The City of Ketchikan’s Building Division (Public Works, 2930 Tongass Avenue, 907-228-4737) reviews plans, issues building and trade permits, inspects the work and issues the certificate of occupancy for property inside city limits. Applications are not filed at the Division: they go to the Ketchikan Gateway Borough Planning & Community Development office together with a Borough zoning permit application, and a typical house permit is ready 6 to 10 working days after the City receives the file. A $25,000 home project pays a $391.25 permit fee, with no separate plan review fee.
The City and the Borough are separate, unconsolidated governments: the Borough handles zoning, building height, setbacks and lot coverage inside the city, and the City enforces the building codes. Work that needs no City building permit can still need a Borough zoning permit (907-228-6610).
What requires a building permit in Ketchikan?
The City’s handouts list what needs a City permit inside city limits. Electrical, plumbing, gas, mechanical, elevator and fire protection work are all covered by a City building permit.
Permit required
- New buildings, additions, alterations, remodels, repairs, decks and stairways
- Electrical work beyond minor repairs such as replacing switches and receptacles
- Plumbing and gas work beyond fixing valves, faucets and stoppages
- Boilers, furnaces, heat pumps, wood stoves, ventilation, exhaust and refrigeration
- Elevators, cranes, escalators and hoists
- Sprinklers, standpipes, fire alarms, fire mains and kitchen hood suppression (shop drawings required)
- Site work, through a separate Site Development Permit
No permit (homes)
- A detached one-story shed or playhouse of up to 200 sq ft at a one- or two-family home
- Detached, uncovered decks of up to 200 sq ft, no more than 30 inches above grade, that do not serve the exit door
- Retaining walls under 4 feet high that carry no surcharge
- Re-roofing or re-siding with like material
- Replacing windows without changing the opening, unless needed for egress
- Gutters, cabinets, shelving and play equipment
Other approvals that can apply: a side sewer permit to connect to or cap a City sewer, a traffic permit for work in a right of way, an excavation permit, a demolition permit, the Borough zoning permit, a Borough floodplain development permit in a mapped flood zone, and Army Corps of Engineers, Department of Environmental Conservation or state transportation approvals.
Alaska's state codes exempt homes of three units or fewer, so residential permits exist only where a city or borough has adopted a code. Contractor licensing applies statewide, and the Fire Marshal reviews larger buildings outside deferred jurisdictions. Alaska rules
Short on time to read all of this?
Get a free quote →Ketchikan building department: who handles permitting
The Building Division of the Public Works Department enforces the City’s adopted codes, reviews plans and inspects. The State Fire Marshal lists Ketchikan as a deferred jurisdiction, so the City, not the state, reviews commercial and multifamily plans inside city limits.
| Detail | Information |
|---|---|
| Authority | City of Ketchikan Building Division (Public Works); Building Official Corey Bingham |
| Office | 2930 Tongass Avenue, Ketchikan, AK 99901 |
| Phone | Building Official (907) 228-4737; permit questions (907) 228-4721; inspections also (907) 228-4720; fax (907) 225-8721 |
| Where to file | Ketchikan Gateway Borough Planning & Community Development, 1900 First Avenue, Suite 126 (White Cliff Building) |
| Where to pay | City Hall, 334 Front Street, (907) 225-3111 |
| Fire protection questions | City Fire Marshal, (907) 225-9616 |
| Codes | 2021 IBC, IRC, IEBC, IFC, IMC, IECC and UPC, the 2020 NEC and the 1997 dangerous buildings code, each with local amendments (Ordinance 2005, 2025) |
Permit types
Residential permits
Houses and duplexes are reviewed under the 2021 International Residential Code; a triplex or larger building counts as commercial work under the International Building Code. A homeowner may draw the plans for a house or duplex, or use a contractor or residential drafter, and the City may issue the permit to a homeowner for a single-family house, duplex, townhouse or condominium unit. Contractors on a home job of $10,000 or more need the state residential endorsement, and handyman work is capped at $10,000.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
Commercial plans must be sealed by an architect or engineer registered in Alaska, and a commercial permit is issued only to a contractor licensed under state law. Deferred submittals, such as truss calculations, must be listed on the plans and approved by the Building Official before the related inspection.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
Permit life
Under KMC 19.04.090 (Ordinance 2005, 2025), a City building permit expires one year after it is issued, or when the work is finished if that comes first. The Public Works Director can grant extensions of up to 180 days each on a written request filed before it expires, if you show justifiable cause. The City’s 2023 handout also says a permit becomes invalid if work does not start within six months or stops for more than six months.
