Building permits inside the City of Opelika are issued by the city’s Building Inspection Division, at the Public Works Administration building, 710 Fox Trail, Opelika 36803 (334-705-5420). The division approves and inspects all construction within the city limits and issues the building, electrical, plumbing and mechanical permits. Residential plans are usually approved in 3 to 4 business days, and the building permit fee is set by valuation under § 5-17.1 of the city code, starting at $8 per $1,000. Opelika adjoins Auburn so closely that the two are routinely spoken of as one place, and they are not: they are separate cities with separate building departments, separately adopted codes and separate fee schedules, sitting alongside a third authority in unincorporated Lee County.
This guide covers the department and how to reach it, the code edition that governs a filing here, what permits cost and who may pull them, and how inspections are booked. Rules that apply everywhere in Alabama are summarized in each section, with a link to the full statewide explanation.
This guide covers work inside the City of Opelika limits. Auburn and unincorporated Lee County are separate authorities.
Auburn and Opelika are one urban area and three permitting answers. Add unincorporated Lee County and the police jurisdictions around both cities, and a parcel in this corridor genuinely needs checking. The two cities adopt independently, so a plan set that cleared review a few miles away is not automatically compliant here — and the fee schedule certainly is not the same.
What requires a building permit in Opelika?
Under the city's locally adopted codes, a permit is required for most construction activity inside the city limits.
Permit required
- New residential and commercial construction, additions, conversions and tenant improvements
- Structural and load-bearing alterations, foundations, decks, porches and garages
- Electrical service changes, panel work, new circuits, solar and EV charging equipment
- Plumbing alterations, repipes, water heaters, gas piping and sewer connections
- HVAC installations, change-outs, ductwork and venting
- Re-roofing, siding, windows, pools, signs, demolition and change of occupancy or use
Typically exempt
- Painting, wallpapering, tiling, carpeting and cabinet installation
- Countertop replacement and comparable finish work
- Minor repairs replacing existing materials in kind with no structural or system change
- Small detached accessory structures below the local size threshold, where zoning allows
Exemptions are narrow and local, and an exemption from a building permit is not an exemption from zoning, setbacks, floodplain rules, utility approval or a fire authority review. Confirm scope with the department before work starts rather than after.
Which code edition applies
Opelika adopted the 2021 International Building Code and the 2021 International Residential Code, each with all appendices and local amendments, by Ordinance 023-24 on 17 September 2024 (§ 5-16 and § 5-17 of the city code); both apply within the corporate limits. The amendments send energy requirements to the Alabama Commercial and Residential Energy Codes and change a few residential details, among them a 6 mil vapor retarder under concrete slabs and measured whole-house ventilation rates. Auburn and Lee County adopt their codes separately.
In Alabama, where a project is and what it is decide who reviews it, and whether anyone reviews it at all. There is a State Building Code, but its scope is deliberately narrow. There is a statewide residential code, but it is enforced only by local jurisdictions that run residential permitting and inspection programs (§ 34-14A-12(b)). And everything else — ordinary private commercial and residential work — is permitted and inspected locally, by whichever city or county has taken that job on.
Short on time to read all of this?
Get a free quote →The State Building Code is administered by the Division of Construction Management (DCM), a division of the Alabama Department of Finance (§ 41-4-400), under Title 41, Chapter 9, Article 6 of the Code of Alabama. DCM adopted the 2021 International Building Code effective 1 July 2022, and amended it on 17 March 2025 to pull in portions of the 2024 International Building Code and its companion codes. But DCM applies that code only to work on state-owned property or using state funds, to all public and private K–12 schools, to public postsecondary schools, and to hotels, motels and movie theatres. On municipal and county-owned projects DCM’s jurisdiction is limited to ADA Standards compliance. DCM has no jurisdiction over residential property, and none over commercial property beyond hotels, motels and theatres.
So for the overwhelming majority of private construction in Opelika, the code that governs you is the one Opelika’s Building Inspection Division has adopted, and the office that enforces it is the local one.
