quote →

Official Hempstead County permit resources

Inspections are where schedules slip.

Get a free quote →

Simplify Hempstead County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Arkansas. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Hempstead County sooner?

Let Alliance prepare, file, and track your Hempstead County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Hempstead County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.