Not sure this scope needs a permit?
Get a free quote →Alaska licenses contractors at state level. A general contractor building homes needs the residential endorsement, which requires an exam and a cold-climate construction course. Alaska rules
Ketchikan permit costs and fees
The Building Division’s Building Permit Basics handout (revised October 9, 2026) sets out how fees are worked out. The applicant gives a project valuation that includes materials and labor, and the Building Official can refuse a valuation that looks too low.
| Project | Fee |
|---|---|
| House or duplex: new, addition or alteration | Permit fee from Table 109.2.1 of KMC 19.04.010; no plan review fee |
| Commercial alteration, addition or tenant improvement | Table 109.2.1 fee plus plan review of 65% of that fee |
| New commercial or multifamily (3+ units): valuation up to $500,000 | 1.5% of valuation, plus 65% plan review |
| Valuation $500,001 to $1,000,000 | 1% of valuation, plus 65% plan review |
| Valuation $1,000,001 to $5,000,000 | 0.8% of valuation, plus 65% plan review |
| Valuation over $5,000,000 | 0.6% of valuation, plus 65% plan review |
Worked examples from the handout: a $25,000 house project pays $69.25 for the first $2,000 plus $14 for each of the 23 further thousands, or $391.25. The same fee on a commercial alteration adds $254.31 of plan review, for $645.56. A new 4,000 sq ft wood-frame office is valued at $163.62 per sq ft times the 1.3 regional modifier, or $850,824, so it pays 1% ($8,508.24) plus $5,530.36 of plan review, $14,038.60 in all.
| Valuation | Permit fee |
|---|---|
| Up to $500 | $23.50 |
| $500.01 to $2,000 | $23.50 plus $3.05 per additional $100 |
| $2,000.01 to $25,000 | $69.25 plus $14 per additional $1,000 |
| $25,000.01 to $50,000 | $391.25 plus $10.10 per additional $1,000 |
| $50,000.01 to $100,000 | $643.75 plus $7 per additional $1,000 |
| $100,000.01 to $500,000 | $993.75 plus $5.60 per additional $1,000 |
| $500,000.01 to $1,000,000 | $3,233.75 plus $4.75 per additional $1,000 |
| Over $1,000,000 | $5,608.75 plus $3.65 per additional $1,000 |
Rather talk it over?
Call 1-855-478-4290 →Each part of $1,000 counts as a full $1,000. Inspections outside business hours (two-hour minimum), inspections with no listed fee and extra plan review after plan changes cost $57 an hour, or the City’s full hourly cost if higher. A demolition permit is $25 (KMC 19.04.100). Fees are paid at City Hall, and the Finance Department must receive them in full before the permit is issued.
Trade permits and who may pull them
City permit required
- Electrical work, under the 2020 NEC as amended by the City
- Plumbing and gas piping, under the 2021 Uniform Plumbing Code as amended
- Mechanical equipment and its components, with a plan showing outdoor equipment locations
- Fire protection systems, with shop drawings
No permit
- Replacing switches, receptacles and current-carrying parts of the same rating; portable appliances and motors
- Repairing working parts of valves and faucets, clearing stoppages and fixing leaks without re-piping
- Portable heating, cooling and ventilating units, and like-for-like replacement parts
- Low-voltage wiring, unless it passes through a fire-rated assembly or a non-combustible plenum
Trade permits that need no plan review, such as an electrical service upgrade, are handled faster than full building reviews.
Electrical and mechanical contractors need a state-licensed administrator, and electricians and plumbers need a state certificate of fitness. Alaska rules
Rather not deal with the building department?
Get a free quote →How to apply for a Ketchikan building permit
Use the City’s “No Permit is Required For” handout, or call Building Division staff at 907-228-4721; ask the Borough at 907-228-6610 about the zoning permit either way.
For a house: site, foundation, floor, floor framing and roof framing plans, exterior elevations and cross sections, all to scale, with two sets of truss calculations if trusses are used. Commercial work needs sealed architectural, structural, mechanical, plumbing, electrical, exiting and grading plans, a soils report and, where the code requires it, a fire sprinkler design.
New homes and additions need a Site Development Permit from Public Works Engineering, and new or repaired water, sewer and storm connections need a Service Connection Permit; request utility locates, and a traffic permit for work in the right of way.
Take the City Building Permit Application (Form #10) and plans, with the Borough zoning permit application and the owner authorization page, to 1900 First Avenue, Suite 126.