From 1 January 2027, under Act 2024-443, a residential home builder must build to the applicable residential code (the Alabama Residential Building Code, or the local code where one applies) even where no building department inspects the work. Since 1 October 2024 the Alabama Home Builders Licensure Board adopts the residential code, and the Licensing Board for General Contractors the commercial energy code. Alabama’s codes and the 2027 change
Who handles permitting in Opelika?
Opelika’s Building Inspection Division handles plan review, permit issuance and inspections inside the city limits. The division page names Jeff Kappelman as Chief Building Inspector, with separate electrical and plumbing inspectors. On commercial work the site plan goes to the Planning Department and a Fire Inspector from the Fire Department’s Inspection Services (334-705-5319) reviews the plans against the fire codes; land disturbance permits come from Engineering (334-705-5450) in the same building. Auburn permits its own limits, Lee County Building Inspections covers the unincorporated county, and septic certificates come from the Lee County Health Department (334-745-5765).
| Detail | Information |
|---|---|
| Authority | Opelika’s Building Inspection Division |
| Offices | Building Inspection Division, Public Works Administration, 710 Fox Trail, Opelika, Alabama 36803 |
| Phone | 334-705-5420 |
| Chief Building Inspector | Jeff Kappelman |
| Status and payments | Opelika Business Portal (ss.opelika-al.gov): look up permits, inspections and plans and pay invoices; applications are still made on the division’s forms |
| Counter hours | Monday to Friday, 7:00am to 4:00pm (Public Works office hours) |
| Jurisdiction | City of Opelika limits only |
| Neighbouring authorities | City of Auburn and unincorporated Lee County |
| Historic districts | Certificate of Appropriateness before permits for exterior work in the Downtown, Geneva Street and Northside districts |
| From 1 January 2027 | Statewide residential code duty on the builder under Act 2024-443 |
In much of Alabama the city is the only building authority there is. County adoption of building codes is optional (a county commission may adopt them by resolution, § 34-14A-12(c)), and a substantial number of Alabama counties — including some with well over 50,000 residents — operate no county building department at all. Where that is the case, crossing the city limit does not move you to a different building authority; unless the city enforces its code in its police jurisdiction, it moves you outside building permitting altogether, into zoning, health department, floodplain and utility requirements administered separately.
Downtown Opelika sees a steady stream of renovation, adaptive reuse and change-of-occupancy work in older commercial buildings. On that work the existing building compliance path governs how far the project must go, and it should be agreed with the department before design is developed rather than negotiated at review. In the city’s designated historic districts (the Downtown Central Business District, the Geneva Street residential area and the Northside residential area) a Certificate of Appropriateness from the Historic Preservation Commission is needed before building permits for exterior alterations, additions, demolition, new construction, signs, fences and outbuildings. Community Development (334-705-5155) handles the applications. The Pepperell Mill and Village area is not a designated district.
Not sure this scope needs a permit?
Get a free quote →In 2025, building permits issued in Opelika authorized 568 new privately owned housing units, 564 of them single-family homes, according to the U.S. Census Bureau Building Permits Survey.
A county’s building code applies in its unincorporated areas; inside a city it applies only with the city’s consent, so confirm for the specific parcel whether the city or the county issues. Outside the city limits, a county code may be enforced in a city’s police jurisdiction only as § 11-40-10(b)(2) provides. County authority and police jurisdictions in Alabama
Permit types
Residential permits
Residential work spans subdivision and infill construction, renovation in the established neighbourhoods, and rental housing serving the wider Auburn–Opelika employment base. On older stock the existing-building provisions determine how far a renovation must go, and occupancy questions arise where properties are converted to multi-tenant use.
For a residential permit the owner or developer submits one complete set of plans (foundation, floor plan, electrical, plumbing and mechanical drawings) with a REScheck report and the Residential Building Permit Application. The plans must show heated, covered porch and garage square footage, and the contract cost is given without the land. Where the house is on a septic tank, the division needs a copy of the septic tank certificate from the Health Department. Water, sewer and power applications and construction power are the owner’s or contractor’s job.
Commercial permits
Commercial and industrial work is the city's distinguishing category: manufacturing and supplier facilities, distribution, highway corridor retail and service, and downtown adaptive reuse. Large industrial packages bring special inspection, deferred submittals and substantial site engineering, and utility capacity is worth confirming early on any significant load.
A commercial submittal is two complete sets of plans and a PDF: site plan, foundation plan, floor plan, electrical, plumbing and mechanical plans and a COMcheck, with sprinkler plans where they apply. The permit application checklist must be completed and the full contract cost stated; the application also asks for the number of restrooms, which is used for the sewer assessment.
Statewide rules also shape Alabama submittals: commercial and multi-family plans must be sealed by an Alabama-licensed design professional where the thresholds require it; a parcel in a FEMA Special Flood Hazard Area generally needs floodplain approval before the building permit; where adopted, storm shelter (ICC 500) and coastal wind provisions drive the detailing; and no state, county or city body may require residential fire sprinklers (§ 34-14A-12.2). Sealed plans, flood, storm and sprinklers in Alabama
Opelika permit costs and fees
Opelika’s building permit fees are set by § 5-17.1 of the city code and charged on the total valuation of the work, taken from the International Code Council building valuation tables in effect on 1 January or from a bona fide contract amount. A plan review fee is due only when the valuation exceeds $250,000, and sewer assessment fees must be paid before a permit is issued. Auburn and Lee County maintain their own separate schedules.
Rather talk it over?
Call 1-855-478-4290 →| Valuation or item | Fee |
|---|---|
| Less than $1,000 | No fee unless an inspection is required; then $25 per inspection |
| $1,000 to $50,000 | $8 per $1,000 or fraction |
| Over $50,000 to $100,000 | $400 for the first $50,000 plus $6 per additional $1,000 or fraction |
| Over $100,000 to $1,000,000 | $700 for the first $100,000 plus $5 per additional $1,000 or fraction |
| Over $1,000,000 | $5,200 for the first $1,000,000 plus $4 per additional $1,000 or fraction |
| Plan review, valuation over $250,000 | $800 for the first $500,000 plus $0.60 per $1,000 or fraction above $500,000, paid when the plans are submitted |
| Contractor’s licence tax | 0.25% of the total contract price, collected when the permit is issued (§ 14-327) |
| State craft training fee, non-residential work | $1 per $1,000 of construction authorized |
| Sewer access fee (§ 28-108) | $1,700 per equivalent connection inside the city limits; a single-family home counts as one connection |
| Moving a building | $100 |
| Demolition | $50 |
| Work started before the permit | The fee is doubled |
| Re-inspection | $25 for the second re-inspection; $100 for each one after that |
Example: a house valued at $200,000 pays $700 plus $5 x 100 = $1,200 for the building permit, before the licence tax, the sewer access fee and the trade permits.
Need a real number for a specific Opelika project? Send us the scope, address and valuation and we will identify the filing path, the reviews it will trigger and the fee categories that will apply.
Fee schedules are revised on each jurisdiction’s own cycle, so ask Opelika for the schedule in force on your filing date, and ask separately about plan review, trade, re-inspection and revision charges. How Alabama permit fees work
Trade permits and who may pull them
Permit required
- Electrical service installations, panel upgrades, new circuits, solar PV and EV chargers
- New plumbing, repipes, water heater change-outs, backflow, gas and sewer connections
- HVAC installation and change-out, ductwork, venting and commercial kitchen exhaust
- Fire alarm, sprinkler and suppression systems on commercial work
Typically exempt
- Replacing a fixture, switch, receptacle or light with no alteration to wiring or piping
- Clearing a stoppage without replacing or rearranging concealed piping
- Filter, thermostat and routine component service
- Appliance repair that does not alter the gas, electrical or venting connection
Rather not deal with the building department?