Once zoning is approved, the Borough sends the file to the City Building Division for plan review; when the permit is ready, staff call or email you to pay at City Hall.
After payment the City emails a digital permit to the applicant, owner and designer; pick up the approved plans and the job-site placard at the Building Division and keep the plans on site for inspections.
Plan review times
The handout gives an average of 6 to 10 working days for a residential permit and up to 16 working days for a commercial one, counted from when the Building Division receives the file from the Borough. Incomplete submittals may be returned quickly when more information is needed.
Inspections in Ketchikan
Call for each inspection before anything is covered (907-228-4720 or 907-228-4737); the Division can reject work that was concealed before inspection. The handout lists these stages:
- Excavation, backfill, slope and drainage: inspected under the Site Development Permit by Public Works Engineering
- Buried utilities: water, sewer, conduit and sprinkler lines, inspected by the utility before backfill
- Foundation: rebar, anchor bolts and hold-downs before concrete, with setbacks checked against marked property lines
- Electrical, plumbing and mechanical rough-ins, then framing: the framing inspection comes after the rough-ins are in place, with straps, hold-downs and shear walls still visible; plumbing and mechanical lines are tested with water or air
- Drywall in fire-rated, shear wall and draft-stop assemblies, and insulation and vapor retarder before drywall
- Final: fixtures, outlets, smoke detectors, railings, siding, roofing, flashing, decks and address numbers
Want this handled start to finish?
Get a free quote →After the final, the Building Official issues the certificate of occupancy; a temporary certificate is possible only when all life safety items are met. Commercial projects add fire alarm, special inspection, grading, structural observation and accessibility sign-offs, with letters from the design professionals.
Ketchikan permit search and official resources
- City of Ketchikan Building Inspections
- Building Permit Basics handout (revised October 9, 2026)
- City Building Permit Application, Form #10
- City handout: no permit is required for
- City handout: a building permit is required for
- Building codes adopted in 2025
- City Public Works permit applications (side sewer, traffic, excavation, site development)
- Ketchikan Municipal Code
- Ketchikan Gateway Borough permits and applications
- Alaska State Fire Marshal plan review and deferred jurisdictions
Frequently asked questions
Who enforces the building code in Ketchikan?
The City of Ketchikan’s Building Division, part of Public Works, at 2930 Tongass Avenue (907-228-4737), for property inside city limits.
Inspections are where schedules slip.
Get a free quote →Where do I submit a Ketchikan building permit application?
Not at the City office. Form #10 and the plans go to the Borough planning office in the White Cliff Building, with the zoning application and the owner authorization page, and reach the City Building Division only after zoning approval.
How much is a building permit in Ketchikan?
House and duplex permits come from the City’s valuation table with no plan review fee: a $25,000 project pays $391.25. Commercial work adds plan review at 65% of the permit fee.
How long does plan review take?
On average 6 to 10 working days for a residential permit and up to 16 working days for commercial, from when the City receives the file.
Can a homeowner pull a permit in Ketchikan?
Yes, for a single-family house, duplex, townhouse or condominium unit, and the homeowner may draw the plans. Commercial permits go only to state-licensed contractors.
Do I need a permit for a shed or deck?
Not for a detached one-story shed of up to 200 sq ft at a one- or two-family home, or a detached deck of up to 200 sq ft that is no more than 30 inches above grade and does not serve the exit door. Covered decks always need a permit, and a Borough zoning permit may still apply.
Which plumbing and electrical codes apply?
The 2021 Uniform Plumbing Code and the 2020 National Electrical Code, each with the City’s local amendments adopted in 2025. The City’s building permit covers the trade work, done by state-licensed trades.
Simplify Ketchikan permitting with Alliance Permitting
21+ years of working real jurisdictions is what tells you that Ketchikan enforces its code with local amendments and takes building applications through the Borough planning office. Our team confirms the city's amendments up front, holds the state contractor licence, and tracks the permit through the Building Inspection Division to a certificate — corrections included.
Ready to break ground in Ketchikan sooner?
Send us the scope and the parcel. We confirm the review path with the City of Ketchikan Building Inspection Division, assemble the submittal, file it, and track it through issuance — corrections included.
More Alaska permitting guides
More Alaska permitting guides
Sitka
Read guide →City and Borough of Juneau
Read guide →Anchorage
Read guide →Ketchikan Gateway Borough Building Permit Guide
Read guide →Kodiak Island Borough Building Permit Guide
Read guide →Matanuska-Susitna Borough Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Ketchikan permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.