Get a free quote →Electrical, plumbing and mechanical contractors apply for their own permits on the division’s Electrical, Plumbing and Mechanical Permit Applications and call for their own inspections. A homeowner may install or maintain plumbing on their own property for their own family’s use, but still needs the permit and pays the fees (§ 5-194 of the city code).
| Trade | Fee basis |
|---|---|
| Electrical (§ 5-57) | $15 issuance fee; services, sub-feed panels and generators $0.30 per ampere; motors $10 each; appliances $5 each; photovoltaic systems $25 per kW; swimming pools and fire alarm systems $100 each |
| Plumbing (§ 5-163) | $10 issuance fee; $3 per fixture, drain or trap; $10 per sewer line installed, replaced or altered; $3 per gas piping outlet |
| Mechanical (§ 5-138) | $10 issuance fee plus $3 per $1,000 or fraction of the installation value |
Alabama licenses contractors through five state boards: the Licensing Board for General Contractors (undertakings of $100,000 or more), the Home Builders Licensure Board (residential work over $10,000, and residential roofing over $2,500), and separate electrical, plumbing and gas, and HVAC boards that license by trade regardless of project value. A local business licence and registration with the building department are commonly required as well. Contractor licensing in Alabama
How to apply for an Opelika building permit
The division covers the Opelika city limits. Auburn has its own department and Lee County Building Inspections takes the unincorporated county.
Exterior work in the Downtown, Geneva Street or Northside historic districts needs a Certificate of Appropriateness first; Community Development is on 334-705-5155.
Bring one complete set with a REScheck for a house, or two complete sets, a PDF and a COMcheck for commercial work, with the division’s permit application, to 710 Fox Trail between 7:00 a.m. and 4:00 p.m.
The request is routed to each department. Residential approval takes 3 to 4 business days; on commercial work the architect is told of any corrections and resubmits.
Fees are collected once every department approves, and sewer assessment fees come first. The permit job site poster must be up at the site, or no inspection is made.
The owner or contractor calls or emails for each inspection, and the trades call for their own. After the final passes, the certificate is written and collected from the division.
Review rules, permit duration, revival and appeal routes come from each Alabama jurisdiction’s own ordinance, so ask Opelika which code editions apply on your filing date, how long a permit stays valid and where appeals go. Where a jurisdiction has adopted no building code, no building permit is issued, but zoning, floodplain, health and utility requirements can still apply. Review and corrections in Alabama
Inspections in Opelika
Standard checkpoints include foundation, framing, rough-in electrical, plumbing and mechanical, insulation and final, with a certificate of occupancy required before legal occupancy or use. Industrial projects add structural special inspection and fire system acceptance, and renovations add existing-condition verification.
Want this handled start to finish?
Get a free quote →Inspections are requested by email or phone; the division passes each request to the inspector. A pass gets a green tag. A failed inspection gets a red tag listing the corrections, and the inspector holds the request until you call for the re-inspection; a second red tag on the same inspection costs $25 before anything further is inspected, and each one after that $100. Once the final passes, the inspector asks for the Certificate of Occupancy to be written, and a Letter of Completion is issued for a permitted renovation or addition when all its inspections are done. The 2026 application forms add that construction debris must be cleared before the certificate is issued and that a portable toilet must be on site before temporary construction power is released.
Do not cover work before the required inspection has been approved. Keep the issued permit, the approved plans, energy documentation, product listings, special-inspection reports and your correction responses available on site.
Opelika permit search and official resources
Permit records sit with the authority that issued them, which in Alabama makes record research a jurisdictional question before it is a clerical one. A search of the wrong office returns nothing and proves nothing — and in parts of the state a property may genuinely have no permit history because no permit was ever required. If you are buying, refinancing or renovating an existing building, ask Opelika’s Building Inspection Division what it holds for the parcel, whether any permit was closed without a final inspection, and whether the property was inside the enforcing jurisdiction at the time the work was done.
Annexation, changing police jurisdiction boundaries and counties adopting codes at different times all mean that the authority over a parcel today is not necessarily the authority that governed it when a previous addition or alteration was built.
Verify the code edition against the jurisdiction and the date — and, in Alabama right now, against the 2027 transition. Local adoption cycles differ, local amendments differ, and the statewide residential obligation under Act 2024-443 begins on 1 January 2027. A project designed in one code year, permitted in another and completed after the transition can touch all three positions. One conversation with the department, tied to your specific filing date, settles it.
These are the primary sources behind this guide. Codes, fee schedules and portal procedures change, and in Alabama a jurisdiction’s own published packet can lag an adoption by months — the adopted ordinance governs, not an un-updated handout. Confirm the position for your filing date.
- City of Opelika
- Opelika Building Inspection Division
- Residential Building Permit Process
- Commercial Building Permit Process
- Building Inspection downloadable forms
- Opelika Business Portal
- Opelika Code of Ordinances, Chapter 5
- Lee County Building Inspections
- Lee County Health Department
- Alabama Home Builders Licensure Board
- Alabama Licensing Board for General Contractors
- Alabama State Building Code (Division of Construction Management)
- Code of Alabama Title 34, Chapter 14A
Inspections are where schedules slip.
Get a free quote →Frequently asked questions
Is Opelika the same permitting jurisdiction as Auburn?
No. They are separate cities with separate building departments, adopted codes and fee schedules, despite forming one continuous urban area. Unincorporated Lee County is a third authority.
Which code edition applies?
The 2021 International Building Code and 2021 International Residential Code, with all appendices and local amendments, adopted by Ordinance 023-24 on 17 September 2024. Energy requirements follow the Alabama Commercial and Residential Energy Codes.
What are the counter hours?
The Public Works office at 710 Fox Trail, where the division sits, is open Monday to Friday, 7:00am to 4:00pm. Inspection requests can be made by email or phone.
What should I expect on an industrial project?
Structural special inspection, deferred submittals, substantial mechanical and electrical scope, fire protection and utility capacity questions. The building permit is generally one workstream among several.
What governs a downtown renovation?
The existing building compliance path, agreed with the department, which determines how much of the building must be brought to current requirements.
How much is a building permit in Opelika?
By valuation under § 5-17.1 of the city code: $8 per $1,000 up to $50,000, $400 plus $6 per $1,000 to $100,000, and $700 plus $5 per $1,000 to $1,000,000. A $200,000 house is $1,200, plus the 0.25% contractor’s licence tax, sewer access fee and trade permits.
How long does plan review take in Opelika?
The city gives 3 to 4 business days for residential approval. Commercial plans are reviewed by Planning, a Fire Inspector and the Building Inspection Division, and the architect is notified of any corrections to make before resubmitting.
Can I apply for an Opelika permit online?
Not yet. The Opelika Business Portal shows the status of permits, inspections and plans and takes invoice payments, and the city says online applications are coming; for now the division’s permit application forms are used.
Can a homeowner do their own plumbing in Opelika?
Yes, on their own property for their own family’s use, but the permit and fees still apply (§ 5-194 of the city code).
What changes on 1 January 2027?
Under Act 2024-443 a residential home builder must build in accordance with the applicable residential building code from that date. The duty attaches to the builder's licence rather than to a local building department, so it applies even where no inspector will attend.
Simplify Opelika permitting with Alliance Permitting
Opelika’s most common error is the simplest one: being treated as part of Auburn. It is a separate authority with its own codes, fees and process.
Trusted by leading builders, developers, and national contractors — 21+ years of filing in the jurisdictions we write about.
Contractors and builders choose Alliance for Opelika because the work is done by people who have stood at the counter:
- We confirm Opelika versus Auburn versus unincorporated Lee County on the parcel.
- We establish the city's adopted editions independently of its neighbour's.
- We treat utility capacity and site work as critical path on industrial projects.
- We agree the existing-building path before downtown renovation design.
- We work submittals and inspection requests around a 4:00pm close.
Alliance Permitting is a permit documentation and submission company in Alabama. We prepare your paperwork, file it correctly and coordinate with the building department through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Opelika sooner?
Let Alliance prepare, file, and track your Opelika permits while your crew stays on the job.
More Alabama permitting guides
This guide is provided by Alliance Permitting for general information about Opelika permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.